LL97 Covered2 Open Violations 0 unresolved · 2 paperwork only▸
ECB10/22/2025REISSUE #35678697X DATE OF ISSUE: 03-22-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED AND NOTED AT RAMP BY EXIT 4 CONCRETE IS CRACKING AND DISREPAIRED, DETERIORNothing owed — awaiting certificate of correction
ECB03/22/2024FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.RAMP BY EXIT 4 CONCRETE IS CRACKING AND DETORIATED IN MANY AREAS OF RAMP.REM:REPAIR AND/OR REPLACE.Nothing owed — awaiting certificate of correction
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF PARKS AND RECREATION · 121,700 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.