← Back
Two family converted from one family
150-25 115 DRIVE
QUEENS · Baisley Park · BIN 4264261
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
1,568 sfGross Floor Area
2Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 2,400 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/27/2022$804K—Private party → Private party$512/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/09/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/09/2024
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (4)
11/05/2025
Violation issued (ECB, closed)
Construction
11/05/2025
Violation issued (ECB, closed)
Construction
11/05/2025
Violation issued (ECB, open)
Unknown
01/22/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01047455-I1
05/14/2024
Permit issued — Solar
Q01047455-I1-SL
05/09/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01047455-I1
05/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/07/2024
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR05/14/2024
3 projects · most recent 12/16/2025
HVAC Wiring
FiledStatusContractorScope
12/16/2025Permit IssuedA & S MASTER ELEC'L CORPHVAC Wiring
12/15/2025Permit IssuedA & S MASTER ELEC'L CORPHVAC Wiring
05/08/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
05/07/2024Fire-Resistant Penetrations and JointsMina Makarspecial
05/07/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
05/07/2024Energy Code Compliance InspectionsMina Makarprogress
05/07/2024FinalMina Makarprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01047455-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01047455-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q01047455-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01047455-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01047455-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01047455-I1Open ↗