Two stories - detached, small or mid-size
150-61 32 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4109106
💬 Discuss this project
1935Year Built
2Stories
A1Building Class
R2AZoning
1,636 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,287 sf lot · 0.22 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof3p · 1 filing · 10 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC207/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R SOLAR DESIGN403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARVEST POWER LLCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM ENGINEERING PLLC6244207/24/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
09/03/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01209134-I1
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
07/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
07/25/2025
Special inspection requirement — Final
NARESH MAHANGU
07/25/2025
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
07/25/2025
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
07/24/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01209134-P1
04/24/2025
Permit issued — Solar
Q01209134-I1-SL
04/14/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01209134-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offHARVEST POWER LLC04/24/2025
1 project · most recent 04/14/2025
FiledStatusContractorScope
04/14/2025CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/25/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
07/25/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
07/25/2025FinalNARESH MAHANGUprogress
07/25/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
07/25/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/20/2026Q01209134-P1Request digital key ↗
08/20/2026Q01209134-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/20/2026Q01209134-I1Open ↗
08/20/2026Q01209134-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q01209134-I1Open ↗
09/01/2026Q01209134-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q01209134-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026Q01209134-I1Open ↗
08/20/2026Q01209134-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01209134-I1Open ↗