← Back
BuildNYC
Condo, residential unit in elevator building
Village Mall at Hillcrest Condominium
150-38 UNION TURNPIKE · BIN 4446721
💬 Discuss this project
1973Year Built
14Stories
R4Building Class
R6Zoning
361,600 sfGross Floor Area
458Units
LL97 CoveredRent Stabilized18 Active Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · 185,346 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofGarage Lower Level Ceiling Repairs1p · 1 filing · 4 docs
Floor 12Unit 12K3p · 1 filing · 12 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Garage Lower Level Ceiling Repairs2p · 2 filings · 8 docs
CellarGarage Lower Level Ceiling Repairs1 filing · 4 docs
Sub-BasementGarage Lower Level Ceiling Repairs1 filing · 4 docs
Site & exteriorVillage Mall at Hillcrest wall repairs32p · 2 filings · 9 docs
Filed — no permit issued13p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Village Mall at Hillcrest Condomini3607/08/2026
150-28 Union Tpke Associates403/21/2026
Independance Community Bank203/21/2026
150-18 28 Union Turnpike203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RH3 Group112/30/2025
Banji Awosika Architect311/04/2025
Stavros I. Malliaros, P.E.307/23/2024
Node Architecture, Engineering212/12/2023
Rojas AP112/11/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Banji Architect603/21/2026
Bay Restoration803/21/2026
Node Architecture, Engineering203/21/2026
Node Engineering Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Powers Bridging ScaffolGeneral Contractor403/21/2026
Xinos ConstructionGeneral Contractor307/08/2026
GA IndustriesGeneral Contractor203/21/2026
Vis Plumbing & Heating MechanicalGeneral Contractor203/21/2026
Vis Industriesspecialty_contractor203/21/2026
JV Fast ConstructionGeneral Contractor104/09/2026
Lane AssociatesGeneral Contractor103/21/2026
Wagner WeintraubPlumbing103/21/2026
Bay RestorationScaffold107/08/2026
Kishan PlumbingPlumbing107/08/2026
Cresco ElectricalElectrical103/22/2026
Signore & Sons PlumbingPlumbing107/08/2026
Vertex ElectricElectrical103/22/2026
Bay Restorationspecialty_contractor107/08/2026
Aegis Energy ServicesGeneral Contractor107/18/2016
Ameritalia Plumbing & HeatingPlumbing111/09/2018
Chief Fire ContractorFire Protection109/03/2008
Chief Fire ContractingFire Protection109/02/2009
Dual Fuel Plumbing & HeatingPlumbing107/27/2016
Inter County MechanicalGeneral Contractor112/23/2003
M Build BuildersGeneral Contractor208/18/2021
Puma ConstructionGeneral Contractor112/14/2005
Skyway PLG and HeatingPlumbing107/31/1990
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Banji Awosika Architect P2721311/04/2025
Node Architecture, Engineering6799112/12/2023
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
05/07/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/08/2026
Apartment 4L sold
03/27/2026
Closed: Failure to correct swarmp conditions
DOB violation · closed on the city's record
03/23/2026
Apartment 3A sold
236 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offN and S Plumbing07/15/2025
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration06/28/2024
DOB NOWSuspended ScaffoldPermit IssuedBay Restoration04/12/2024
DOB NOWGeneral ConstructionSigned-offBay Restoration02/05/2024
DOB NOWSidewalk ShedSigned-offBay Restoration12/28/2023
DOB NOWStructuralSigned-offXinos Construction07/29/2022
DOB NOWPlumbingSigned-offSignore & Sons Plumbing03/25/2022
DOB NOWStructuralSigned-offXinos Construction01/20/2022
BISOTISSUEDM Build Builders08/18/2021
BISOTISSUEDM Build Builders07/19/2021
BISEQISSUEDPowers Bridging & Scaffolding04/12/2019
BISPLISSUEDAmeritalia Plumbing & Heating11/09/2018
BISEQISSUEDPowers Bridging & Scaffolding04/06/2018
BISOTISSUEDGA Industries03/26/2018
BISEQISSUEDPowers Bridging & Scaffolding04/10/2017
BISOTISSUEDGA Industries04/04/2017
BISOTISSUEDGA Industries11/02/2016
BISPLISSUEDDual Fuel Plumbing & Heating07/27/2016
BISMHISSUEDAegis Energy Services07/18/2016
BISOTISSUEDGA Industries11/12/2015
BISOTISSUEDGA Industries10/31/2014
BISEQISSUEDPowers Bridging & Scaffolding09/15/2014
BISOTISSUEDGA Industries10/17/2013
BISOTISSUEDGA Industries10/18/2012
BISEQISSUEDPowers Bridging & Scaffolding03/28/2012
BISOTISSUEDGA Industries11/16/2011
BISEQISSUEDPowers Bridging & Scaffolding10/28/2011
BISMHISSUEDVis Plumbing, Heating & Mechanical02/22/2011
BISMHISSUEDVis Plumbing, Heating & Mechanical04/23/2010
BISPLISSUEDVis Industries04/23/2010
BISSPISSUEDVis Industries04/23/2010
BISSPISSUEDChief Fire Contracting09/02/2009
BISSPISSUEDChief Fire Contracting09/03/2008
BIS—ISSUEDGoing Sign & Servicing06/26/2006
BISMHISSUEDPuma Construction12/14/2005
BISMHISSUEDInter-County Mechanical12/23/2003
BISMHISSUEDLane Refrigeration01/21/1998
BISPLISSUEDWagner Weintraub04/02/1997
BISOTISSUEDVordonia Construction06/07/1996
BISOTISSUEDHandi-Lift03/29/1996
+ 5 more permits on file
8 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedSafetech Electrical Contng—
07/08/2026CompleteJam ElectricalGeneral Wiring
06/12/2025CompleteCresco ElectricalGeneral Wiring
02/14/2024Permit IssuedVertex ElectricGeneral Wiring
07/24/2023Permit IssuedJoseph Weinstein ElectricGeneral Wiring
01/13/2023Permit IssuedPW & Sons Electrical—
09/20/2020CompleteJoe ElectricalGeneral Wiring
09/11/2020Permit IssuedWCK ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/30/2025Tenant Protection Plan Compliance—special
12/09/2025Final—progress
10/31/2025Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
10/31/2025FinalOLABANJI AWOSIKAprogress
06/18/2025Fire-Resistant Penetrations and JointsOLABANJI AWOSIKAspecial
10/27/2021FinalRadomir Delicprogress
250 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account