ECB06/20/2024FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT THE TIME OF INSPECTION, I OBSERVED HEAVY AMOUNT OF DEBRIS/GARBAGE AT REAR YARD. NO HANDRAILS AT FRONT ENTRANCE., REPAIR AND/OR REPLACE$2K due
HPD08/10/2003SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
HPD08/10/2003SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
HPD11/13/2002SECTION 27-2064 ADM CODE - PROVIDE IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT A WATERPROOF FLOOR AND BASE FOR THE WATER CLOSET .. IN THE BATHROOM LOCATED AT APT 1, 1st STORY
HPD09/17/2002SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY
ECB06/03/2026FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER NOTED : AT TIME OF INSPECTION OBSERVED DEBRIS/MATERIALS IN REAR YARD NOT MAINTAINED IN PROPER CONTAINERS CREATING A COMBUSTION FIRE HAZARD., REPAIR AND/ORHearing held — result not yet published$1K proposed
ECB06/03/2026FENCE EXCEEDING THE PERMITTED HEIGHT NOTED: AT TIME OF INSPECTION OBSERVED BLACK IRON FENCE INSTALLED AT BUILDING FRONT APPROX. 6FT HIGH, EXCEEDING THE PERMITTED HEIGHT OF 4FT., CONFORM FENCE TO HEIGHT REQUIREMHearing held — result not yet published$200 proposed