← Back
One family attached or semi-detached
150-12 COOLIDGE AVENUE
QUEENS · Jamaica Hills-Briarwood · BIN 4145742
💬 Discuss this project
1920Year Built
2Stories
A5Building Class
R4-1Zoning
1,280 sfGross Floor Area
1Units
One family attached or semi-detached · 2,300 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
UNGJIB PARK ARCHITECT, PC106/25/2021
Building Lifecycle
All (20)Filed (1)Objection (8)Special Inspection (11)
10/27/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
07/20/2021
Objection raised — Inspections
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Scope
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Zoning
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Scope
07/20/2021
Objection resolved — Addressed
06/25/2021
Filed — Alteration CO
TO CONVERT (2) FAMILY FROM EXISTING (1) FAMILY HOUSE. INCLUDING NEW INTERIOR PARTITIONS, MECH, AND PLUMBING WORKS WITH HORIZONTAL ENLARGEMENT
Q00529049-I1
06/07/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/07/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/07/2021
Special inspection requirement — Fenestration and door U-factor and product ratings
06/07/2021
Special inspection requirement — Insulation placement and R values
06/07/2021
Special inspection requirement — Fenestration air leakage
06/07/2021
Special inspection requirement — Energy Code Compliance Inspections
06/07/2021
Special inspection requirement — Fire-Resistance Rated Construction
06/07/2021
Special inspection requirement — Fenestration areas
05/26/2021
Special inspection requirement — Final
05/26/2021
Special inspection requirement — Mechanical Systems
Nothing on file for this building.
1 project · most recent 06/25/2021
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/25/2021——Heating Systems
Heating
U.S. Boiler BOILER 2 BTU · Boiler ×2
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
10/27/2021Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
06/07/2021Fire-Resistant Penetrations and Joints—special
06/07/2021Structural Stability – Alterations of existing buildings—special
06/07/2021Fenestration and door U-factor and product ratings—energy_progress
06/07/2021Insulation placement and R values—energy_progress
06/07/2021Fenestration air leakage—energy_progress
06/07/2021Energy Code Compliance Inspections—progress
06/07/2021Fire-Resistance Rated Construction—progress
06/07/2021Fenestration areas—energy_progress
05/26/2021Final—progress
05/26/2021Mechanical Systems—special
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026Q00529049-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q00529049-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026Q00529049-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026Q00529049-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026Q00529049-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026Q00529049-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026Q00529049-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Plot Diagram1
08/14/2026Q00529049-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q00529049-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026Q00529049-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q00529049-I1Open ↗
▸DOB NOWPlot Diagram1
08/14/2026Q00529049-I1Open ↗
▸DOB NOWSURVEY: INITIAL1
08/14/2026Q00529049-I1Open ↗