← Back
Two stories - detached, small or mid-size
150-57 116 ROAD
QUEENS · BIN 4264679
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R3AZoning
1,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureCivil
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M RE VENTURES I REO2107/08/2026
1052 EAST 102 LLC1003/22/2026
OCEAN CONTRACTING103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/21/2025$587K—— → —$587/sf building
02/21/2025$660K—— → —$660/sf building
08/18/2017$363K—— → —$363/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROHAN ENGINEERING, PC706/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
VRD DEVELOPMENT1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
OCEAN CONTRACTING LLCGeneral Contractor507/08/2026
WATER WORKS PIPING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROHAN ENGINEERING, PC2600205/16/2024
Building Lifecycle
All (89)Filed (7)Permit Issued (5)Signed Off (2)Violation (16)Inspection (7)Objection (40)Special Inspection (12)
08/19/2024
Signed off — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-S1
06/27/2024
Filed — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-P4
06/26/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/26/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
06/26/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
06/20/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
BRIAN ROHAN
06/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN ROHAN
06/10/2024
Special inspection requirement — Final
BRIAN ROHAN
06/05/2024
Filed — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-P3
06/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
06/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
05/28/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/16/2024
Signed off — Alteration
Q00622738-I1
05/16/2024
Filed — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-P2
02/09/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/05/2024
Filed — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-P1
12/27/2023
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ROHAN
12/27/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
BRIAN ROHAN
12/27/2023
Special inspection requirement — HVAC-R and service water heating system controls
BRIAN ROHAN
11/20/2023
Permit issued — Construction Fence
Q00622738-I1-FN
06/27/2023
Permit issued — Plumbing
Q00695169-S1-PL
06/12/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2023
Permit issued — Earth Work
Q00695169-I1-GC-CX
05/30/2023
Filed — Alteration CO
PROPOSED TO RENOVATE AND RESTORE EXISTING FIRE DMAGED BUILDING.
Q00695169-S1
05/08/2023
Objection resolved — Addressed
05/05/2023
Objection raised — Admin
05/02/2023
Objection resolved — Addressed
05/02/2023
Objection resolved — Addressed
05/02/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
04/10/2023
Objection resolved — Addressed
02/08/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
02/03/2023
Objection resolved — Addressed
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection resolved — Addressed
01/11/2023
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/27/2022
Objection resolved — Addressed
12/23/2022
Objection raised — Zoning
12/23/2022
Objection raised — Scope
12/23/2022
Objection raised — Scope
12/23/2022
Objection raised — Scope
12/23/2022
Objection raised — Inspections
12/23/2022
Objection raised — Admin
12/23/2022
Objection raised — Scope
12/23/2022
Objection raised — Structural
12/23/2022
Objection raised — Structural
12/23/2022
Objection raised — Other
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offMG BUILDERS/ANM MANAGE11/20/2023
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP06/27/2023
DOB NOWEarth WorkPermit IssuedMG BUILDERS/ANM MANAGE06/04/2023
DOB NOWConstruction FenceSigned-offMG BUILDERS/ANM MANAGE11/18/2022
DOB NOWConstruction FenceSigned-offMG BUILDERS/ANM MANAGE12/17/2021
1 project · most recent 06/27/2024
Gas Water/Sanitary
FiledStatusContractorScope
06/27/2024Signed-offSUPERIOR PIPING&MECH CORPGas, Water/Sanitary
1 project · most recent 10/16/2023
General Wiring Lighting
FiledStatusContractorScope
10/16/2023CompleteSAFEWAY CONSTRUCTION, INCGeneral Wiring, Lighting
1 project · most recent 06/27/2024
Wood
FiledStatusContractorScope
06/27/2024Signed-offSUPERIOR PIPING&MECH CORPWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/20/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/28/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/09/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/12/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
06/26/2024Energy Code Compliance InspectionsBRIAN ROHANprogress
06/26/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/26/2024HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
06/10/2024Construction Operations Influencing Adjacent StructuresBRIAN ROHANspecial
06/10/2024Structural Stability – Alterations of existing buildingsBRIAN ROHANspecial
06/10/2024FinalBRIAN ROHANprogress
06/05/2024HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
06/05/2024Energy Code Compliance InspectionsBRIAN ROHANprogress
06/05/2024HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
12/27/2023Energy Code Compliance InspectionsBRIAN ROHANprogress
12/27/2023HVAC-R and service water piping design and insulationBRIAN ROHANenergy_progress
12/27/2023HVAC-R and service water heating system controlsBRIAN ROHANenergy_progress
▾Documents — 39 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/27/2026Q00622738-I1Request digital key ↗
08/22/2026Q00695169-P4Request digital key ↗
08/22/2026Q00695169-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00695169-I1Open ↗
08/13/2026Q00695169-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00695169-I1Open ↗
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q00695169-P4Open ↗
09/01/2026Q00695169-P4Open ↗
08/27/2026Q00695169-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/22/2026Q00695169-P4Open ↗
08/22/2026Q00695169-P3Open ↗
08/22/2026Q00695169-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00695169-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/22/2026Q00695169-P2Open ↗
08/15/2026Q00695169-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/22/2026Q00695169-S1Open ↗
08/15/2026Q00695169-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial2
08/13/2026Q00695169-I1Open ↗
08/13/2026Q00695169-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00695169-P2Open ↗
08/13/2026Q00695169-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/22/2026Q00695169-P2Open ↗
08/15/2026Q00695169-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00695169-I1Open ↗
08/13/2026Q00695169-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00695169-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00695169-I1Open ↗