← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Instrata Park Slope
150 4TH AVENUE · BIN 3397905
💬 Discuss this project
2011Year Built
12Stories
RMBuilding Class
C4-4DZoning
78,779 sfGross Floor Area
99Units
LL97 CoveredRent Stabilized22 Active Violations 20 unresolved · 2 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 12,777 sf lot · 6.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsCanvas Property GroupUnder Construction1 filing
RoofInvesco Real Estate1p · 1 filing · 14 docs
Floor 1Code Ninja School1p · 3 filings · 11 docs
CellarInvesco Real Estate1p · 1 filing · 14 docs
Site & exteriorCode Ninjas1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
The Iconic Group3003/21/2026
150 4th Ave2203/21/2026
Canvas Property Group2110/04/2026
Partners on Fourth1803/21/2026
150 Fourth Avenue703/21/2026
Jordan Cooper & Associates503/21/2026
150 Avenue403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs109/15/2026
Howard L Zimmerman Arch & Engineering101/02/2025
Leon Skvirsky PE102/15/2024
Imc Architecture201/16/2024
Collectif Engineering212/21/2023
Layla O. Safiani112/21/2023
Christian Kotzamanis105/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Howard L Zimmerman Architects203/21/2026
Lso Creates203/21/2026
Big Orange Expediting203/21/2026
Core Consultants NYC203/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC ConstructionGeneral Contractor407/08/2026
Dominick CasaleElectrical403/21/2026
KJK ElectricElectrical103/22/2026
Pac ElectricElectrical103/21/2026
Countrywide Home ImprovemGeneral Contractor107/08/2026
Excel Restorationspecialty_contractor109/17/2026
High Quality ConstructionGeneral Contractor107/08/2026
Kings Group NYScaffold109/16/2026
Five Town Neon Sign CoSign hanger107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI Consulting Services8904109/03/2026
C.M. Testing Laboratory1352401/02/2025
Msla USA9738101/02/2025
Collectif Engineering, PL7799312/21/2023
Building Lifecycle
All (161)Filed (10)Permit Issued (9)Signed Off (5)Facade (FISP) (9)Violation (60)Inspection (5)Objection (34)Special Inspection (29)
09/28/2026
Permit issued — Suspended Scaffold
B01454692-I1-SC
09/16/2026
Permit issued — Structural
B01148898-I1-GC-CX
09/15/2026
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
B01148898-S1
09/15/2026
Permit issued — Sidewalk Shed
B01148898-S1-SH
09/03/2026
Filed — Alteration
Suspended Scaffold outrigger installation for Facade repair Works
B01454692-I1
05/08/2026
Violation issued (HPD, open)
A
03/02/2026
Violation issued (FDNY_NOV, closed)
03/02/2026
Violation issued (FDNY_NOV, closed)
02/08/2026
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, closed)
C
12/15/2025
Violation issued (HPD, open)
C
11/19/2025
Violation issued (HPD, closed)
I
08/15/2025
Violation issued (FDNY_NOV, closed)
08/15/2025
Violation issued (FDNY_NOV, closed)
06/13/2025
Violation issued (HPD, open)
A
04/22/2025
Cycle 9 facade report signed — SWARMP
04/08/2025
Cycle 9 facade report submitted
04/02/2025
Cycle 9 facade inspection completed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/22/2025
Objection resolved — Addressed
01/07/2025
Objection raised — Structural
01/07/2025
Objection raised — Structural
01/07/2025
Objection raised — Structural
01/02/2025
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
B01148898-I1
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
11/27/2024
Special inspection requirement — Final
JOHN SEMIOLI
11/27/2024
Special inspection requirement — Masonry
JOHN SEMIOLI
11/27/2024
Special inspection requirement — Tenant Protection Plan Compliance
MOHSIN BHUIYAN
08/09/2024
Violation issued (FDNY_NOV, closed)
08/09/2024
Violation issued (FDNY_NOV, closed)
06/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2024
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CODE NINJAS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01000677-I1
04/22/2024
Signed off — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-I1
04/17/2024
Violation issued (HPD, open)
A
04/08/2024
Signed off — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-S2
04/08/2024
Signed off — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-S1
04/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/18/2024
Signed off — Alteration
APPLICATION FILED FOR MINOR DEMOLITION AND PARTITION WORK, NO CHANGE TO LIGHTING, SPRINKLER, OCCUPANCY OR EGRESS. ADDITION OF WASHER/DRYER VIA PLUMBER LAA. ALL WORK IS LIMITED TO THE FIRST FLOOR INDICATED IN THE PLANS.
B00873610-I1
03/13/2024
Permit issued — Sign
B01000677-I1-SG
02/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/21/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/15/2024
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - CODE NINJAS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01000677-I1
02/15/2024
Special inspection requirement — Final
LEON SKVIRSKY
01/25/2024
Permit issued — Mechanical Systems
B00978787-S1-MS
01/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
01/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
01/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
JOHN SEMIOLI
01/16/2024
Filed — Alteration CO
APPLICATION FILED TO REMOVE VACANT FROM RETAIL SPACES & MINOR INTERIOR DEMOLITION OF PARTITION IN COMMERCIAL SPACE #2NO CHANGE TO EXISTING DAY CARE SPACE
B00904962-P1
01/11/2024
Permit issued — Plumbing
B00978787-S2-PL
01/10/2024
Permit issued — General Construction
B00978787-I1-GC
01/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN SEMIOLI
01/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
JOHN SEMIOLI
12/21/2023
Filed — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-I1
12/21/2023
Filed — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-S2
12/21/2023
Filed — Alteration
Mechanical modifications of the existing ductwork on the ground floor daycare/educational space only. No change of use, egress or occupancy.
B00978787-S1
12/21/2023
Special inspection requirement — HVAC-R and service water heating equipment
RAFAEL FIGUEROA
12/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAFAEL FIGUEROA
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedMughal General Construction09/28/2026
DOB NOWStructuralPermit IssuedExcel Restoration09/16/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/15/2026
DOB NOWSignSigned-offEnrico Passaro03/13/2024
DOB NOWMechanical SystemsSigned-offLXC Construction01/25/2024
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS01/11/2024
DOB NOWGeneral ConstructionSigned-offLXC Construction01/10/2024
DOB NOWGeneral ConstructionSigned-offHigh Quality Construction12/19/2023
DOB NOWGeneral ConstructionPermit IssuedCountrywide Home Improvem11/21/2023
BISPLISSUEDAbr Plumbing & Heating Contracting02/14/2024
BISPLISSUEDAbr Plumbing & Heating Contracting02/05/2024
BISPLISSUEDHenry Myers P & H02/21/2013
BISMHISSUEDKong's Carpenters Management01/30/2013
BISOTISSUEDKong's Carpenters Management01/25/2013
BISMHISSUEDP & J Renovations11/07/2012
BISPLISSUEDC.W.C. Fire Suppression10/10/2012
BISPLISSUEDRoss Russo Plumbing & Heating08/07/2012
BISOTISSUEDP & J Renovations07/19/2012
BISSPISSUEDParkset Plumbing Co04/04/2012
BISPLISSUEDAttack Plumbing03/13/2012
BISOTISSUEDVip Supply01/09/2012
BISPLISSUEDAccess Plumbing07/19/2011
BISOTISSUEDIconic Builders06/07/2011
BISOTISSUEDIconic Builders06/07/2011
BISSDISSUEDFirequest03/11/2011
BISEQISSUEDMC & O Contracting08/13/2010
BIS—ISSUEDIconic Builders06/09/2010
BISEQISSUEDIconic Builders06/03/2010
BISEQISSUEDPowers Bridging & Scaffolding03/31/2010
BISEQISSUEDMC & O Contracting01/21/2010
BISSDISSUEDFirequest10/23/2009
BISPLISSUEDAccess Plumbing07/15/2009
BIS—ISSUEDIconic Builders06/09/2009
BISEQISSUEDIconic Builders06/05/2009
BISEQISSUEDIconic Builders06/05/2009
BIS—ISSUEDIconic Builders04/21/2009
BISPLISSUEDM. Early Plumbing & Heating12/02/2008
BISPLISSUEDCopper Plumbing & Heating10/21/2008
BISEQISSUEDIconic Builders07/08/2008
BISEQISSUEDIconic Builders06/25/2008
+ 19 more permits on file
3 projects · most recent 09/01/2026
General Wiring
FiledStatusContractorScope
09/01/2026Permit IssuedHigh Quality Electric of NYC—
05/07/2024CompletePac Electric1 meters, 1 new_meters
02/02/2024CompleteKJK ElectricGeneral Wiring
1 project · most recent 09/15/2026
FiledStatusContractorScope
09/15/2026Permit IssuedExcel Restoration1 scope_items
1 project · most recent 09/15/2026
Sidewalk Shed
FiledStatusContractorScope
09/15/2026Permit IssuedExcel RestorationSidewalk Shed
1 project · most recent 09/03/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/03/2026Permit IssuedMughal General ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
11/27/2024Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
11/27/2024FinalJOHN SEMIOLIprogress
11/27/2024MasonryJOHN SEMIOLIspecial
11/27/2024Tenant Protection Plan ComplianceMOHSIN BHUIYANspecial
02/15/2024FinalLEON SKVIRSKYprogress
01/23/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
01/23/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
01/23/2024Tenant Protection Plan ComplianceJOHN SEMIOLIspecial
01/08/2024Tenant Protection Plan Compliance—special
01/05/2024Fire-Resistant Penetrations and JointsJOHN SEMIOLIspecial
01/05/2024Fire-Resistance Rated ConstructionJOHN SEMIOLIprogress
12/21/2023HVAC-R and service water heating equipmentRAFAEL FIGUEROAenergy_progress
12/21/2023Fire-Resistant Penetrations and JointsRAFAEL FIGUEROAspecial
12/21/2023Maintenance informationRAFAEL FIGUEROAenergy_progress
12/21/2023HVAC-R and service water piping design and insulationRAFAEL FIGUEROAenergy_progress
12/20/2023Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
12/20/2023Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
12/20/2023Tenant Protection Plan ComplianceRAFAEL FIGUEROAspecial
12/19/2023Mechanical SystemsRAFAEL FIGUEROAspecial
12/19/2023FinalRAFAEL FIGUEROAprogress
12/19/2023Maintenance informationRAFAEL FIGUEROAenergy_progress
12/19/2023HVAC-R and service water heating system controlsRAFAEL FIGUEROAenergy_progress
12/19/2023HVAC-R and service water heating equipmentRAFAEL FIGUEROAenergy_progress
12/19/2023HVAC-R and service water piping design and insulationRAFAEL FIGUEROAenergy_progress
12/18/2023Energy Code Compliance InspectionsRAFAEL FIGUEROAprogress
Latest 25 of 29.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Code NinjasEducation—
Project B01000677 Alteration · LOC Issued · 02/15/2024
Code Ninja SchoolEducationFloor 1
Project B00978787 Alteration · LOC Issued · 12/21/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 503 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/04/2026B01454692-I1Request digital key ↗
08/27/2026B00873610-I1Request digital key ↗
08/26/2026B00978787-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits99
▸BISPLAN / WORK APPROVAL APPLICATION57
02/21/2024320528808Open ↗
02/16/2024320528808Open ↗
02/07/2024320707320Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION40
02/21/2024320707320Open ↗
02/06/2024320528808Open ↗
02/22/2013320707320Open ↗
Showing 3 of 40 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISADDRESS - NEW HOUSE NUMBER APPROVED2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00904962-P1Open ↗
08/13/2026B00904962-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00904962-I1Open ↗
▸Seals & Professional Certifications108
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION46
01/27/2020322031699Open ↗
08/22/2013320412861Open ↗
05/10/2013320528808Open ↗
Showing 3 of 46 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/25/2026B01148898-I1Open ↗
09/01/2026B00904962-P1Open ↗
08/31/2026B01000677-I1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
01/23/2013320707320Open ↗
07/25/2012320528808Open ↗
10/25/2011320380583Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM11
01/23/2013320707320Open ↗
08/14/2012320528808Open ↗
10/25/2011320380583Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/25/2026B01148898-I1Open ↗
09/25/2026B01148898-I1Open ↗
09/01/2026B00904962-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/17/2026B01148898-S1Open ↗
08/27/2026B00873610-I1Open ↗
08/26/2026B00978787-S2Open ↗
Showing 3 of 9 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment80
▸BISSELF-CERT PLUMBING NOTICE26
07/12/2013320528808Open ↗
12/04/2012320412861Open ↗
12/03/2012320412861Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING16
02/16/2024320528808Open ↗
11/08/2023320707320Open ↗
01/23/2013320707320Open ↗
Showing 3 of 16 on file for this type
▸BISRPZ/DDCV TEST REPORT : GEN215B14
06/28/2011320104481Open ↗
06/28/2011320104481Open ↗
06/28/2011320085732Open ↗
Showing 3 of 14 on file for this type
▸BISWATER METER PERMIT : DEP-METER8
06/28/2011320104481Open ↗
06/28/2011320085732Open ↗
Showing 2 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
12/03/2012320412861Open ↗
06/28/2011320085732Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSEWER/HOUSE CON SIGNOFF: DEP HC 0213
06/24/2011310058816Open ↗
06/24/2011310058816Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/10/2024320343847Open ↗
12/28/2023320343847Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/15/2024320707320Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/23/2014320707320Open ↗
▸BISSTANDPIPE INSP REPORT : FP-841
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection5
▸BISSTREET TREE CHECKLIST3
01/27/2020322031699Open ↗
01/23/2013320707320Open ↗
Showing 2 of 3 on file for this type
▸BISTenant Protection Plan and Notes1
01/27/2020322031699Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER16
01/23/2013320707320Open ↗
10/25/2011320380583Open ↗
Showing 2 of 16 on file for this type
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
01/27/2020322031699Open ↗
08/22/2013320412861Open ↗
05/10/2013320528808Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/30/2024320528808Open ↗
03/21/2024320707320Open ↗
03/05/2024320528808Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
04/04/2024320528808Open ↗
03/18/2024320707320Open ↗
▸BISINTERIOR LIGHTING POWER1
03/15/2024320707320Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/22/2013320412861Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/15/2024320707320Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY6
04/29/2024320528808Open ↗
04/05/2024320528808Open ↗
04/02/2024320528808Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMECHANICAL SYSTEMS2
03/15/2024320707320Open ↗
03/13/2024320528808Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs67
▸BISLETTERS - SUPPORTING DOCUMENTATION19
02/21/2024320707320Open ↗
12/03/2012320412861Open ↗
10/25/2011320380583Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS19
01/23/2013320707320Open ↗
08/24/2012320528808Open ↗
12/23/2011320412861Open ↗
Showing 3 of 19 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST12
05/01/2024320528808Open ↗
04/03/2024320707320Open ↗
01/16/2024320343847Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
01/27/2020322031699Open ↗
01/27/2020322031699Open ↗
01/27/2020322031699Open ↗
Showing 3 of 6 on file for this type
▸BISTAP LETTER - FIRE SVC : DEP-FIRE5
06/28/2011320104481Open ↗
06/28/2011320085732Open ↗
06/24/2011310058816Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
02/06/2024320528808Open ↗
07/25/2011310058816Open ↗
Showing 2 of 3 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
06/24/2011310058816Open ↗
Showing 1 of 2 on file for this type
▸BISTRANSIT AUTHORITY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT18
12/28/2023320343847Open ↗
01/27/2020322031699Open ↗
08/22/2013320412861Open ↗
Showing 3 of 18 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/02/2024320707320Open ↗
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET20
01/27/2020322031699Open ↗
01/18/2013320707320Open ↗
07/25/2012320528808Open ↗
Showing 3 of 20 on file for this type
▸BISADDITIONAL INFORMATION11
02/01/2024320528808Open ↗
07/23/2014320707320Open ↗
06/28/2012320412861Open ↗
Showing 3 of 11 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents31
▸BISOP-129 INTERNAL (SECONDARY) BACKFLOW PREVENTION DEVICE TEST REPORT21
12/04/2012320412861Open ↗
07/14/2011310058816Open ↗
07/14/2011310058816Open ↗
Showing 3 of 21 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
08/26/2026B00904962-P1Open ↗
08/26/2026B00904962-I1Open ↗
▸BISDRY PIPE VALVE TEST : FP-101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSD/SP FIRE PUMP TEST : FP-861
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
09/29/2026B01454692-I1Open ↗
▸DOB NOWManufacturer's Specifications1
09/29/2026B01454692-I1Open ↗