Condo, residential tower (mixed-use, multi-family elevator) [derived]
Aire
150 AMSTERDAM AVENUE · Name © OpenStreetMap contributors · Upper West Side-Lincoln Square · BIN 1088576
💬 Discuss this project
2007Year Built
42Stories
RMBuilding Class
R8Zoning
390,682 sfGross Floor Area
312Units
LL97 CoveredRent Stabilized3 Open Violations 2 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 50,000 sf lot · 7.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 46p · 2 filings · 15 docs
Floor 32p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 13p · 3 filings · 20 docs
Cellar18p · 5 filings · 20 docs
Sub-Cellar2p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOTHAM REAL ESTATE MANAGERS1606/27/2026
150 AMSTERDAM AVENUE HOLDING3603/22/2026
AMERICAN RED CROSS703/22/2026
UNIVERSAL BUILDERS SUPPLY103/22/2026
FUJITEC103/22/2026
150 AMSTERDAM HOLDINGS3503/22/2026
150 AMSTERDAM HOUSING103/22/2026
CLARIS CONSTRUCTION103/22/2026
150 AMSTERDAM AVENEUE10303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MCALPINE CONTRACTING COGeneral Contractor1307/08/2026
MARQUIS P & H CO., INCPlumbing407/08/2026
BALATON CONSULTING LLCScaffold207/08/2026
NEW TECH MECHAN SYSTEMS IGeneral Contractor207/08/2026
PEAK FIRE PROTECTION LLCFire Protection107/08/2026
FPS CONTRACTING INCGeneral Contractor107/08/2026
ALKLEM PLUMBING INC.Fire Protection107/08/2026
MSK ELECTL INSTALLATIONElectrical103/22/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor107/08/2026
SOLICITO & SON CONTRACTGeneral Contractor104/09/2026
TOTAL HOME IMPROVEMENT SEGeneral Contractor107/08/2026
ALKLEM PLUMBING INCPlumbing107/08/2026
ROBERT CHIMENTIElectrical103/22/2026
METROTECH MECHANICAL CORPPlumbing107/08/2026
PACE PLUMBING CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FENAGH, INC6942101/23/2026
MILROSE CONSULTANTS LLC2003410/20/2025
ALAN MARGOLIN & ASSOC4231207/31/2023
C.M. TESTING LABORATORY,1352108/19/2021
EMTG CONSULTANTS4222212/16/2020
GREGORY V. PEROTTO, P.E.947212/16/2020
Building Lifecycle
All (180)Filed (25)Permit Issued (21)Signed Off (16)Facade (FISP) (9)Violation (60)Inspection (15)Objection (4)Special Inspection (30)
09/05/2026
Violation issued (HPD, open)
B
07/06/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01364423-I1
06/25/2026
Violation issued (ECB, open)
Elevators
06/08/2026
Cycle 10 facade report submitted
06/05/2026
Cycle 10 facade report signed — SAFE
06/03/2026
Cycle 10 facade inspection completed
04/21/2026
Permit issued — Suspended Scaffold
M01364423-I1-SC
04/08/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01364423-I1
03/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/26/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/17/2026
Permit issued — Sprinklers
M01323135-I1-EW-SP
02/06/2026
Signed off — Alteration
Add 2 BBQs and a fire pit. Bring new gas line to fixtures. Provide plumbing for new sinks at BBQ.
M01061982-I1
01/23/2026
Filed — Alteration
Relocation of existing sprinklers and installation of new sprinkler downstream of existing floor control valve assemblies. Addition of gasket sprinkler covers. No change in egress, occupancy, or use.
M01323135-I1
01/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
12/18/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
12/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
11/21/2025
Special inspection requirement — Sprinkler Systems
AILANTO DANIEL MINAWI
11/21/2025
Special inspection requirement — Post-installed Anchors
AILANTO DANIEL MINAWI
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
AILANTO DANIEL MINAWI
11/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
AILANTO DANIEL MINAWI
11/06/2025
Signed off — Alteration
M01062056-I1
10/20/2025
Filed — Alteration
Add 2 BBQs and a fire pit. Bring new gas line to fixtures. Provide plumbing for new sinks at BBQ.
M01061982-P2
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
06/25/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
05/29/2025
Violation issued (HPD, closed)
C
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/23/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/10/2025
Objection resolved — Addressed
04/08/2025
Objection raised — Scope
04/01/2025
Filed — Alteration
Add 2 BBQs and a fire pit. Bring new gas line to fixtures. Provide plumbing for new sinks at BBQ.
M01061982-P1
03/18/2025
Special inspection requirement — Post-installed Anchors
Christopher Drutjons
03/18/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
03/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
03/06/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/20/2025
Permit issued — Plumbing
M01061982-I1-PL
11/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/06/2024
Permit issued — Plumbing
M01061982-I1-PL
09/06/2024
Permit issued — General Construction
M01062056-I1-GC
06/21/2024
Filed — Alteration
Add 2 BBQs and a fire pit. Bring new gas line to fixtures. Provide plumbing for new sinks at BBQ.
M01061982-I1
06/21/2024
Filed — Alteration
M01062056-I1
06/18/2024
Special inspection requirement — Final
Christopher Drutjons
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher Drutjons
06/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
Christopher Drutjons
11/02/2023
Signed off — Alteration
REMOVE EXISTING PLUMBING FIXTURES, PROVIDE PLUMBING AND SANITARY FACILITIES, AND INSTALL MEDICAL GAS TANKS ON PART CELLAR AND FIRST FLOORS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08002146-I1
11/02/2023
Signed off — Alteration
MODIFY EXISTING SRPINKLER LAYOUT AND INSTALL TEMPORARY CORE SPRINKLER PROTECTION ON PART CELLAR AND FIRST FLOORS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08002310-I1
11/02/2023
Signed off — Alteration
PROVIDE HVAC SYSTEM TO PART CELLAR AND FIRST FLOORS AS PER PLANS FILED. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08002100-I1
11/01/2023
Signed off — Alteration
M00780885-I1
11/01/2023
Signed off — Alteration
M08002024-I1
08/25/2023
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
08/25/2023
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
08/25/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/10/2023
Objection resolved — Addressed
08/09/2023
Objection raised — Admin
08/08/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/03/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 180 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S04/21/2026
DOB NOWSprinklersSigned-offMANENGEERING BUREAU, INC02/17/2026
DOB NOWPlumbingSigned-offMARQUIS P & H CO., INC02/20/2025
DOB NOWPlumbingSigned-offMARQUIS P & H CO., INC09/06/2024
DOB NOWGeneral ConstructionSigned-offSOLICITO & SON CONTRACT09/06/2024
DOB NOWGeneral ConstructionSigned-offMCALPINE CONTRACTING CO05/09/2023
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO05/09/2023
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP12/28/2022
DOB NOWSprinklersSigned-offPEAK FIRE PROTECTION LLC10/26/2022
DOB NOWMechanical SystemsSigned-offMCALPINE CONTRACTING CO10/24/2022
DOB NOWGeneral ConstructionSigned-offMCALPINE CONTRACTING CO10/21/2022
DOB NOWGeneral ConstructionSigned-offMCALPINE CONTRACTING CO08/29/2022
DOB NOWMechanical SystemsSigned-offFPS CONTRACTING INC08/24/2021
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/19/2021
DOB NOWSignSigned-offNORTH SHORE NEON SIGN CO05/19/2021
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC03/12/2021
DOB NOWMechanical SystemsSigned-offTOTAL HOME IMPROVEMENT SE02/08/2021
DOB NOWPlumbingSigned-offALKLEM PLUMBING INC01/25/2021
DOB NOWSprinklersSigned-offALKLEM PLUMBING INC.01/25/2021
DOB NOWMechanical SystemsSigned-offNEW TECH MECHAN SYSTEMS I11/20/2020
DOB NOWMechanical SystemsSigned-offNEW TECH MECHAN SYSTEMS I11/19/2019
BISOTISSUEDTOTAL HOME IMPROVEMENT SE01/27/2021
BISOTISSUEDPROBUILD CONTRACTING, INC08/12/2020
BISOTISSUEDKLARACON LLC03/09/2020
BISOTISSUEDPROBUILD CONTRACTING, INC06/18/2019
BISOTISSUEDTROJAN INTERIORS INC07/11/2017
BISSPISSUEDGO GREENER PLUMBING LLC03/29/2017
BISPLISSUEDSERVICE TECH MECH&PLBG IN03/28/2017
BISBLISSUEDSERVICE TECH MECH&PLBG IN03/28/2017
BIS—ISSUEDA. BONADUCE, INC02/01/2017
BISOTISSUEDA. BONADUCE, INC02/01/2017
BISMHISSUEDA. BONADUCE, INC02/01/2017
BISOTISSUEDA. BONADUCE, INC09/27/2016
BISMHISSUEDA. BONADUCE, INC09/27/2016
BISSPISSUEDULTIMATE P & H CORP08/22/2016
BISPLISSUEDULTIMATE PLBG AND HTG COR08/22/2016
BISOTISSUEDRYAN CONTRACTING LLC08/15/2016
BISMHISSUEDRYAN CONTRACTING LLC08/15/2016
BISPLISSUEDGO GREENER PLUMBING LLC07/25/2016
BIS—ISSUEDA. BONADUCE, INC07/21/2016
+ 31 more permits on file
1 project · most recent 01/23/2026
FiledStatusContractorScope
01/23/2026Signed-offMANENGEERING BUREAU, INC7 heads
1 project · most recent 01/23/2026
FiledStatusContractorScope
01/23/2026———
10 projects · most recent 03/27/2024
General Wiring Boiler Controls
FiledStatusContractorScope
03/27/2024CompleteROBERT CHIMENTI5 meters, 1 new_meters
07/31/2023CompleteNGM ELECTRIC INCGeneral Wiring
06/08/2023CompleteTEAM ELECTRIC, INCGeneral Wiring
05/20/2022CompleteELPO ELECTRICAL CONTG INCGeneral Wiring
08/17/2021CompleteROBERT CHIMENTI26 meters, 1 new_meters
03/01/2021CompleteMSK ELECTL INSTALLATIONGeneral Wiring
12/03/2019CompleteLIVE WIRE ELECTRICAL, INCBoiler Controls
08/29/2019CompleteNORTHEAST ELECTL CONTINGGeneral Wiring
07/17/2019CompleteS. J. ELECTRIC INC.General Wiring
07/17/2019CompleteS. J. ELECTRIC INC.General Wiring
1 project · most recent 04/08/2026
FiledStatusContractorScope
04/08/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/23/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/25/2023Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
08/25/2023Certified Medical Gas - MG - PL - TestCertifiedView ↗
08/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
12/18/2025Tenant Protection Plan ComplianceChristopher Drutjonsspecial
12/18/2025Post-installed AnchorsChristopher Drutjonsspecial
12/18/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
11/21/2025Sprinkler SystemsAILANTO DANIEL MINAWIspecial
11/21/2025Post-installed AnchorsAILANTO DANIEL MINAWIspecial
11/21/2025Fire-Resistant Penetrations and JointsAILANTO DANIEL MINAWIspecial
11/21/2025Tenant Protection Plan ComplianceAILANTO DANIEL MINAWIspecial
06/25/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
06/25/2025Tenant Protection Plan Compliance—special
06/25/2025Post-installed AnchorsChristopher Drutjonsspecial
03/18/2025Post-installed AnchorsChristopher Drutjonsspecial
03/18/2025Tenant Protection Plan Compliance—special
03/18/2025Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
03/18/2025Alternative Materials - OTCR Buildings Bulletin Number—special
06/18/2024FinalChristopher Drutjonsprogress
06/18/2024Fire-Resistant Penetrations and JointsChristopher Drutjonsspecial
06/06/2024Tenant Protection Plan ComplianceChristopher Drutjonsspecial
08/21/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
08/02/2023FinalYoung Suhprogress
08/02/2023Mechanical SystemsYoung Suhspecial
08/02/2023Post-installed AnchorsYoung Suhspecial
08/02/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
06/08/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
06/08/2023Fire-Resistant Penetrations and JointsYoung Suhspecial
06/08/2023Sprinkler SystemsYoung Suhspecial
Latest 25 of 52.
▾Documents — 917 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch18
09/04/2026M00483076-I1Request digital key ↗
09/03/2026M00502225-I1Request digital key ↗
09/03/2026M00502213-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00243590-I1Request digital key ↗
09/03/2026M00442513-P1Request digital key ↗
09/03/2026M00442513-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler2
09/04/2026M00439227-I1Request digital key ↗
08/15/2026M00439227-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00439141-I1Request digital key ↗
▸Applications & Permits186
▸BISPLAN / WORK APPROVAL APPLICATION92
07/09/2021121755546Open ↗
12/24/2020140989410Open ↗
12/21/2020123573454Open ↗
Showing 3 of 92 on file for this type
▸BISWORK PERMIT APPLICATION90
06/06/2021140989410Open ↗
02/05/2021140989410Open ↗
01/27/2021140989410Open ↗
Showing 3 of 90 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
08/16/2017121755546Open ↗
08/10/2017121755546Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
07/09/2021121755546Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications237
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION126
03/09/2020123573454Open ↗
03/09/2020123573454Open ↗
12/19/2019123779054Open ↗
Showing 3 of 126 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00243590-I1Open ↗
09/05/2026M00243590-P1Open ↗
09/04/2026M00439141-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/29/2026M08002310-P1Open ↗
09/23/2026M01323135-I1Open ↗
09/23/2026M01323135-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026M00442513-P1Open ↗
09/02/2026M00442513-P1Open ↗
09/01/2026M00502225-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
03/09/2020123573454Open ↗
05/22/2019123779054Open ↗
08/15/2017122897847Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
03/09/2020123573454Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
03/27/2017140621833Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment56
▸BISSELF-CERT PLUMBING NOTICE17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
11/14/2019123779054Open ↗
11/13/2019123779054Open ↗
05/22/2019123779054Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA9
02/06/2019122048097Open ↗
01/25/2019121755546Open ↗
12/19/2018122048097Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
03/27/2017140621833Open ↗
Showing 1 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT1
08/18/2017122897847Open ↗
▸BISEQUIPMENT USE PERMITS1
08/18/2017122897847Open ↗
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes8
03/09/2020123573454Open ↗
05/28/2019123779054Open ↗
02/06/2019122048097Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan7
09/03/2026M00442513-P1Open ↗
09/03/2026M00442513-I1Open ↗
08/13/2026M00243590-P1Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN1
05/10/2021140989410Open ↗
▸Environmental & Asbestos25
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
05/12/2017123085703Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M01323135-I1Open ↗
▸Energy Compliance62
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS29
03/09/2020123573454Open ↗
03/09/2020123573454Open ↗
12/19/2019123779054Open ↗
Showing 3 of 29 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
08/19/2021140989410Open ↗
12/19/2019123779054Open ↗
06/20/2018123085703Open ↗
Showing 3 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/20/2021140989410Open ↗
01/27/2021140989410Open ↗
08/12/2020140929404Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
09/03/2026M00575298-I1Open ↗
08/13/2026M00243590-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports50
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY7
08/20/2021140989410Open ↗
08/20/2021140989410Open ↗
01/20/2021140989410Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs97
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST52
08/20/2021140989410Open ↗
02/10/2020121755546Open ↗
12/19/2019123779054Open ↗
Showing 3 of 52 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
12/21/2020123573454Open ↗
02/27/2019122048097Open ↗
01/25/2019121755546Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
02/15/2019121755546Open ↗
11/06/2017121755546Open ↗
Showing 2 of 4 on file for this type
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership45
▸BISCOST AFFIDAVIT44
08/19/2021140989410Open ↗
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
Showing 3 of 44 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms104
▸BISEFILING COVER SHEET48
03/09/2020123573454Open ↗
05/22/2019123779054Open ↗
05/12/2017123085703Open ↗
Showing 3 of 48 on file for this type
▸BISBOROUGH INTAKE FORM27
02/10/2020121755546Open ↗
12/19/2019123779054Open ↗
11/19/2019121755546Open ↗
Showing 3 of 27 on file for this type
▸BISADDITIONAL INFORMATION25
11/14/2019123779054Open ↗
04/02/2018140621833Open ↗
11/15/2017121755546Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/24/2020140989410Open ↗
08/04/2020140929404Open ↗
Showing 2 of 4 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION8
01/25/2019121755546Open ↗
08/18/2017122048097Open ↗
Showing 2 of 8 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/18/2026M01364423-I1Open ↗
▸DOB NOWDHCR Document1
09/03/2026M00575298-I1Open ↗