← Back
One family attached or semi-detached
150-26 58 AVENUE
QUEENS · Queensboro Hill · BIN 4141137
💬 Discuss this project
1955Year Built
2Stories
A5Building Class
R4BZoning
1,224 sfGross Floor Area
1Units
One family attached or semi-detached · 1,800 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 25p · 2 filings · 14 docs
Floor 13p · 2 filings · 14 docs
Cellar7p · 2 filings · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC308/11/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor107/08/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373308/11/2022
Building Lifecycle
All (15)Filed (3)Permit Issued (2)Signed Off (2)Inspection (4)Special Inspection (4)
08/23/2022
Signed off — Alteration
REPLACE EXISTING BOILER, HWH AND DRYER IN CELLAR, AND GAS RANGE ON FIRST FLOOR; REPLACE PLUMBING FIXTURES THROUGHOUT THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00739549-I1
08/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
08/12/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/11/2022
Filed — Alteration
REPLACE EXISTING BOILER, HWH AND DRYER IN CELLAR, AND GAS RANGE ON FIRST FLOOR; REPLACE PLUMBING FIXTURES THROUGHOUT THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00739549-P1
08/11/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
08/11/2022
Special inspection requirement — Energy Code Compliance Inspections
KY FU
08/10/2022
Signed off — Alteration
Q00739548-I1
07/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/11/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/27/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/19/2022
Permit issued — General Construction
Q00739548-I1-GC-CX
05/18/2022
Permit issued — Plumbing
Q00739549-I1-PL
05/17/2022
Filed — Alteration
REPLACE EXISTING BOILER, HWH AND DRYER IN CELLAR, AND GAS RANGE ON FIRST FLOOR; REPLACE PLUMBING FIXTURES THROUGHOUT THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q00739549-I1
05/17/2022
Filed — Alteration
Q00739548-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY05/19/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC05/18/2022
1 project · most recent 06/16/2022
General Wiring
FiledStatusContractorScope
06/16/2022CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/27/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/12/2022Fire-Resistant Penetrations and JointsKY FUspecial
08/12/2022Energy Code Compliance InspectionsKY FUprogress
08/11/2022Fire-Resistant Penetrations and JointsKY FUspecial
08/11/2022Energy Code Compliance InspectionsKY FUprogress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026Q00739548-I1Request digital key ↗
08/26/2026Q00739549-I1Request digital key ↗
08/26/2026Q00739549-P1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/14/2015420594173Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026Q00739549-I1Open ↗
08/26/2026Q00739549-P1Open ↗
08/13/2026Q00739548-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026Q00739549-I1Open ↗
08/28/2026Q00739549-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026Q00739549-I1Open ↗
08/28/2026Q00739549-P1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/18/2012420594173Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
07/18/2012420594173Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/26/2026Q00739549-I1Open ↗
08/26/2026Q00739549-P1Open ↗
08/13/2026Q00739548-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/18/2012420594173Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00739548-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSCHEDULE A - OCCUPANCY / USE1
07/18/2012420594173Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/18/2012420594173Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
07/18/2012420594173Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/18/2012420594173Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
07/18/2012420594173Open ↗