← Back
General warehouse
150-24 BEAVER ROAD
QUEENS · BIN 4215641
💬 Discuss this project
1975Year Built
1Stories
E1Building Class
M1-2A/R7-2Zoning
38,400 sfGross Floor Area
1Units
LL97 Covered2 Open Violations 1 unresolved · 1 paperwork only ▸FDNY Report ↗
General warehouse · Owner of record: 150 BEAVER ROAD, LLC · 59,000 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Floor 13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
150 BEAVER ROAD, LLC103/22/2026
150 BEAVER ROAD LLC METRO103/22/2026
EAST END BUILDERS AND AS103/22/2026
RITA STARK ESTATE603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GNK ENGINEERING, P.C604/20/2021
ANAND J. SOLANKI, P.E.207/01/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GW MECHANICAL CORPPlumbing607/08/2026
PHOENIX PLMBG & MECH CORPFire Protection407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CERTIFIED TESTING LABORAT396404/20/2021
ASIF JAMIL R.A.7506210/15/2020
ANAND J. SOLANKI, P.E.3662207/01/2020
Building Lifecycle
All (72)Filed (8)Permit Issued (10)Signed Off (2)Violation (12)Objection (14)Special Inspection (26)
05/15/2024
Violation issued (ECB, open)
Unknown
09/27/2023
Violation issued (ECB, open)
Construction
08/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2021
Signed off — Alteration
INSTALLATION OF HEATING SYSTEM FOR THE EXISTING WAREHOUSE WITH GAS UNIT HEATERS.
Q00320122-I1
06/02/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/13/2021
Special inspection requirement — HVAC and service water heating system controls
KIRT DOBBINS
05/13/2021
Special inspection requirement — Post-installed Anchors
KIRT DOBBINS
05/13/2021
Special inspection requirement — Sprinkler Systems
KIRT DOBBINS
05/13/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
05/13/2021
Special inspection requirement — HVAC and service water heating equipment
KIRT DOBBINS
04/29/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
04/20/2021
Filed — Alteration
INSTALLATION OF WET AND DRY AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING AS PER PLANS PROVIDED. NO PROPOSED CHANGES TO USES, EGRESS OR OCCUPANCY. AMENDED PLAN PROVIDED FOR APPROVAL 10/15/2020
Q00232449-P5
04/20/2021
Filed — Alteration
INSTALLATION OF HEATING SYSTEM FOR THE EXISTING WAREHOUSE WITH GAS UNIT HEATERS.
Q00320122-P1
03/30/2021
Special inspection requirement — Post-installed Anchors
KIRT DOBBINS
03/30/2021
Special inspection requirement — HVAC and service water heating system controls
KIRT DOBBINS
03/30/2021
Special inspection requirement — HVAC and service water heating equipment
KIRT DOBBINS
03/30/2021
Special inspection requirement — Sprinkler Systems
KIRT DOBBINS
03/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
03/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KIRT DOBBINS
03/08/2021
Signed off — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGHING CONNECTED TO EXISTING HOUSE TRAP AND SEWER CONNECTION FOR BATHROOMS AND UTILITY ROOM IN EXISTING PLOT FOR STORAGE OF MORE THAN FIVE MOTOR VEHICLES AND GAS PUMPS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00316176-I1
01/15/2021
Permit issued — Plumbing
Q00232449-I1-EW-SP
01/13/2021
Permit issued — Plumbing
Q00320122-I1-PL
12/21/2020
Permit issued — Plumbing
Q00320122-I1-PL
11/17/2020
Permit issued — Plumbing
Q00320122-I1-PL
11/17/2020
Permit issued — Sprinklers
Q00232449-I1-EW-SP
10/15/2020
Filed — Alteration
INSTALLATION OF WET AND DRY AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING AS PER PLANS PROVIDED. NO PROPOSED CHANGES TO USES, EGRESS OR OCCUPANCY. AMENDED PLAN PROVIDED FOR APPROVAL 10/15/2020
Q00232449-P4
10/15/2020
Special inspection requirement — Sprinkler Systems
asif jamil
10/15/2020
Special inspection requirement — Post-installed Anchors
asif jamil
10/15/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
asif jamil
10/15/2020
Special inspection requirement — HVAC and service water heating equipment
asif jamil
10/15/2020
Special inspection requirement — HVAC and service water heating system controls
asif jamil
09/22/2020
Permit issued — Plumbing
Q00232449-I1-EW-SP
09/22/2020
Permit issued — Plumbing
Q00320122-I1-PL
07/14/2020
Special inspection requirement — Fire-Resistance Rated Construction
Anand Solanki
07/14/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
07/01/2020
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGHING CONNECTED TO EXISTING HOUSE TRAP AND SEWER CONNECTION FOR BATHROOMS AND UTILITY ROOM IN EXISTING PLOT FOR STORAGE OF MORE THAN FIVE MOTOR VEHICLES AND GAS PUMPS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00316176-P1
06/28/2020
Special inspection requirement — Fire-Resistance Rated Construction
Anand Solanki
06/28/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Anand Solanki
06/02/2020
Filed — Alteration
INSTALLATION OF WET AND DRY AUTOMATIC SPRINKLER SYSTEM THROUGHOUT THE BUILDING AS PER PLANS PROVIDED. NO PROPOSED CHANGES TO USES, EGRESS OR OCCUPANCY. AMENDED PLAN PROVIDED FOR APPROVAL 10/15/2020
Q00232449-P1
05/22/2020
Special inspection requirement — HVAC and service water heating equipment
asif jamil
05/22/2020
Special inspection requirement — Sprinkler Systems
asif jamil
05/22/2020
Special inspection requirement — Post-installed Anchors
asif jamil
05/22/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
asif jamil
05/22/2020
Special inspection requirement — HVAC and service water heating system controls
asif jamil
04/16/2020
Permit issued — Plumbing
Q00320122-I1-PL
03/19/2020
Filed — Alteration
INSTALLATION OF HEATING SYSTEM FOR THE EXISTING WAREHOUSE WITH GAS UNIT HEATERS.
Q00320122-I1
03/18/2020
Permit issued — Plumbing
Q00232449-I1-EW-SP
03/10/2020
Permit issued — Plumbing
Q00316176-I1-PL
02/18/2020
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES ON NEW ROUGHING CONNECTED TO EXISTING HOUSE TRAP AND SEWER CONNECTION FOR BATHROOMS AND UTILITY ROOM IN EXISTING PLOT FOR STORAGE OF MORE THAN FIVE MOTOR VEHICLES AND GAS PUMPS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00316176-I1
01/09/2020
Objection raised — Structural
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Inspections
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Structural
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Other
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Admin
01/09/2020
Objection resolved — Addressed
01/09/2020
Objection raised — Structural
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGW MECHANICAL CORP01/15/2021
DOB NOWPlumbingSigned-offGW MECHANICAL CORP01/13/2021
DOB NOWPlumbingSigned-offGW MECHANICAL CORP12/21/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP11/17/2020
DOB NOWSprinklersSigned-offGW MECHANICAL CORP11/17/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP09/22/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP09/22/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP04/16/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP03/18/2020
DOB NOWPlumbingSigned-offGW MECHANICAL CORP03/10/2020
BISEQISSUEDFHA CONTRACTING CORP08/04/2020
BISOTISSUEDFHA CONTRACTING CORP08/04/2020
BISOTISSUEDFHA CONTRACTING CORP08/04/2020
BISOTISSUEDFHA CONTRACTING CORP03/11/2020
BISEQISSUEDFHA CONTRACTING CORP02/06/2020
BISOTISSUEDFHA CONTRACTING CORP08/06/2019
BISOTISSUEDFHA CONTRACTING CORP07/15/2019
BISEQISSUEDFHA CONTRACTING CORP01/02/2019
BISOTISSUEDFHA CONTRACTING CORP01/02/2019
BISOTISSUEDFHA CONTRACTING CORP04/09/2018
BISEQISSUEDFHA CONTRACTING CORP08/01/2017
BISOTISSUEDFHA CONTRACTING CORP08/01/2017
BISOTISSUEDFHA CONTRACTING CORP05/24/2002
1 project · most recent 04/20/2021
FiledStatusContractorScope
04/20/2021Signed-offGW MECHANICAL CORP—
1 project · most recent 04/20/2021
FiledStatusContractorScope
04/20/2021———
2 projects · most recent 02/04/2020
General Wiring
FiledStatusContractorScope
02/04/2020CompleteISTRA ELEC'L CONTRS CORPGeneral Wiring
02/04/2020CompleteISTRA ELEC'L CONTRS CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/13/2021HVAC and service water heating system controls KIRT DOBBINSenergy_progress
05/13/2021Post-installed AnchorsKIRT DOBBINSspecial
05/13/2021Sprinkler SystemsKIRT DOBBINSspecial
05/13/2021Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
05/13/2021HVAC and service water heating equipment KIRT DOBBINSenergy_progress
04/29/2021Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
03/30/2021Post-installed AnchorsKIRT DOBBINSspecial
03/30/2021HVAC and service water heating system controls KIRT DOBBINSenergy_progress
03/30/2021HVAC and service water heating equipment KIRT DOBBINSenergy_progress
03/30/2021Sprinkler SystemsKIRT DOBBINSspecial
03/30/2021Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
03/23/2021Fire-Resistant Penetrations and JointsKIRT DOBBINSspecial
10/15/2020Sprinkler Systemsasif jamilspecial
10/15/2020Post-installed Anchorsasif jamilspecial
10/15/2020Fire-Resistant Penetrations and Jointsasif jamilspecial
10/15/2020HVAC and service water heating equipment asif jamilenergy_progress
10/15/2020HVAC and service water heating system controls asif jamilenergy_progress
07/14/2020Fire-Resistance Rated ConstructionAnand Solankiprogress
07/14/2020Fire-Resistant Penetrations and JointsAnand Solankispecial
06/28/2020Fire-Resistance Rated ConstructionAnand Solankiprogress
06/28/2020Fire-Resistant Penetrations and JointsAnand Solankispecial
05/22/2020HVAC and service water heating equipment asif jamilenergy_progress
05/22/2020Sprinkler Systemsasif jamilspecial
05/22/2020Post-installed Anchorsasif jamilspecial
05/22/2020Fire-Resistant Penetrations and Jointsasif jamilspecial
Latest 25 of 26.
▾Documents — 119 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch - Plumbing8
08/28/2026Q00320122-P1Request digital key ↗
08/28/2026Q00320122-I1Request digital key ↗
08/28/2026Q00316176-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
08/27/2026Q00232449-P5Request digital key ↗
08/27/2026Q00232449-P4Request digital key ↗
08/15/2026Q00232449-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits21
▸BISPLAN / WORK APPROVAL APPLICATION10
02/08/2021421757094Open ↗
02/02/2021421735974Open ↗
02/01/2021421757094Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION8
03/17/2020421757094Open ↗
02/20/2020421529411Open ↗
08/08/2019421529411Open ↗
Showing 3 of 8 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications3
02/16/2021421757094Open ↗
12/17/2020421529411Open ↗
12/01/2020421529411Open ↗
▸Seals & Professional Certifications44
▸DOB NOWSpecial Inspector Seal & Signature16
09/02/2026Q00320122-I1Open ↗
08/28/2026Q00320122-P1Open ↗
08/27/2026Q00232449-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/27/2026Q00232449-P1Open ↗
08/27/2026Q00232449-P1Open ↗
08/26/2026Q00316176-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/28/2026Q00320122-I1Open ↗
08/28/2026Q00320122-P1Open ↗
08/27/2026Q00232449-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
03/17/2020421757094Open ↗
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
08/01/2017421529411Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
08/01/2017421529411Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWFDNY: Letter of No Objection4
08/27/2026Q00232449-P4Open ↗
08/14/2026Q00232449-I1Open ↗
08/13/2026Q00232449-P5Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00232449-P4Open ↗
08/14/2026Q00232449-I1Open ↗
08/13/2026Q00316176-I1Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
08/01/2017421529411Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
08/01/2017421529411Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
02/09/2021421757094Open ↗
02/04/2021421735974Open ↗
11/30/2020421529411Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/30/2020421529411Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
02/09/2021421757094Open ↗
02/04/2021421735974Open ↗
11/30/2020421529411Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
02/16/2021421757094Open ↗
02/04/2021421735974Open ↗
12/17/2020421529411Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT4
12/17/2020421529411Open ↗
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
02/09/2021421757094Open ↗
02/04/2021421735974Open ↗
▸Filing & Intake Forms10
▸BISADDITIONAL INFORMATION6
02/08/2021421757094Open ↗
02/02/2021421735974Open ↗
07/10/2020421757094Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET3
03/07/2020421757094Open ↗
07/24/2019421735974Open ↗
08/01/2017421529411Open ↗
▸BISBOROUGH INTAKE FORM1
11/24/2017421529411Open ↗