Two stories - detached, small or mid-size
150-11 84 DRIVE
QUEENS · BIN 4208721
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3XZoning
2,320 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: 15011 84 LLC · 5,100 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SBMH PROPERTIES2407/08/2026
15011 84 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/15/2023$880K—Private party → 15011 84 LLC$379/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT912/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FS CONTRACTING CORPGeneral Contractor407/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642812/16/2025
BUILDTECH ENGINEERING6369312/16/2025
Building Lifecycle
All (55)Filed (9)Permit Issued (4)Signed Off (3)Violation (2)Inspection (5)Objection (2)Special Inspection (30)
05/12/2026
Signed off — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-S1
05/06/2026
Signed off — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-I1
05/05/2026
Signed off — Alteration
Q00997863-I1
04/23/2026
Permit issued — Construction Fence
Q00997863-I1-FN
03/11/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2026
Permit issued — Plumbing
Q00997216-S1-PL
01/07/2026
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Structural Steel - Details
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Masonry
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Final
TARIQ SIDDIQUI
01/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Demolition
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
01/07/2026
Special inspection requirement — Footing and Foundation
MUZAFFAR JAMAL
12/16/2025
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P5
12/16/2025
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P6
12/16/2025
Special inspection requirement — Subgrade Inspections
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Structural Steel - Details
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Mechanical Systems
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Masonry
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Heating Systems
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
12/16/2025
Special inspection requirement — Demolition
MUZAFFAR JAMAL
09/22/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
05/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2025
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P4
04/16/2025
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P3
02/07/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
12/18/2024
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P2
10/14/2024
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-P1
09/19/2024
Permit issued — Plumbing
Q00997216-S1-PL
09/10/2024
Permit issued — Mechanical Systems
Q00997216-I1-GC-CX
07/24/2024
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-S1
06/18/2024
Objection raised — Other
06/18/2024
Objection resolved — Addressed
06/10/2024
Filed — Alteration
Q00997863-I1
03/22/2024
Violation issued (ECB, closed)
Construction
02/01/2024
Filed — Alteration
Replace existing heating / HWH fixtures. Replace existing kitchen and bathroom fixtures as per drawings herewith filed. No change egress use or occupancy.
Q00997216-I1
01/10/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offFS CONTRACTING CORP04/23/2026
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS01/28/2026
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS09/19/2024
DOB NOWMechanical SystemsSigned-offFS CONTRACTING CORP09/10/2024
1 project · most recent 12/16/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/16/2025Signed-offDYNAMIC PLBG & SPRKLR CORGas, Storm, Water/Sanitary
3 projects · most recent 01/06/2026
General Wiring
FiledStatusContractorScope
01/06/2026CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
07/19/2024CompleteTIMOTHY COLEMAN LICENSEDGeneral Wiring
07/18/2024CancelledTIMOTHY COLEMAN LICENSEDGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/11/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/22/2025Fail-Final General Construction Non-Directive 14FailView ↗
05/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/07/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
01/07/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
01/07/2026Interior lighting powerMUZAFFAR JAMALenergy_progress
01/07/2026Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
01/07/2026HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
01/07/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
01/07/2026Structural Stability – Alterations of existing buildingsMUZAFFAR JAMALspecial
01/07/2026Heating SystemsMUZAFFAR JAMALspecial
01/07/2026MasonryMUZAFFAR JAMALspecial
01/07/2026FinalTARIQ SIDDIQUIprogress
01/07/2026Footing and FoundationMUZAFFAR JAMALprogress
01/07/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
01/07/2026Fire-Resistance Rated ConstructionMUZAFFAR JAMALprogress
01/07/2026Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
01/07/2026Fenestration air leakageMUZAFFAR JAMALenergy_progress
01/07/2026Air barrier - visual inspectionMUZAFFAR JAMALenergy_progress
01/07/2026DemolitionMUZAFFAR JAMALspecial
01/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
01/07/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
01/07/2026Subgrade InspectionsMUZAFFAR JAMALspecial
01/07/2026Mechanical SystemsMUZAFFAR JAMALspecial
01/07/2026Structural Steel - DetailsMUZAFFAR JAMALspecial
12/16/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
12/16/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
12/16/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
12/16/2025Fenestration air leakageMUZAFFAR JAMALenergy_progress
Latest 25 of 110.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026Q00997863-I1Request digital key ↗
08/20/2026Q00997216-P6Request digital key ↗
08/20/2026Q00997216-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications118
▸DOB NOWProgress Inspector Seal & Signature62
09/01/2026Q00997216-P1Open ↗
09/01/2026Q00997216-P1Open ↗
09/01/2026Q00997216-P1Open ↗
Showing 3 of 62 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature47
09/01/2026Q00997216-P1Open ↗
09/01/2026Q00997216-P1Open ↗
09/01/2026Q00997216-P1Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/20/2026Q00997216-P6Open ↗
08/20/2026Q00997216-P5Open ↗
08/20/2026Q00997216-S1Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026Q00997216-P6Open ↗
08/20/2026Q00997216-P5Open ↗
08/20/2026Q00997216-S1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00997216-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00997216-I1Open ↗