← Back
BuildNYC
Garden apartments
150-41 75TH ROAD
QUEENS · BIN 4448166
💬 Discuss this project
1950Year Built
3Stories
C9Building Class
R4Zoning
116,784 sfGross Floor Area
144Units
LL97 CoveredRent Stabilized442 Active Violations 2 likely answered ▸FDNY Report ↗
Garden apartments · Owner of record: Kew Gardens Hills · 120,000 sf lot · 0.97 FAR built · Flood zone X
Locations of Work
Plumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 3Replace gas meter and piping throughout building1p · 1 filing · 3 docs
Floor 2Replace gas meter and piping throughout building1 filing · 3 docs
Floor 1Replace gas meter and piping throughout building1 filing · 3 docs
CellarReplace gas meter and piping throughout building1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kew Gardens Hills907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction108/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lewsan Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Henry Myers P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gregory V. Perotto, P.E947108/04/2021
Building Lifecycle
All (65)Filed (1)Permit Issued (1)Signed Off (1)Violation (60)Inspection (2)
06/04/2026
Violation issued (HPD, closed)
A
06/04/2026
Violation issued (HPD, closed)
B
06/04/2026
Violation issued (HPD, closed)
B
05/09/2025
Violation issued (HPD, closed)
B
04/02/2025
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
C
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
B
09/18/2024
Violation issued (HPD, closed)
A
05/21/2024
Violation issued (HPD, closed)
C
12/26/2023
Violation issued (HPD, closed)
C
12/26/2023
Violation issued (HPD, closed)
C
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2023
Violation issued (HPD, closed)
A
02/28/2023
Violation issued (HPD, closed)
B
02/28/2023
Violation issued (HPD, closed)
B
02/28/2023
Violation issued (HPD, closed)
C
02/28/2023
Violation issued (HPD, closed)
B
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
A
02/19/2023
Violation issued (HPD, closed)
B
02/19/2023
Violation issued (HPD, closed)
A
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
B
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
C
02/19/2023
Violation issued (HPD, closed)
A
01/18/2023
Signed off — Alteration
Replace gas meter and gas piping to residential cooking appliances throughout building. Associated Job Filing: Q00550315 (150-47 75th Road) to replace gas meter and gas piping as the gas meters are located in 150-41 75th Road.
Q00550310-I1
01/06/2023
Violation issued (HPD, closed)
A
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
C
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
06/08/2022
Violation issued (HPD, closed)
B
06/08/2022
Violation issued (HPD, closed)
A
06/08/2022
Violation issued (HPD, closed)
A
06/08/2022
Violation issued (HPD, closed)
B
09/08/2021
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/20/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHenry Myers P & H08/17/2021
BISOTRE-ISSUEDOne Main Construction03/22/2001
BISPLISSUEDMedco Plumbing03/22/2001
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/08/2021Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/20/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026Q00550310-I1Request digital key ↗
▸Seals & Professional Certifications1
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/27/2026Q00550310-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/27/2026Q00550310-I1Open ↗