← Back
Two stories - detached, small or mid-size
150-15 85 AVENUE
QUEENS · BIN 4208699
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R3XZoning
2,140 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 13 docs
Floor 16p · 2 filings · 13 docs
Cellar7p · 2 filings · 13 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/19/2021$720K—Private party → Private party$336/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHANDA ENGINEERING CONSULTANT PC208/14/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NASARIN CONTRACTING CORPGeneral Contractor307/08/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
KISHAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616108/14/2021
CHANDA ENG. CONSULTANT PC6842105/08/2021
Building Lifecycle
All (37)Filed (2)Permit Issued (4)Violation (4)Inspection (7)Objection (16)Special Inspection (4)
02/12/2025
Permit issued — General Construction
Q00518697-I1-GC
10/10/2024
Violation issued (ECB, closed)
Construction
10/10/2024
Violation issued (ECB, open)
Construction
10/10/2024
Violation issued (ECB, open)
Construction
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/07/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2024
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
04/30/2024
Permit issued — Plumbing
Q00551959-I1-PL
08/08/2023
Violation issued (ECB, closed)
Construction
05/08/2023
Permit issued — General Construction
Q00518697-I1-GC
08/11/2022
Permit issued — General Construction
Q00518697-I1-GC
08/19/2021
Objection raised — Scope
08/19/2021
Objection resolved — Addressed
08/14/2021
Filed — Alteration
Proposed to install one three fixture bathroom, laundry equipment, boiler and hot water heater in cellar floor. Proposed to install one new kitchen in 2nd floor for 2nd floor dwelling unit. Install one bathroom in 1st floor dwelling unit. One area drain.
Q00551959-I1
08/14/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/14/2021
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/14/2021
Special inspection requirement — Maintenance information
FAHAD FATEH
08/14/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/25/2021
Objection raised — Zoning
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Zoning
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Other
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Zoning
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Zoning
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Structural
06/25/2021
Objection resolved — Addressed
06/25/2021
Objection raised — Zoning
06/25/2021
Objection resolved — Addressed
05/08/2021
Filed — Alteration CO
Application filing to interior minor renovation and convert one (1) to two (2) family dwellings within existing bulk with related plumbing work. To obtain new certificate of occupancy (CO).
Q00518697-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNASARIN CONTRACTING CORP02/12/2025
DOB NOWPlumbingPermit IssuedN AND S PLUMBING INC04/30/2024
DOB NOWGeneral ConstructionPermit IssuedNASARIN CONTRACTING CORP05/08/2023
DOB NOWGeneral ConstructionPermit IssuedNASARIN CONTRACTING CORP08/11/2022
1 project · most recent 08/14/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/14/2021Permit IssuedKISHAN PLUMBING INCGas, Storm, Water/Sanitary
2 projects · most recent 09/07/2026
General Wiring
FiledStatusContractorScope
09/07/2026CompleteMAGIC ELECTRIC INCGeneral Wiring
07/25/2022Permit IssuedGREEN POWER ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/14/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/14/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
08/14/2021Maintenance informationFAHAD FATEHenergy_progress
08/14/2021HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026Q00518697-I1Request digital key ↗
08/14/2026Q00551959-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q00551959-I1Open ↗
08/23/2026Q00551959-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00518697-I1Open ↗
08/13/2026Q00551959-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q00551959-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist1
08/13/2026Q00518697-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00518697-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00518697-I1Open ↗
08/13/2026Q00551959-I1Open ↗
▸Other Documents2
▸DOB NOWSURVEY: INITIAL1
08/13/2026Q00518697-I1Open ↗
▸DOB NOWSanborn Map or similar1
08/13/2026Q00518697-I1Open ↗