← Back
One family attached or semi-detached
150-32 77 ROAD
QUEENS · BIN 4145077
💬 Discuss this project
1945Year Built
2Stories
A5Building Class
R4Zoning
1,700 sfGross Floor Area
1Units
One family attached or semi-detached · Owner of record: 15032 HOLDINGS LLC · 2,700 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalFire Protection
Floor 316p · 1 filing · 20 docs
Floor 216p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Basement18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HOLDINGS2907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2024$910K—Private party → 15032 HOLDINGS LLC$535/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMINOV DESIGN ENGINEER, PC602/28/2026
FNU LUQMAN406/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FORTRESS FORCE CONST. CORGeneral Contractor607/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection106/28/2026
DYNAMIC PLBG & SPRKLR CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HERTZ ENGINEERING, PLLC9414902/28/2026
Building Lifecycle
All (115)Filed (10)Permit Issued (8)Signed Off (6)Inspection (7)Objection (54)Special Inspection (30)
08/03/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S5
07/31/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S7
05/22/2026
Permit issued — Sprinklers
Q01118422-S7-EW-SP
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Objection resolved — Resolved
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JASON S. HERTZ
04/20/2026
Special inspection requirement — Post-installed Anchors
JASON S. HERTZ
04/10/2026
Objection raised — Inspections
04/10/2026
Objection raised — Cost
04/10/2026
Objection raised — Fire_Protection
03/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S7
02/26/2026
Special inspection requirement — Sprinkler Systems
JASON S. HERTZ
02/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-P3
02/03/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JASON S. HERTZ
02/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
JASON S. HERTZ
02/03/2026
Special inspection requirement — Maintenance information
JASON S. HERTZ
02/03/2026
Special inspection requirement — Final
JASON S. HERTZ
02/03/2026
Special inspection requirement — Air barrier - visual inspection
JASON S. HERTZ
02/03/2026
Special inspection requirement — Fenestration areas
JASON S. HERTZ
02/03/2026
Special inspection requirement — Insulation placement and R values
JASON S. HERTZ
02/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
JASON S. HERTZ
02/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JASON S. HERTZ
02/03/2026
Special inspection requirement — Air barrier — testing
JASON S. HERTZ
02/03/2026
Special inspection requirement — Permanent certificate
JASON S. HERTZ
02/03/2026
Special inspection requirement — Ventilation and air distribution system
JASON S. HERTZ
02/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
JASON S. HERTZ
02/03/2026
Special inspection requirement — Protection of exposed foundation insulation
JASON S. HERTZ
02/03/2026
Special inspection requirement — Interior lighting power
JASON S. HERTZ
02/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JASON S. HERTZ
02/03/2026
Special inspection requirement — Metering
JASON S. HERTZ
02/03/2026
Special inspection requirement — Fenestration air leakage
JASON S. HERTZ
02/03/2026
Special inspection requirement — Electric vehicle service equipment requirements
JASON S. HERTZ
02/03/2026
Special inspection requirement — Shutoff dampers
JASON S. HERTZ
02/03/2026
Special inspection requirement — Energy Code Compliance Inspections
JASON S. HERTZ
02/03/2026
Special inspection requirement — Mechanical Systems
JASON S. HERTZ
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JASON S. HERTZ
02/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S4
02/02/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S2
01/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/14/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S3
12/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-P2
12/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JASON S. HERTZ
12/05/2025
Special inspection requirement — Mechanical Systems
JASON S. HERTZ
12/05/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
JASON S. HERTZ
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JASON S. HERTZ
12/01/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-S1
08/19/2025
Permit issued — Construction Fence
Q01118422-S1-FN
08/08/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/08/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
08/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/17/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
SPRINKLER WORK IN CONJUNCTION WITH ALT-CO APPLICATION NUMBER Q01118422-I1
Q01118422-P1
06/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/21/2025
Permit issued — Structural
Q01118422-S4-ST
03/17/2025
Permit issued — Foundation
Q01118422-S2-FO-EA
03/17/2025
Permit issued — Support of Excavation
Q01118422-S3-SE
03/07/2025
Objection raised — Other
03/07/2025
Objection resolved — Addressed
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offDYNAMIC PLBNG & SPRKR COR05/22/2026
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR08/19/2025
DOB NOWStructuralSigned-offFORTRESS FORCE CONST. COR03/21/2025
DOB NOWFoundationSigned-offFORTRESS FORCE CONST. COR03/17/2025
DOB NOWSupport of ExcavationSigned-offFORTRESS FORCE CONST. COR03/17/2025
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS03/04/2025
DOB NOWGeneral ConstructionPermit IssuedFORTRESS FORCE CONST. COR02/19/2025
DOB NOWConstruction FenceSigned-offFORTRESS FORCE CONST. COR11/01/2024
1 project · most recent 02/28/2026
Sprinkler System
FiledStatusContractorScope
02/28/2026Signed-offDYNAMIC PLBNG & SPRKR CORSprinkler System
1 project · most recent 02/28/2026
FiledStatusContractorScope
02/28/2026Signed-offDYNAMIC PLBG & SPRKLR COR—
1 project · most recent 03/14/2025
General Wiring
FiledStatusContractorScope
03/14/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
08/08/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/08/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
04/20/2026Fire-Resistant Penetrations and JointsJASON S. HERTZspecial
04/20/2026Post-installed AnchorsJASON S. HERTZspecial
02/26/2026Sprinkler SystemsJASON S. HERTZspecial
02/03/2026Energy Code Compliance InspectionsJASON S. HERTZprogress
02/03/2026FinalJASON S. HERTZprogress
02/03/2026Fire-Resistance Rated ConstructionJASON S. HERTZprogress
02/03/2026Maintenance informationJASON S. HERTZenergy_progress
02/03/2026Shutoff dampersJASON S. HERTZenergy_progress
02/03/2026Air barrier - visual inspectionJASON S. HERTZenergy_progress
02/03/2026Fenestration areasJASON S. HERTZenergy_progress
02/03/2026Insulation placement and R valuesJASON S. HERTZenergy_progress
02/03/2026HVAC-R and service water heating system controlsJASON S. HERTZenergy_progress
02/03/2026HVAC-R and service water piping design and insulationJASON S. HERTZenergy_progress
02/03/2026Air barrier — testing JASON S. HERTZenergy_progress
02/03/2026Permanent certificateJASON S. HERTZenergy_progress
02/03/2026HVAC-R and service water heating equipmentJASON S. HERTZenergy_progress
02/03/2026Ventilation and air distribution systemJASON S. HERTZenergy_progress
02/03/2026Protection of exposed foundation insulationJASON S. HERTZenergy_progress
02/03/2026Interior lighting powerJASON S. HERTZenergy_progress
02/03/2026Fenestration and door U-factor and product ratingsJASON S. HERTZenergy_progress
02/03/2026MeteringJASON S. HERTZenergy_progress
02/03/2026Fenestration air leakageJASON S. HERTZenergy_progress
02/03/2026Electric vehicle service equipment requirementsJASON S. HERTZenergy_progress
02/03/2026Fire-Resistant Penetrations and JointsJASON S. HERTZspecial
02/03/2026Structural Stability – Alterations of existing buildingsJASON S. HERTZspecial
Latest 25 of 73.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/19/2026Q01118422-P2Request digital key ↗
08/19/2026Q01118422-P1Request digital key ↗
08/19/2026Q01118422-S5Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/19/2026Q01118422-P2Open ↗
08/19/2026Q01118422-I1Open ↗
08/13/2026Q01118422-P3Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/19/2026Q01118422-P2Open ↗
08/19/2026Q01118422-I1Open ↗
08/13/2026Q01118422-P3Open ↗
▸Seals & Professional Certifications28
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026Q01118422-S7Open ↗
08/30/2026Q01118422-S3Open ↗
08/30/2026Q01118422-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026Q01118422-P2Open ↗
08/19/2026Q01118422-S4Open ↗
08/19/2026Q01118422-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/27/2026Q01118422-P2Open ↗
08/27/2026Q01118422-P2Open ↗
08/26/2026Q01118422-S5Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01118422-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/19/2026Q01118422-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/19/2026Q01118422-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/19/2026Q01118422-S4Open ↗
08/19/2026Q01118422-I1Open ↗
08/19/2026Q01118422-P2Open ↗
Showing 3 of 9 on file for this type
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01118422-S2Open ↗
08/13/2026Q01118422-S3Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q01118422-S2Open ↗
08/13/2026Q01118422-S3Open ↗
▸Other Documents12
▸DOB NOWProperty Ownership Certification3
08/19/2026Q01118422-P2Open ↗
08/19/2026Q01118422-I1Open ↗
08/13/2026Q01118422-P3Open ↗
▸DOB NOWSite Survey: Initial3
08/19/2026Q01118422-P2Open ↗
08/19/2026Q01118422-I1Open ↗
08/13/2026Q01118422-P3Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/19/2026Q01118422-I1Open ↗
08/19/2026Q01118422-P2Open ↗
08/13/2026Q01118422-P3Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01118422-S3Open ↗
08/13/2026Q01118422-S2Open ↗
▸DOB NOWFinal Survey1
08/19/2026Q01118422-I1Open ↗