← Back
Two family frame
150-11 114 PLACE
QUEENS · South Ozone Park · BIN 4257110
💬 Discuss this project
1960Year Built
2Stories
B2Building Class
R3XZoning
2,066 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 6,000 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
Architecture
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE OWNER OF103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAHMAL SABAHA PE CONSULTING ENGR305/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KMS DRAFTING603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAE MGMT INCGeneral Contractor603/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519205/18/2022
Building Lifecycle
All (32)Filed (3)Permit Issued (4)Signed Off (2)Violation (1)Objection (10)Special Inspection (12)
07/28/2022
Signed off — Alteration
Propose new plumbing fixtures throughout with related components as per plans. Filed in conjunction with Alteration application # 440600360. No change to use bulk or egress.
Q00323305-I1
05/23/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Younes Abouyaala
05/23/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
05/23/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
05/23/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/23/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/23/2022
Special inspection requirement — HVAC insulation and sealing
Jahmal Sabaha
05/18/2022
Filed — Alteration
Propose new plumbing fixtures throughout with related components as per plans. Filed in conjunction with Alteration application # 440600360. No change to use bulk or egress.
Q00323305-P1
05/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
05/12/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Younes Abouyaala
05/12/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Younes Abouyaala
05/12/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Younes Abouyaala
05/12/2022
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
05/12/2022
Special inspection requirement — HVAC insulation and sealing
Jahmal Sabaha
02/08/2022
Permit issued — Plumbing
Q00323305-I1-PL
09/14/2021
Signed off — Alteration
PROPOSE CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE, BULK OR EGRESS.
Q00371986-I1
07/18/2021
Permit issued — Construction Fence
Q00371986-I1-FN
09/23/2020
Permit issued — Plumbing
Q00323305-I1-PL
08/13/2020
Permit issued — Construction Fence
Q00371986-I1-FN
07/24/2020
Objection raised — Inspections
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Mechanical
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Scope
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Structural
07/24/2020
Objection resolved — Addressed
07/24/2020
Objection raised — Scope
07/24/2020
Objection resolved — Addressed
07/22/2020
Filed — Alteration
Propose new plumbing fixtures throughout with related components as per plans. Filed in conjunction with Alteration application # 440600360. No change to use bulk or egress.
Q00323305-I1
07/22/2020
Filed — Alteration
PROPOSE CONSTRUCTION FENCE AS PER PLANS. NO CHANGE TO USE, BULK OR EGRESS.
Q00371986-I1
12/07/2006
Violation issued (ECB, closed)
Zoning
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP02/08/2022
DOB NOWConstruction FenceSigned-offRAE MGMT INC07/18/2021
DOB NOWPlumbingSigned-offFLAVIO MECHANICAL CORP09/23/2020
DOB NOWConstruction FenceSigned-offRAE MGMT INC08/13/2020
BISOTISSUEDRAE MGMT INC07/16/2021
BISOTISSUEDRAE MGMT INC09/09/2020
BISOTISSUEDF1 CONSTRUCTION INC02/29/2012
1 project · most recent 02/07/2022
General Wiring
FiledStatusContractorScope
02/07/2022CompleteSUPREME ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
05/23/2022Subsurface Investigations (Borings/Test Pits)Younes Abouyaalaspecial
05/23/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
05/23/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
05/23/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/23/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/23/2022HVAC insulation and sealing Jahmal Sabahaenergy_progress
05/12/2022Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
05/12/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYounes Abouyaalaspecial
05/12/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesYounes Abouyaalaspecial
05/12/2022Subsurface Investigations (Borings/Test Pits)Younes Abouyaalaspecial
05/12/2022Energy Code Compliance InspectionsYounes Abouyaalaprogress
05/12/2022HVAC insulation and sealing Jahmal Sabahaenergy_progress
▾Documents — 107 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00323305-P1Request digital key ↗
08/15/2026Q00323305-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/14/2026Q00371986-I1Request digital key ↗
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
08/05/2022421720463Open ↗
10/12/2021440600360Open ↗
12/03/2020440600360Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION2
09/09/2020440600360Open ↗
03/01/2012420483836Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
09/01/2020440600360Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
09/01/2020440600360Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00323305-I1Open ↗
08/13/2026Q00323305-P1Open ↗
▸BISPDI AND HOUSE VERICATION W/TOPO STAMP1
09/01/2020440600360Open ↗
▸BISDOB - ZONING DIAGRAM (ZD1)1
08/03/2020440600360Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature8
08/28/2026Q00323305-I1Open ↗
08/28/2026Q00323305-I1Open ↗
08/28/2026Q00323305-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/18/2019420483836Open ↗
06/18/2019420483836Open ↗
04/12/2019420483836Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026Q00323305-I1Open ↗
08/28/2026Q00323305-I1Open ↗
08/26/2026Q00323305-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/28/2026Q00323305-I1Open ↗
08/28/2026Q00323305-P1Open ↗
08/28/2026Q00371986-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/01/2020440600360Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
07/01/2020440600360Open ↗
04/09/2019421720463Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/01/2012420483836Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/01/2020440600360Open ↗
04/09/2019421720463Open ↗
11/25/2011420483836Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00323305-P1Open ↗
08/15/2026Q00323305-I1Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
07/29/2022420483836Open ↗
07/26/2022440600360Open ↗
07/25/2022440600360Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
06/18/2019420483836Open ↗
06/18/2019420483836Open ↗
04/12/2019420483836Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/02/2022420483836Open ↗
07/25/2022440600360Open ↗
▸BISTECHNICAL REPORT: ENERGY2
03/01/2012420483836Open ↗
09/21/2011420483836Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
07/27/2022440600360Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY8
07/29/2022420483836Open ↗
07/26/2022440600360Open ↗
07/25/2022440600360Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026Q00323305-P1Open ↗
08/13/2026Q00323305-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/01/2020440600360Open ↗
▸BISSOIL REPORT1
08/03/2020440600360Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00323305-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISSUPERSEDING LETTER2
06/18/2019420483836Open ↗
04/12/2019420483836Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/03/2022420483836Open ↗
07/29/2022440600360Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/01/2012420483836Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/21/2011420483836Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT5
07/01/2020440600360Open ↗
06/18/2019420483836Open ↗
04/12/2019420483836Open ↗
Showing 3 of 5 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/29/2022420483836Open ↗
07/26/2022440600360Open ↗
▸Filing & Intake Forms12
▸BISADDITIONAL INFORMATION9
10/15/2021440600360Open ↗
09/01/2021440600360Open ↗
07/17/2020440600360Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING COVER SHEET2
04/09/2019421720463Open ↗
09/21/2011420483836Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/01/2020440600360Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
08/03/2022420483836Open ↗
07/26/2022440600360Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
07/01/2020440600360Open ↗