1950Year Built
1.5Stories
B2Building Class
R3XZoning
2,148 sfGross Floor Area
2Units
Two family frame · Owner of record: ROSS 132 CORP. · 6,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/23/2024$760K—Private party → ROSS 132 CORP.$354/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP506/27/2025
TABRIZ GROUP ENTERPRISES201/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ GROUP ENTERPRISE703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ASSURED BUILDERS INCGeneral Contractor307/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
IP CONCRETE TESTING AND I6252406/27/2025
TABRIZ GROUP ENTERPRISES3275606/27/2025
Building Lifecycle
All (48)Filed (7)Permit Issued (3)Signed Off (2)Inspection (6)Special Inspection (30)
02/27/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/19/2025
Special inspection requirement — Masonry
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Concrete - Cast-In-Place
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Fenestration areas
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Air barrier - visual inspection
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Air barrier — testing
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Maintenance information
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Permanent certificate
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Interior lighting power
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Fenestration air leakage
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Insulation placement and R values
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Energy Code Compliance Inspections
BAKHTIAR SHAMLOO
09/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
07/10/2025
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01106635.
Q01120927-I1
06/30/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
06/30/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
06/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
06/27/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01106635.
Q01120927-P3
06/27/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
06/27/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
06/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
06/24/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01106635.
Q01120927-P2
06/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
06/24/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
06/24/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
06/06/2025
Signed off — Alteration
Q01112902-I1
06/05/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01106635.
Q01120927-P1
05/22/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
INDARDEO PARBHUNATH
05/22/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
05/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/21/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
02/21/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/28/2025
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT TO EXISTING ONE-STORY BUILDING, TWO FAMILY TO REMAIN. FILING FOR NEW CO.
Q01106635-P1
01/28/2025
Special inspection requirement — Metering
BAKHTIAR SHAMLOO
01/27/2025
Permit issued — Plumbing
Q01120927-I1-PL
01/03/2025
Permit issued — General Construction
Q01106635-I1-GC
12/19/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT# Q01106635.
Q01120927-I1
09/27/2024
Permit issued — Construction Fence
Q01112902-I1-FN
09/18/2024
Filed — Alteration
Q01112902-I1
09/17/2024
Filed — Alteration CO
PROPOSED VERTICAL ENLARGEMENT TO EXISTING ONE-STORY BUILDING, TWO FAMILY TO REMAIN. FILING FOR NEW CO.
Q01106635-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR01/27/2025
DOB NOWGeneral ConstructionPermit IssuedASSURED BUILDERS INC01/03/2025
DOB NOWConstruction FenceSigned-offASSURED BUILDERS INC09/27/2024
1 project · most recent 05/08/2025
General Wiring
FiledStatusContractorScope
05/08/2025CompleteASCUATECH ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
09/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/21/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/21/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
09/19/2025MasonryBAKHTIAR SHAMLOOspecial
09/19/2025Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
09/19/2025Concrete - Cast-In-PlaceBAKHTIAR SHAMLOOspecial
09/19/2025Electric vehicle service equipment requirementsBAKHTIAR SHAMLOOenergy_progress
09/19/2025Fenestration areasBAKHTIAR SHAMLOOenergy_progress
09/19/2025MeteringBAKHTIAR SHAMLOOenergy_progress
09/19/2025Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
09/19/2025Air barrier — testing BAKHTIAR SHAMLOOenergy_progress
09/19/2025Maintenance informationBAKHTIAR SHAMLOOenergy_progress
09/19/2025Permanent certificateBAKHTIAR SHAMLOOenergy_progress
09/19/2025Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
09/19/2025Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
09/19/2025Fenestration air leakageBAKHTIAR SHAMLOOenergy_progress
09/19/2025Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
09/19/2025Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
09/19/2025Energy Code Compliance InspectionsBAKHTIAR SHAMLOOprogress
09/19/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
06/30/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
06/30/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
06/30/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
06/27/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesINDARDEO PARBHUNATHspecial
06/27/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
06/27/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
06/24/2025Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
06/24/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
Latest 25 of 46.
▾Documents — 51 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01112902-I1Request digital key ↗
08/21/2026Q01120927-P3Request digital key ↗
08/21/2026Q01120927-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01106635-P1Open ↗
08/13/2026Q01106635-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01106635-P1Open ↗
08/13/2026Q01106635-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01106635-I1Open ↗
08/13/2026Q01106635-P1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q01120927-P1Open ↗
09/01/2026Q01120927-P1Open ↗
08/25/2026Q01106635-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01112902-I1Open ↗
08/21/2026Q01106635-I1Open ↗
08/21/2026Q01106635-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026Q01106635-P1Open ↗
08/25/2026Q01106635-P1Open ↗
08/25/2026Q01106635-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01106635-P1Open ↗
08/13/2026Q01106635-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01106635-P1Open ↗
08/21/2026Q01106635-I1Open ↗
08/13/2026Q01120927-P3Open ↗
Showing 3 of 6 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q01106635-P1Open ↗
08/13/2026Q01106635-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q01106635-I1Open ↗
08/13/2026Q01106635-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01106635-P1Open ↗
08/13/2026Q01106635-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026Q01106635-P1Open ↗
08/21/2026Q01106635-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01106635-I1Open ↗