← Back
BuildNYC
One story - permanent living quarter
150-50 119TH ROAD
QUEENS · BIN 4265189
💬 Discuss this project
1930Year Built
1.5Stories
A2Building Class
R3XZoning
946 sfGross Floor Area
1Units
One story - permanent living quarter · Owner of record: Chai 555 · 4,000 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPEDRAM 1-family to 2-family dwelling conversion and extensio2p · 1 filing · 20 docs
Floor 2PEDRAM 1-family to 2-family dwelling conversion and extensio6p · 1 filing · 20 docs
Floor 1PEDRAM 1-family to 2-family dwelling conversion and extensio6p · 1 filing · 20 docs
CellarPEDRAM 1-family to 2-family dwelling conversion and extensio6p · 1 filing · 20 docs
Site & exteriorPEDRAM 1-family to 2-family dwelling conversion and extensio7p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/30/2025$450K—CASCADE FUNDING MORTGAGE TRUST HB7 → CHAI 555 LLC$476/sf building
11/10/2023$934K—— → —$987/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sion Consulting Engineering808/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sion Consulting Engineering403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DesignsGeneral Contractor104/09/2026
J&J DesignsScaffold107/08/2026
Renew PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sion Consulting Engineering1108708/14/2026
Building Lifecycle
All (88)Filed (8)Permit Issued (3)Signed Off (3)Inspection (4)Objection (40)Special Inspection (30)
08/25/2026
Signed off — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-I1
08/19/2026
Special inspection requirement — Ventilation and air distribution system
sion hourizadeh
08/19/2026
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
08/19/2026
Special inspection requirement — Metering
sion hourizadeh
08/19/2026
Special inspection requirement — Insulation placement and R values
sion hourizadeh
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
08/19/2026
Special inspection requirement — Fenestration air leakage
sion hourizadeh
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
08/19/2026
Special inspection requirement — Maintenance information
sion hourizadeh
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
08/19/2026
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
08/19/2026
Special inspection requirement — Final
sion hourizadeh
08/19/2026
Special inspection requirement — Footing and Foundation
sion hourizadeh
08/19/2026
Special inspection requirement — Subgrade Inspections
sion hourizadeh
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
08/19/2026
Special inspection requirement — Fenestration areas
sion hourizadeh
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
08/19/2026
Special inspection requirement — Mechanical Systems
sion hourizadeh
08/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
sion hourizadeh
08/19/2026
Special inspection requirement — Interior lighting power
sion hourizadeh
08/19/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
08/19/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
08/19/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
08/19/2026
Special inspection requirement — Structural Wood Frame
sion hourizadeh
08/19/2026
Special inspection requirement — Heating Systems
sion hourizadeh
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
08/19/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
sion hourizadeh
08/14/2026
Filed — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-P7
06/09/2026
Signed off — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-S1
06/09/2026
Filed — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-P4
05/18/2026
Special inspection requirement — Maintenance information
sion hourizadeh
05/12/2026
Signed off — Alteration
THIS APPLICATION IS FILED FOR 8' HEIGHT TEMPERORY CONSTRUCTION FENCE
Q01227156-I1
05/05/2026
Filed — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-P3
04/23/2026
Objection resolved — Addressed
04/21/2026
Objection raised — Cost
04/17/2026
Filed — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-P1
04/13/2026
Filed — Alteration CO
THIS APPLICATION IS FILED FOR INSTALLATION OF (4) BATH TUB,(1) SHOWER(2)KITCHEN SINK,(5) LAVATORY, 5)TOILET,(3)WASHER,(2)GAS HOT WATER HEATER,(2)GAS RANGE(2)ELEC FURNACE,(2) GAS METER (2) DISHWASHER , (3) GAS DRYER IN CONJUNCTION WITH APPLIC.#Q01248406-I1
Q01248406-P2
01/23/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/23/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/12/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/12/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/05/2026
Permit issued — Plumbing
Q01248406-S1-PL
12/18/2025
Permit issued — Earth Work
Q01248406-I1-GC-CX
12/17/2025
Objection resolved — Addressed
12/16/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/21/2025
Objection resolved — Addressed
11/04/2025
Objection resolved — Addressed
10/27/2025
Objection raised — Cost
10/27/2025
Objection resolved — Addressed
10/22/2025
Objection resolved — Addressed
09/23/2025
Objection raised — Plumbing
09/23/2025
Objection raised — Cost
09/17/2025
Objection resolved — Addressed
09/17/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
09/15/2025
Objection resolved — Addressed
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRenew Plumbing01/05/2026
DOB NOWEarth WorkPermit IssuedJ&J Designs12/18/2025
DOB NOWConstruction FenceSigned-offJ&J Designs06/18/2025
1 project · most recent 08/14/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026Permit IssuedJ&J DesignsHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Cooper & Hunter COOPER & HUNTER CH-RS48LCU-230VO 60,000 BTU · Heat Pump Outdoor ×6
COOPER & HUNTER CH-RS48LCAHU 60,000 BTU · Fan Coil Indoor ×3
Mitsubishi Electric MITSUBISHI 60,000 BTU ×2
Ventilation
Delta DELTA ELECTRONIC-GBR80LED 400 CFM ×20
Panasonic PANASONIC FV15VQ5 300 CFM · Exhaust Fan ×8
MITSUBISHI 150 CFM ×7
1 project · most recent 08/14/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/14/2026Signed-offRenew PlumbingGas, Storm, Water/Sanitary
1 project · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025CompletePower Surge ElectricGeneral Wiring
1 project · most recent 08/14/2026
Concrete
FiledStatusContractorScope
08/14/2026Signed-offRenew PlumbingConcrete
1 project · most recent 06/17/2025
Fence
FiledStatusContractorScope
06/17/2025Signed-offJ&J DesignsFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/23/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/12/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/12/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
08/19/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
08/19/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
08/19/2026Ventilation and air distribution systemsion hourizadehenergy_progress
08/19/2026Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
08/19/2026Insulation placement and R valuession hourizadehenergy_progress
08/19/2026Air barrier - visual inspectionsion hourizadehenergy_progress
08/19/2026Permanent certificatesion hourizadehenergy_progress
08/19/2026Interior lighting powersion hourizadehenergy_progress
08/19/2026Duct leakage testing, insulation and designsion hourizadehenergy_progress
08/19/2026Electric vehicle service equipment requirementssion hourizadehenergy_progress
08/19/2026Meteringsion hourizadehenergy_progress
08/19/2026HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
08/19/2026Maintenance informationsion hourizadehenergy_progress
08/19/2026Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
08/19/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
08/19/2026Fenestration areassion hourizadehenergy_progress
08/19/2026Fenestration air leakagesion hourizadehenergy_progress
08/19/2026Fire-Resistance Rated Constructionsion hourizadehprogress
08/19/2026Footing and Foundationsion hourizadehprogress
08/19/2026Structural Wood Framesion hourizadehprogress
08/19/2026Finalsion hourizadehprogress
08/19/2026Energy Code Compliance Inspectionssion hourizadehprogress
08/19/2026Mechanical Systemssion hourizadehspecial
08/19/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
08/19/2026Concrete - Cast-In-Placesion hourizadehspecial
Latest 25 of 79.
▾Documents — 99 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026Q01227156-I1Request digital key ↗
08/16/2026Q01248406-I1Request digital key ↗
08/16/2026Q01248406-P6Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026Q01248406-I1Open ↗
08/13/2026Q01248406-P1Open ↗
▸Seals & Professional Certifications37
▸DOB NOWProgress Inspector Seal & Signature15
09/02/2026Q01248406-I1Open ↗
09/02/2026Q01248406-I1Open ↗
09/02/2026Q01248406-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026Q01248406-I1Open ↗
09/02/2026Q01248406-I1Open ↗
09/02/2026Q01248406-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/19/2026Q01227156-I1Open ↗
08/19/2026Q01248406-I1Open ↗
08/16/2026Q01248406-I1Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/16/2026Q01248406-I1Open ↗
08/16/2026Q01248406-P4Open ↗
08/16/2026Q01248406-P3Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01248406-I1Open ↗
▸Other Documents22
▸DOB NOWSite Survey: Initial5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlot Diagram5
08/16/2026Q01248406-P6Open ↗
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProperty Ownership Certification5
08/16/2026Q01248406-I1Open ↗
08/16/2026Q01248406-P7Open ↗
08/16/2026Q01248406-P6Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01248406-I1Open ↗
▸DOB NOWFinal Survey1
08/16/2026Q01248406-I1Open ↗