2023Year Built
1Stories
G3Building Class
M1-2AZoning
725 sfGross Floor Area
1Units
0 Open Violations
Gas station with retail store · Owner of record: LIBERTY STATION LLC · 8,165 sf lot · 0.09 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Roof10p · 4 filings · 20 docs
Floor 118p · 9 filings · 20 docs
Cellar6p · 1 filing · 20 docs
Site & exterior21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SANDHU BUILDERS 11407/08/2026
LIBERTY OAK REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/19/2025
NASIR J, KHANZADA LLC2204/15/2025
M.S. SAVANI ARCHITECT, PC106/09/2021
GREEN DESIGN309/26/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NASIR J. KHANZADA LLC4403/21/2026
ATLANTIC BUILDING SUPPLY INC.603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNPREET CONSTRUCTION INCGeneral Contractor1407/08/2026
SANDHU BUILDERS 1 INCGeneral Contractor1107/08/2026
AGS CONSULTING LLCGeneral Contractor507/08/2026
SOLARBLOCKS ENERGY LLCGeneral Contractor303/21/2026
PLBG P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/19/2025
NASIR J. KHANZADA LLC15271604/15/2025
Building Lifecycle
All (204)Filed (27)Permit Issued (22)Signed Off (17)Violation (15)Inspection (13)Objection (80)Special Inspection (30)
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/29/2025
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01228227-I1
06/16/2025
Special inspection requirement — Subgrade Inspections
Nasir Khanzada
06/16/2025
Special inspection requirement — Insulation placement and R values
Nasir Khanzada
06/16/2025
Special inspection requirement — Masonry
Nasir Khanzada
06/16/2025
Special inspection requirement — Structural Steel - High Strength Bolting
Nasir Khanzada
06/16/2025
Special inspection requirement — Air barrier - visual inspection
Nasir Khanzada
06/16/2025
Special inspection requirement — Fenestration areas
Nasir Khanzada
06/16/2025
Special inspection requirement — Lighting controls
Nasir Khanzada
06/16/2025
Special inspection requirement — Structural Steel - Welding
Nasir Khanzada
06/16/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
06/16/2025
Special inspection requirement — Structural Steel - Details
Nasir Khanzada
06/16/2025
Special inspection requirement — Interior lighting power
Nasir Khanzada
06/16/2025
Special inspection requirement — Protection of exposed foundation insulation
Nasir Khanzada
06/16/2025
Special inspection requirement — Maintenance information
Nasir Khanzada
06/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nasir Khanzada
06/16/2025
Special inspection requirement — Footing and Foundation
Nasir Khanzada
06/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
06/16/2025
Special inspection requirement — Final
Nasir Khanzada
06/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Nasir Khanzada
06/16/2025
Special inspection requirement — Fenestration air leakage
Nasir Khanzada
06/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nasir Khanzada
06/16/2025
Special inspection requirement — Concrete - Cast-In-Place
Nasir Khanzada
06/16/2025
Special inspection requirement — Exterior lighting power
Nasir Khanzada
06/05/2025
Objection resolved — Addressed
06/03/2025
Objection resolved — Addressed
05/21/2025
Permit issued — Solar
Q01228227-I1-SL
05/19/2025
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOFTOP. NO CHANGES TO EGRESS OR USE OF OCCUPANCY.
Q01228227-I1
05/02/2025
Objection raised — Scope
05/02/2025
Objection raised — Other
04/15/2025
Filed — New Building
SOE application in conjunction with New Building Application #Q00654216-I1
Q00654216-P5
12/30/2024
Signed off — Alteration
Q01156340-I1
12/30/2024
Permit issued — Mechanical Systems
Q01156340-I1-MS
12/20/2024
Filed — Alteration
Q01156340-I1
12/19/2024
Special inspection requirement — Maintenance information
Nasir Khanzada
12/19/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nasir Khanzada
12/19/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nasir Khanzada
12/19/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nasir Khanzada
12/19/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nasir Khanzada
12/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nasir Khanzada
12/16/2024
Special inspection requirement — Final
Nasir Khanzada
12/16/2024
Special inspection requirement — Mechanical Systems
Nasir Khanzada
12/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/15/2024
Signed off — Alteration
APPLICATION FILED FOR INSTALL (4) NEW 6K GALLON UNDERGROUND STORAGE TANK AND CONNECT (5) NEW MULTIPLE PRODUCT DISPENSERS WITH NEW ASSOCIATED PIPING.
Q00668453-I1
11/14/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/04/2024
Signed off — Alteration
SUBSEQUENT STRUCTURAL APPLICATION FILED FOR INSTALL FREE STANDING CANOPY
Q00654278-S1
10/23/2024
Filed — Alteration
APPLICATION FILED FOR INSTALL (4) NEW 6K GALLON UNDERGROUND STORAGE TANK AND CONNECT (5) NEW MULTIPLE PRODUCT DISPENSERS WITH NEW ASSOCIATED PIPING.
Q00668453-P3
10/16/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE FILED IN CONJUCTION WITH DOB NOW APPLICATION# Q00654216-I1
Q00654274-I1
10/15/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE FILED IN CONJUCTION WITH DOB NOW APPLICATION# Q00654216-I1
Q00654274-S1
10/02/2024
Filed — New Building
SOE application in conjunction with New Building Application #Q00654216-I1
Q00654216-P3
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/04/2024
Signed off — New Building
SOE application in conjunction with New Building Application #Q00654216-I1
Q00654216-S2
08/08/2024
Objection resolved — Addressed
08/07/2024
Objection raised — Scope
08/01/2024
Filed — Alteration
APPLICATION FILED FOR PLUMBING WORK TYPE FILED IN CONJUCTION WITH DOB NOW APPLICATION# Q00654216-I1
Q00654274-P4
07/26/2024
Filed — New Building
SOE application in conjunction with New Building Application #Q00654216-I1
Q00654216-P2
07/10/2024
Signed off — Alteration
Q00234493-I1
07/10/2024
Signed off — Alteration
Q00234480-I1
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLARBLOCKS ENERGY LLC05/21/2025
DOB NOWMechanical SystemsSigned-offSANDHU BUILDERS 1 INC12/30/2024
DOB NOWPlumbingSigned-offPLBG P & H INC04/24/2024
DOB NOWMechanical SystemsSigned-offSUNPREET CONSTRUCTION INC02/02/2024
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC01/24/2024
DOB NOWStructuralPermit IssuedSUNPREET CONSTRUCTION INC12/19/2023
DOB NOWFoundationPermit IssuedSUNPREET CONSTRUCTION INC09/19/2023
DOB NOWPlumbingSigned-offPLBG P & H INC06/16/2023
DOB NOWCurb CutSigned-offSANDHU BUILDERS 1 INC03/27/2023
DOB NOWSupport of ExcavationSigned-offSUNPREET CONSTRUCTION INC03/10/2023
DOB NOWFoundationPermit IssuedSUNPREET CONSTRUCTION INC03/01/2023
DOB NOWStructuralPermit IssuedAGS CONSULTING01/25/2023
DOB NOWCurb CutSigned-offSUNPREET CONSTRUCTION INC01/25/2023
DOB NOWCurb CutSigned-offSUNPREET CONSTRUCTION INC01/25/2023
DOB NOWCurb CutSigned-offSUNPREET CONSTRUCTION INC01/25/2023
DOB NOWCurb CutSigned-offSUNPREET CONSTRUCTION INC01/25/2023
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC01/17/2023
DOB NOWGeneral ConstructionSigned-offAGS CONSULTING01/17/2023
DOB NOWFoundationSigned-offAGS CONSULTING01/10/2023
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC09/30/2019
DOB NOWSidewalk ShedSigned-offSANDHU BUILDERS 1 INC09/30/2019
DOB NOWConstruction FenceSigned-offSANDHU BUILDERS 1 INC09/30/2019
BISPLISSUEDA.S.A.P. PLBG & HTG01/24/2013
BISPLISSUEDA.S.A.P. PLBG & HTG01/10/2012
BISBLISSUEDA.S.A.P. PLBG & HTG01/06/2012
3 projects · most recent 02/21/2025
General Wiring
FiledStatusContractorScope
02/21/2025CompleteMDC SECURITY AND ELEC'L—
08/03/2023CompletePURCELL ELEC'L CONTRS LTDGeneral Wiring
07/26/2023CompleteERIC & NG ELEC'L, INC.General Wiring
1 project · most recent 04/15/2025
Steel Concrete Masonry
FiledStatusContractorScope
04/15/2025Permit IssuedSUNPREET CONSTRUCTION INCSteel, Concrete, Masonry
1 project · most recent 04/15/2025
Scaffold
FiledStatusContractorScope
04/15/2025Permit IssuedSUNPREET CONSTRUCTION INCScaffold
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
12/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
11/14/2024Pass-Final General Construction Non-Directive 14PassView ↗
05/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/09/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
05/03/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/26/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/28/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/28/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/06/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
06/16/2025Air barrier - visual inspectionNasir Khanzadaenergy_progress
06/16/2025Fenestration areasNasir Khanzadaenergy_progress
06/16/2025Fenestration and door U-factor and product ratingsNasir Khanzadaenergy_progress
06/16/2025Insulation placement and R valuesNasir Khanzadaenergy_progress
06/16/2025Concrete - Cast-In-PlaceNasir Khanzadaspecial
06/16/2025Protection of exposed foundation insulationNasir Khanzadaenergy_progress
06/16/2025Exterior lighting powerNasir Khanzadaenergy_progress
06/16/2025Lighting controlsNasir Khanzadaenergy_progress
06/16/2025Interior lighting powerNasir Khanzadaenergy_progress
06/16/2025Maintenance informationNasir Khanzadaenergy_progress
06/16/2025Fenestration air leakageNasir Khanzadaenergy_progress
06/16/2025FinalNasir Khanzadaprogress
06/16/2025Energy Code Compliance InspectionsNasir Khanzadaprogress
06/16/2025Footing and FoundationNasir Khanzadaprogress
06/16/2025Fire-Resistance Rated ConstructionNasir Khanzadaprogress
06/16/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
06/16/2025Structural Steel - WeldingNasir Khanzadaspecial
06/16/2025MasonryNasir Khanzadaspecial
06/16/2025Structural Steel - High Strength BoltingNasir Khanzadaspecial
06/16/2025Structural Steel - DetailsNasir Khanzadaspecial
06/16/2025Subgrade InspectionsNasir Khanzadaspecial
06/16/2025Fire-Resistant Penetrations and JointsNasir Khanzadaspecial
12/19/2024HVAC-R and service water heating system controlsNasir Khanzadaenergy_progress
12/19/2024HVAC-R and service water heating equipmentNasir Khanzadaenergy_progress
12/19/2024Structural Stability – Alterations of existing buildingsNasir Khanzadaspecial
Latest 25 of 114.
▾Documents — 245 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch24
08/27/2026Q00523120-I1Request digital key ↗
08/26/2026Q00668453-P1Request digital key ↗
08/26/2026Q00668453-I1Request digital key ↗
Showing 3 of 24 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence2
08/28/2026Q00234493-I1Request digital key ↗
08/28/2026Q00234480-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00234487-I1Request digital key ↗
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION15
04/18/2025421342256Open ↗
10/17/2024420514955Open ↗
08/23/2024421342283Open ↗
Showing 3 of 15 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
10/03/2024440746454Open ↗
10/19/2022440746454Open ↗
▸BISDOT 410 PERMITS FOR ADA RAMP AT CORNER1
12/17/2024440746454Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
12/17/2024440746454Open ↗
▸BISWORK PERMIT APPLICATION1
01/10/2012420514955Open ↗
▸Zoning, Tax Lot & Property Records17
▸BISRESTRICTION: RESTRICTIVE DECLARATION5
11/30/2016421299366Open ↗
11/30/2016421299366Open ↗
09/01/2016421299366Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00654216-P2Open ↗
08/13/2026Q00654216-P5Open ↗
08/13/2026Q00654216-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026Q00654216-P3Open ↗
08/13/2026Q00654216-P5Open ↗
08/13/2026Q00654216-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
07/20/2016421299366Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/16/2016421342283Open ↗
▸BISZONING DIAGRAM1
11/30/2016421299366Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q00523120-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00654216-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/28/2026Q00234493-I1Open ↗
08/28/2026Q00234480-I1Open ↗
08/27/2026Q00523120-I1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/29/2026Q00654216-S2Open ↗
09/02/2026Q00654274-S1Open ↗
08/31/2026Q00654278-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00654278-I1Open ↗
08/31/2026Q00654278-I1Open ↗
08/28/2026Q01156340-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
11/30/2016421299366Open ↗
11/30/2016421299366Open ↗
11/30/2016421299366Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/19/2022440746454Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/19/2022440746454Open ↗
▸Trade Schedules & Equipment14
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
09/11/2012420514955Open ↗
09/11/2012420514955Open ↗
01/21/2012420514955Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00654216-P2Open ↗
08/13/2026Q00654216-P5Open ↗
08/13/2026Q00654216-P3Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/31/2016421299366Open ↗
08/31/2016421299366Open ↗
06/29/2016421299366Open ↗
▸BISJAMAICA: DEP SEWER CONNECTION APPROVAL1
10/18/2024440746454Open ↗
▸BISSCHEDULE B - PLUMBING1
12/23/2011420514955Open ↗
▸Safety & Tenant Protection17
▸BISSTREET TREE CHECKLIST6
12/19/2022440746454Open ↗
11/03/2022440746454Open ↗
11/30/2016421299366Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Checklist4
08/20/2026Q00654216-P3Open ↗
08/15/2026Q00654216-P5Open ↗
08/14/2026Q00654216-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/30/2016421299366Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/28/2023440746454Open ↗
▸BISSTREET TREES SITE PLAN1
10/18/2024440746454Open ↗
▸BISSTREET TREE SITE PLAN WITH DPR STAMP1
12/17/2024440746454Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00654216-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00654216-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00654216-I1Open ↗
▸Environmental & Asbestos1
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
12/23/2011420514955Open ↗
▸Energy Compliance6
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026Q00654216-I1Open ↗
08/13/2026Q00757852-I1Open ↗
08/13/2026Q00654278-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/16/2016421358667Open ↗
08/09/2016421342283Open ↗
▸BISTECHNICAL REPORT: ENERGY1
12/23/2011420514955Open ↗
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT5
08/13/2026Q00654278-I1Open ↗
08/13/2026Q00654216-P2Open ↗
08/13/2026Q00654216-P5Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
11/30/2016421299366Open ↗
07/20/2016421299366Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q00654216-I1Open ↗
08/13/2026Q00654278-I1Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/20/2016421299366Open ↗
▸BISBPP: FIELD INSPECTION1
12/17/2024440746454Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00654278-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION11
10/17/2024420514955Open ↗
06/05/2024440746454Open ↗
12/19/2022440746454Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
06/29/2016421299366Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/20/2011420514955Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/17/2024440746454Open ↗
▸BISCURB CUT (CC) SIGNOFF1
12/17/2024440746454Open ↗
▸BISDOT APPROVAL FOR APEX CORNER PED-RAMP I1
12/17/2024440746454Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01228227-I1Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
08/16/2016421358667Open ↗
08/09/2016421342283Open ↗
12/23/2011420514955Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
12/17/2024440746454Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET4
08/16/2016421358667Open ↗
08/09/2016421342283Open ↗
08/01/2016421342256Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
06/05/2024440746454Open ↗
12/19/2022440746454Open ↗
11/30/2016421299366Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/19/2022440746454Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/19/2022440746454Open ↗
▸BISBOROUGH INTAKE FORM1
04/18/2025421342256Open ↗
▸Other Documents30
▸BISBPP - SUPPORTING DOCUMENTATION4
12/17/2024440746454Open ↗
12/17/2024440746454Open ↗
12/17/2024440746454Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00654216-P3Open ↗
08/13/2026Q00654216-P2Open ↗
08/13/2026Q00654216-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00654216-I1Open ↗
08/13/2026Q00654216-P3Open ↗
08/13/2026Q00654216-P5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification4
08/13/2026Q00668453-I1Open ↗
08/13/2026Q00654216-S2Open ↗
08/13/2026Q00654216-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/20/2026Q00654216-P3Open ↗
08/15/2026Q00654216-P5Open ↗
08/14/2026Q00654216-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-PARKS: PLANT NEW TREE1
12/17/2024440746454Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
12/17/2024440746454Open ↗
▸BISRP 6021
12/19/2022440746454Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/19/2022440746454Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
10/19/2022440746454Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
12/17/2024440746454Open ↗
▸BISPLOT DIAGRAM1
07/20/2016421299366Open ↗
▸DOB NOWRevise DEPT. OF BLDGS. JOB NUMBER on Plan to reflect "S1" for subsequent filing1
08/13/2026Q00654278-S1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00654216-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00654216-I1Open ↗