← Back
Three families
150-43 78 AVENUE
QUEENS · BIN 4145041
💬 Discuss this project
1945Year Built
2Stories
C0Building Class
R4Zoning
3,150 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: DM HOLDINGS OF NYC LLC · 2,700 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Floor 27p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Basement6p · 1 filing · 20 docs
Sub-Basement6p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DM HOLDINGS3207/08/2026
DM HOLDINGS OF NYC LLC2803/22/2026
E GROUP INC403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2021$927K—— → —$294/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CITISCAPE CONSULTING LTD1110/24/2023
RAS PE CONSULTING ENGINEERS801/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A D BUILDING SOLUTIONS1603/21/2026
AMINOV DESIGN ENGINEER603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E-GROUP INCGeneral Contractor1707/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
S&S CONCRETE & SOIL TESTI10081810/24/2023
Building Lifecycle
All (152)Filed (19)Permit Issued (13)Signed Off (6)Violation (5)Inspection (9)Objection (70)Special Inspection (30)
11/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
GLEN LANGER
11/08/2023
Special inspection requirement — Permanent certificate
GLEN LANGER
11/08/2023
Special inspection requirement — Metering
GLEN LANGER
11/08/2023
Special inspection requirement — Fenestration areas
GLEN LANGER
11/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
GLEN LANGER
11/08/2023
Special inspection requirement — Air barrier — testing
GLEN LANGER
11/08/2023
Special inspection requirement — Insulation placement and R values
GLEN LANGER
11/08/2023
Special inspection requirement — Protection of exposed foundation insulation
GLEN LANGER
11/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
GLEN LANGER
11/08/2023
Special inspection requirement — Maintenance information
GLEN LANGER
11/08/2023
Special inspection requirement — Fenestration air leakage
GLEN LANGER
11/08/2023
Special inspection requirement — Electric vehicle service equipment requirements
GLEN LANGER
11/08/2023
Special inspection requirement — Shutoff dampers
GLEN LANGER
11/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
GLEN LANGER
11/08/2023
Special inspection requirement — Interior lighting power
GLEN LANGER
11/08/2023
Special inspection requirement — Masonry
GLEN LANGER
11/08/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
11/08/2023
Special inspection requirement — Mechanical Systems
GLEN LANGER
11/08/2023
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
11/08/2023
Special inspection requirement — Final
GLEN LANGER
11/08/2023
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
11/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
GLEN LANGER
11/08/2023
Special inspection requirement — Ventilation and air distribution system
GLEN LANGER
11/08/2023
Special inspection requirement — Air barrier - visual inspection
GLEN LANGER
10/24/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P9
10/24/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
GLEN LANGER
10/24/2023
Special inspection requirement — Energy Code Compliance Inspections
GLEN LANGER
10/24/2023
Special inspection requirement — Masonry
GLEN LANGER
10/24/2023
Special inspection requirement — Concrete - Cast-In-Place
GLEN LANGER
10/24/2023
Special inspection requirement — Mechanical Systems
GLEN LANGER
10/24/2023
Special inspection requirement — Final
GLEN LANGER
08/10/2023
Signed off — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-S4
08/01/2023
Signed off — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-S3
07/21/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P8
06/23/2023
Signed off — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-S7
06/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/24/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P7
05/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/17/2023
Objection resolved — Addressed
04/14/2023
Objection raised — Other
04/10/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P5
04/10/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P6
03/29/2023
Signed off — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-S1
03/14/2023
Permit issued — Mechanical Systems
Q00654460-I1-GC-CX
03/13/2023
Permit issued — Structural
Q00654460-S7-ST
03/10/2023
Signed off — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-S5
03/08/2023
Objection resolved — Addressed
03/05/2023
Objection raised — Scope
03/02/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P4
02/23/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/07/2023
Signed off — Alteration
HEREWITH FILING PAA FOR FOUNDATION DESIGN AND EARTHWORK FOR HORIZONTAL EXTENSION TO EXISTING 2 STORY, 1 FAMILY ALT-1 BUILDING.
Q00747116-I1
01/30/2023
Objection resolved — Addressed
01/25/2023
Objection raised — Structural
01/24/2023
Filed — Alteration
HEREWITH FILING PAA FOR FOUNDATION DESIGN AND EARTHWORK FOR HORIZONTAL EXTENSION TO EXISTING 2 STORY, 1 FAMILY ALT-1 BUILDING.
Q00747116-P3
01/24/2023
Filed — Alteration CO
Application is filed to install a sprinkler system.
Q00654460-P3
01/23/2023
Permit issued — Foundation
Q00747116-I1-FO-EA
01/12/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedE-GROUP INC03/14/2023
DOB NOWStructuralSigned-offE-GROUP INC03/13/2023
DOB NOWFoundationPermit IssuedE-GROUP INC01/23/2023
DOB NOWSupport of ExcavationSigned-offE-GROUP INC01/06/2023
DOB NOWStructuralSigned-offE-GROUP INC11/28/2022
DOB NOWMechanical SystemsPermit IssuedE-GROUP INC11/14/2022
DOB NOWSprinklersSigned-offCITYWIDE PLBG HTG & SPKLS08/01/2022
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS08/01/2022
DOB NOWFoundationPermit IssuedE-GROUP INC07/19/2022
DOB NOWStructuralSigned-offE-GROUP INC07/05/2022
DOB NOWSupport of ExcavationSigned-offE-GROUP INC07/05/2022
DOB NOWMechanical SystemsPermit IssuedE-GROUP INC05/18/2022
DOB NOWConstruction FenceSigned-offE-GROUP INC04/29/2022
1 project · most recent 10/24/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/24/2023Permit IssuedE-GROUP INCAir Conditioning Systems
Cooling
Fujitsu AOU48RLXFZ 48,000 BTU · Heat Pump Outdoor ×9
1 project · most recent 10/24/2023
Sprinkler System
FiledStatusContractorScope
10/24/2023——Sprinkler System
1 project · most recent 10/24/2023
Gas Water/Sanitary
FiledStatusContractorScope
10/24/2023Signed-offDYNAMIC PLBG & SPRKLR CORGas, Water/Sanitary
1 project · most recent 02/24/2022
General Wiring
FiledStatusContractorScope
02/24/2022CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 10/24/2023
Masonry Wood
FiledStatusContractorScope
10/24/2023Permit IssuedE-GROUP INCMasonry, Wood
1 project · most recent 10/24/2023
Fence
FiledStatusContractorScope
10/24/2023Permit IssuedE-GROUP INCFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/02/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/23/2023Pass-Final General Construction Non-Directive 14PassView ↗
01/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/08/2023Air barrier - visual inspectionGLEN LANGERenergy_progress
11/08/2023Permanent certificateGLEN LANGERenergy_progress
11/08/2023Air barrier — testing GLEN LANGERenergy_progress
11/08/2023HVAC-R and service water piping design and insulationGLEN LANGERenergy_progress
11/08/2023Fenestration areasGLEN LANGERenergy_progress
11/08/2023MeteringGLEN LANGERenergy_progress
11/08/2023Interior lighting powerGLEN LANGERenergy_progress
11/08/2023Protection of exposed foundation insulationGLEN LANGERenergy_progress
11/08/2023Energy Code Compliance InspectionsGLEN LANGERprogress
11/08/2023Fire-Resistance Rated ConstructionGLEN LANGERprogress
11/08/2023Mechanical SystemsGLEN LANGERspecial
11/08/2023Ventilation and air distribution systemGLEN LANGERenergy_progress
11/08/2023Concrete - Cast-In-PlaceGLEN LANGERspecial
11/08/2023FinalGLEN LANGERprogress
11/08/2023Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
11/08/2023MasonryGLEN LANGERspecial
11/08/2023HVAC-R and service water heating system controlsGLEN LANGERenergy_progress
11/08/2023Shutoff dampersGLEN LANGERenergy_progress
11/08/2023HVAC-R and service water heating equipmentGLEN LANGERenergy_progress
11/08/2023Fenestration air leakageGLEN LANGERenergy_progress
11/08/2023Insulation placement and R valuesGLEN LANGERenergy_progress
11/08/2023Fenestration and door U-factor and product ratingsGLEN LANGERenergy_progress
11/08/2023Maintenance informationGLEN LANGERenergy_progress
11/08/2023Electric vehicle service equipment requirementsGLEN LANGERenergy_progress
10/24/2023Structural Stability – Alterations of existing buildingsGLEN LANGERspecial
Latest 25 of 150.
▾Documents — 166 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/25/2026Q00654460-P8Request digital key ↗
08/25/2026Q00654460-P2Request digital key ↗
08/25/2026Q00654460-P9Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00654460-I1Open ↗
08/13/2026Q00654460-P1Open ↗
08/13/2026Q00654460-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00654460-I1Open ↗
▸Seals & Professional Certifications70
▸DOB NOWSpecial Inspector Seal & Signature32
09/23/2026Q00654460-S3Open ↗
09/01/2026Q00654460-P9Open ↗
09/01/2026Q00747116-I1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026Q00654460-P9Open ↗
09/01/2026Q00654460-P9Open ↗
09/01/2026Q00747116-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/25/2026Q00747116-I1Open ↗
08/25/2026Q00747116-P1Open ↗
08/25/2026Q00747116-P2Open ↗
Showing 3 of 19 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/13/2026Q00654460-P9Open ↗
08/13/2026Q00654460-I1Open ↗
08/13/2026Q00654460-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00654460-I1Open ↗
08/13/2026Q00654460-P1Open ↗
08/13/2026Q00654460-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00654460-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00654460-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00654460-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
08/25/2026Q00747116-P3Open ↗
08/25/2026Q00747116-I1Open ↗
08/25/2026Q00747116-P1Open ↗
Showing 3 of 18 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00654460-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT5
08/25/2026Q00747116-I1Open ↗
08/13/2026Q00747116-P3Open ↗
08/13/2026Q00747116-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Plot Diagram2
08/25/2026Q00747116-I1Open ↗
08/13/2026Q00654460-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/25/2026Q00747116-I1Open ↗
08/13/2026Q00654460-S5Open ↗
▸Other Documents30
▸DOB NOWPlot Diagram10
08/25/2026Q00747116-I1Open ↗
08/13/2026Q00654460-P8Open ↗
08/13/2026Q00654460-P9Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification6
08/13/2026Q00654460-P8Open ↗
08/13/2026Q00654460-P1Open ↗
08/13/2026Q00654460-P5Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00654460-P9Open ↗
08/13/2026Q00654460-P5Open ↗
08/13/2026Q00654460-P8Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026Q00654460-P8Open ↗
08/13/2026Q00654460-P9Open ↗
08/13/2026Q00654460-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/25/2026Q00747116-I1Open ↗
08/13/2026Q00654460-S5Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00654460-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00654460-I1Open ↗