← Back
MANHATTAN
Keller Hotel
150 BARROW STREET · BIN 1010416
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Rent Stabilized2 Open Violations ▸
Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Roof9p · 6 filings · 20 docs
Bulkhead1p · 1 filing · 18 docs
Floor 711p · 6 filings · 20 docs
Floor 613p · 7 filings · 20 docs
Floor 513p · 6 filings · 20 docs
Floor 413p · 6 filings · 20 docs
Floor 313p · 6 filings · 20 docs
Floor 214p · 6 filings · 20 docs
Floor 127p · 4 filings · 20 docs
Cellar28p · 6 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITANIUM CONSTRUCTION SERVICES3107/08/2026
OWNER OF 144/148 BARROW S103/22/2026
WM GOTTLIEB REAL ESTATE103/22/2026
STEEL SYSTEMS203/21/2026
144-150 BARROW STREET5503/21/2026
BARROW STREET VENTURES603/21/2026
144 BARROW STREET1303/21/2026
150 BARROW STREET1003/21/2026
NYC HOUSING PRESERVATION DEVEL203/21/2026
144-148 BARROW ST203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WAYPOINT CONSULTING GROUP404/23/2026
EP ENGINEERING LLC2608/06/2024
KENDALL ENGINEERING PC405/01/2024
TUNA ARCHITECTURE212/11/2023
PAUL G. JONES, P.E.411/14/2023
GACE DPC305/02/2022
SYED ENGINEERING, P.C.303/02/2022
NAVI STRUCTURAL ENGINEERING, PLLC203/09/2020
MCRB SERVICE CORP201/04/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors203/21/2026
WILLIAM VITACCO ASSOCIATES3503/21/2026
CONSOLIDATED SCAFFOLD BRIDGE1003/21/2026
EUROCELT EXPEDITING, INC403/21/2026
HH BUILDING CONSULTING & ARCHITECTU403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TITANIUM CONSTRUCTION SERGeneral Contractor5207/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor1107/08/2026
STEEL SYSTEMS LLCGeneral Contractor1107/08/2026
MARINE PLUMBING & MECH INPlumbing607/08/2026
S & J INDUSTRIAL CORPFire Protection507/08/2026
METROBUILD LLCGeneral Contractor403/21/2026
ACS ENVIRONMENTAL & CONSTGeneral Contractor207/08/2026
TRISTAR PLUMBING & HTG INPlumbing107/08/2026
RAYMOND WILSONElectrical103/21/2026
PLUMBING NYC, INCFire Protection107/08/2026
AKAY ELECTRIC CORPORATIONElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAYPOINT CONSULTING GROUP6175404/23/2026
ALAN MARGOLIN & ASSOC4232608/06/2024
KENDALL ENGINEERING PC4154205/01/2024
Building Lifecycle
All (300)Filed (51)Permit Issued (57)Signed Off (19)Violation (48)Inspection (25)Objection (70)Special Inspection (30)
05/20/2026
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/30/2026
Signed off — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-I1
04/29/2026
Signed off — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-S1
04/29/2026
Signed off — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-S2
04/27/2026
Permit issued — Mechanical Systems
M01314009-S2-MS
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alejandro Molina
04/24/2026
Special inspection requirement — Post-installed Anchors
Alejandro Molina
04/24/2026
Special inspection requirement — Final
Alejandro Molina
04/24/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Alejandro Molina
04/24/2026
Special inspection requirement — Interior lighting power
Alejandro Molina
04/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alejandro Molina
04/23/2026
Filed — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-P1
04/20/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Alejandro Molina
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alejandro Molina
04/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alejandro Molina
04/20/2026
Special inspection requirement — Interior lighting power
Alejandro Molina
04/20/2026
Special inspection requirement — Final
Alejandro Molina
04/20/2026
Special inspection requirement — Post-installed Anchors
Alejandro Molina
04/17/2026
Filed — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-S2
04/16/2026
Special inspection requirement — Shutoff dampers
Alejandro Molina
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alejandro Molina
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alejandro Molina
04/16/2026
Special inspection requirement — Ventilation and air distribution system
Alejandro Molina
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alejandro Molina
04/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Alejandro Molina
04/15/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/15/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
Alejandro Molina
03/11/2026
Special inspection requirement — Final
Alejandro Molina
03/11/2026
Special inspection requirement — Mechanical Systems
Alejandro Molina
03/11/2026
Special inspection requirement — Post-installed Anchors
Alejandro Molina
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alejandro Molina
02/13/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/05/2026
Permit issued — Plumbing
M01314009-S1-PL
01/05/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
12/17/2025
Filed — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-S1
12/15/2025
Special inspection requirement — Tenant Protection Plan Compliance
Alejandro Molina
12/03/2025
Permit issued — General Construction
M01314009-I1-GC
11/26/2025
Filed — Alteration
MS-Mechanical work related to Interior renovation of 1st FL Retail Space. Installation of 3 ductless air-handlers, 1 ducted air handler, 1 ERV unit and associated ducts & piping (outdoor units / condensers are existing to remain)
M01314009-I1
11/20/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/18/2024
Signed off — Alteration
Mechanical work for renovation of tenant space Dogtown as shown on plans. Installation of split system HVAC units, energy recovery ventilators, bathroom exhaust fans with all associated duct work and controls serving dry cleaners space
M00907328-I1
10/04/2024
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH NB
M00344003-I1
10/03/2024
Signed off — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH ALT I
M00344466-I1
09/16/2024
Signed off — Alteration
TEMP STANDPIPE FILED IN CONJUNCTION WITH NB
M00344024-I1
09/11/2024
Signed off — Alteration
Structural application file in conjunction with New building application #121207728
M00344012-I1
09/11/2024
Signed off — Alteration
Mechanical application file associate with NB application.
M00343997-I1
09/10/2024
Permit issued — Mechanical Systems
M00907328-S1-MS
08/09/2024
Special inspection requirement — HVAC insulation and sealing
Young Suh
08/09/2024
Special inspection requirement — Energy Code Compliance Inspections
Young Suh
08/09/2024
Special inspection requirement — Post-installed Anchors
Young Suh
08/09/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
08/09/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Young Suh
08/06/2024
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH ALT I
M00344466-P6
08/06/2024
Objection raised — Admin
08/06/2024
Objection resolved — Addressed
08/05/2024
Special inspection requirement — HVAC insulation and sealing
Young Suh
07/23/2024
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS/
M00005317-I1
07/22/2024
Signed off — Alteration
SPRINKLER/STANDPIPE WORK FILED IN CONJUNCTION WITH NB
M00344031-I1
07/17/2024
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH ALT I
M00344466-P5
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offACS ENVIRONMENTAL & CONST04/27/2026
DOB NOWPlumbingSigned-offTRISTAR PLUMBING & HTG IN01/05/2026
DOB NOWGeneral ConstructionSigned-offACS ENVIRONMENTAL & CONST12/03/2025
DOB NOWMechanical SystemsPermit IssuedMETROBUILD LLC09/10/2024
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER12/20/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING11/14/2023
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN11/09/2023
DOB NOWGeneral ConstructionSigned-offMETROBUILD LLC10/31/2023
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER09/29/2023
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER09/19/2023
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER09/19/2023
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER09/19/2023
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER09/19/2023
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN09/05/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/28/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/12/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/06/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING01/25/2023
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN10/05/2022
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER10/01/2022
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER10/01/2022
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER09/30/2022
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER09/30/2022
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER09/30/2022
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN09/19/2022
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN08/31/2022
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER06/29/2022
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING06/20/2022
DOB NOWSprinklersPermit IssuedS & J INDUSTRIAL CORP04/25/2022
DOB NOWStandpipeSigned-offS & J INDUSTRIAL CORP04/25/2022
DOB NOWStandpipePermit IssuedS & J INDUSTRIAL CORP04/25/2022
DOB NOWStandpipeSigned-offS & J INDUSTRIAL CORP04/25/2022
DOB NOWStandpipeSigned-offS & J INDUSTRIAL CORP04/25/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING02/09/2022
DOB NOWStructuralSigned-offTITANIUM CONSTRUCTION SER11/26/2021
DOB NOWMechanical SystemsSigned-offTITANIUM CONSTRUCTION SER11/03/2021
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER10/07/2021
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER10/07/2021
DOB NOWPlumbingSigned-offMARINE PLUMBING & MECH IN10/06/2021
DOB NOWConstruction FenceSigned-offTITANIUM CONSTRUCTION SER06/10/2021
+ 60 more permits on file
1 project · most recent 05/01/2024
Air Conditioning Systems Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/01/2024Permit IssuedMETROBUILD LLCAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Lg ARNU363M2A4 36,000 BTU · Vrf Indoor ×2
ARNU543M3A4 54,000 BTU · Vrf Indoor ×2
Ventilation
Lg ARVU123ZFA2 1,180 CFM · Vrf Indoor ×2
Ducts & Piping
N/A n/a 1 BTU · Ductwork ×2
1 project · most recent 05/09/2022
FiledStatusContractorScope
05/09/2022Permit IssuedS & J INDUSTRIAL CORP1,524 heads, 1,524 outlets
3 projects · most recent 04/23/2026
Water/Sanitary
FiledStatusContractorScope
04/23/2026Signed-offTRISTAR PLUMBING & HTG INWater/Sanitary
05/01/2024——Water/Sanitary
05/09/2022———
13 projects · most recent 12/21/2025
General Wiring
FiledStatusContractorScope
12/21/2025Permit IssuedGEDNEY ELECTRIC, LLCGeneral Wiring
12/01/2024CompleteAKAY ELECTRIC CORPORATIONGeneral Wiring
06/23/2024CompleteV-MAR ELECTRIC LTD.30 meters
06/21/2024CompleteV-MAR ELECTRIC LTD.30 meters
06/21/2024CompleteV-MAR ELECTRIC LTD.30 meters
06/21/2024CompleteV-MAR ELECTRIC LTD.30 meters
06/21/2024CompleteV-MAR ELECTRIC LTD.30 meters
06/10/2024Permit IssuedV-MAR ELECTRIC LTD.General Wiring
05/15/2024CompleteV-MAR ELECTRIC LTD.30 meters
04/04/2024CancelledV-MAR ELECTRIC LTD.30 meters
03/24/2022CompleteSTAR ELEC'L CONTRACTORS C—
02/09/2022CompleteV. VASS ELECTRIC CORP—
01/10/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 25
DateTypeResultReport
05/20/2026Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/13/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/05/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
04/08/2024Pass-Final SD Permit WithdrawalPassView ↗
04/08/2024Pass-Final SP Permit WithdrawalPassView ↗
02/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/13/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/25/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/25/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
08/23/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/26/2023Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/21/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/13/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
01/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
04/24/2026Fire-Resistant Penetrations and JointsAlejandro Molinaspecial
04/24/2026Mastic and Intumescent Fire-resistant CoatingsAlejandro Molinaspecial
04/24/2026Post-installed AnchorsAlejandro Molinaspecial
04/24/2026Interior lighting powerAlejandro Molinaenergy_progress
04/24/2026FinalAlejandro Molinaprogress
04/24/2026Tenant Protection Plan ComplianceAlejandro Molinaspecial
04/20/2026Interior lighting powerAlejandro Molinaenergy_progress
04/20/2026Tenant Protection Plan ComplianceAlejandro Molinaspecial
04/20/2026Mastic and Intumescent Fire-resistant CoatingsAlejandro Molinaspecial
04/20/2026Fire-Resistant Penetrations and JointsAlejandro Molinaspecial
04/20/2026Post-installed AnchorsAlejandro Molinaspecial
04/20/2026FinalAlejandro Molinaprogress
04/16/2026Shutoff dampersAlejandro Molinaenergy_progress
04/16/2026HVAC-R and service water piping design and insulationAlejandro Molinaenergy_progress
04/16/2026Duct leakage testing, insulation and designAlejandro Molinaenergy_progress
04/16/2026Ventilation and air distribution systemAlejandro Molinaenergy_progress
04/16/2026HVAC-R and service water heating equipmentAlejandro Molinaenergy_progress
04/16/2026HVAC-R and service water heating system controlsAlejandro Molinaenergy_progress
03/11/2026FinalAlejandro Molinaprogress
03/11/2026Fire-Resistant Penetrations and JointsAlejandro Molinaspecial
03/11/2026Mechanical SystemsAlejandro Molinaspecial
03/11/2026Post-installed AnchorsAlejandro Molinaspecial
03/11/2026Tenant Protection Plan ComplianceAlejandro Molinaspecial
12/15/2025Tenant Protection Plan ComplianceAlejandro Molinaspecial
08/09/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationYoung Suhspecial
Latest 25 of 150.
▾Documents — 1,052 on file (BIS + DOB NOW)
▸Plans & Drawings59
▸DOB NOWPlans/Sketch20
09/06/2026M00005317-P1Request digital key ↗
09/06/2026M00005317-I1Request digital key ↗
09/02/2026M00675995-P5Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/02/2026M00344003-I1Request digital key ↗
09/02/2026M00344003-P1Request digital key ↗
09/02/2026M00344003-P2Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Standpipe8
09/04/2026M00344024-I1Request digital key ↗
09/02/2026M00344469-I1Request digital key ↗
09/02/2026M00344469-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems7
09/05/2026M00344082-I1Request digital key ↗
09/05/2026M00344082-P1Request digital key ↗
09/05/2026M00344082-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/02/2026M00344469-I1Request digital key ↗
09/02/2026M00344469-P2Request digital key ↗
09/02/2026M00344469-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/04/2026M00344012-I1Request digital key ↗
09/04/2026M00344012-P1Request digital key ↗
09/04/2026M00344463-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00150258-I1Request digital key ↗
09/05/2026M00328138-I1Request digital key ↗
09/04/2026M00402737-I1Request digital key ↗
▸Applications & Permits204
▸BISPLAN / WORK APPROVAL APPLICATION132
04/01/2025140937574Open ↗
01/06/2025141024406Open ↗
08/13/2024121207728Open ↗
Showing 3 of 132 on file for this type
▸BISWORK PERMIT APPLICATION48
04/15/2022121207737Open ↗
04/14/2022121207737Open ↗
04/14/2022121207737Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWLPC Approval/Permit22
09/05/2026M00344082-P2Open ↗
09/05/2026M00344082-P1Open ↗
09/04/2026M00343997-I1Open ↗
Showing 3 of 22 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
12/28/2021140937574Open ↗
Showing 1 of 2 on file for this type
▸Zoning, Tax Lot & Property Records21
▸BISZONING DIAGRAM5
05/25/2022121207728Open ↗
01/12/2022121207737Open ↗
Showing 2 of 5 on file for this type
▸BISZONING RESOLUTION DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISZONING EXHIBIT I: CERTIFICATION4
12/14/2023121253847Open ↗
Showing 1 of 4 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT3
12/14/2023121253847Open ↗
Showing 1 of 3 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED2
08/13/2024121207728Open ↗
12/14/2023121253847Open ↗
▸BISFLOOD ZONE COMPLIANCE2
04/10/2024121207728Open ↗
01/07/2022121207737Open ↗
▸Seals & Professional Certifications238
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION64
03/31/2021121207728Open ↗
03/31/2021121207728Open ↗
03/31/2021121207728Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature53
09/05/2026M00328138-I1Open ↗
09/05/2026M00344082-P1Open ↗
09/05/2026M00344082-I1Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWProgress Inspector Seal & Signature42
09/01/2026M01314009-P1Open ↗
09/01/2026M01314009-P1Open ↗
08/31/2026M01314009-S2Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature39
09/01/2026M01314009-P1Open ↗
09/01/2026M01314009-P1Open ↗
08/31/2026M01314009-S2Open ↗
Showing 3 of 39 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT11
08/21/2023141024406Open ↗
01/26/2022141007112Open ↗
Showing 2 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/21/2023141024406Open ↗
01/26/2022141007112Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/21/2023141024406Open ↗
01/26/2022141007112Open ↗
Showing 2 of 3 on file for this type
▸Trade Schedules & Equipment15
▸BISSCHEDULE B - PLUMBING8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Safety & Tenant Protection51
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist29
09/05/2026M00344082-P1Open ↗
09/05/2026M00344082-P2Open ↗
09/04/2026M00343997-I1Open ↗
Showing 3 of 29 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST12
01/12/2022121207737Open ↗
Showing 1 of 12 on file for this type
▸BISSTREET TREE CHECKLIST7
06/03/2025140937574Open ↗
Showing 1 of 7 on file for this type
▸BISTenant Protection Plan and Notes3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
09/05/2026M00344082-I1Open ↗
09/04/2026M00344463-I1Open ↗
Showing 2 of 3 on file for this type
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
04/22/2021121207728Open ↗
Showing 1 of 5 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRIC MOTORS1
03/19/2024121207728Open ↗
▸Inspections & Test Reports55
▸BISTECHNICAL REPORT: RESPONSIBILITY32
12/08/2023121207728Open ↗
12/08/2023121207728Open ↗
05/10/2023121207728Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
03/31/2021121207728Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
05/25/2021121207728Open ↗
03/31/2021121207728Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/10/2023121207737Open ↗
03/31/2021121207728Open ↗
▸BISDEEP FOUNDATIONS / PILES2
03/18/2024121207728Open ↗
01/18/2022121207737Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
02/02/2022121207728Open ↗
01/12/2022121207737Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
03/19/2024121207728Open ↗
01/18/2022121207737Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT2
03/28/2024121207728Open ↗
03/08/2024121207737Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
03/19/2024121207728Open ↗
01/18/2022121207737Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs108
▸BISSCHEDULE A - OCCUPANCY / USE35
07/10/2024121207728Open ↗
07/01/2024121207728Open ↗
06/27/2024121207728Open ↗
Showing 3 of 35 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISLANDMARKS APPROVAL15
05/03/2021121207737Open ↗
Showing 1 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
12/02/2021123675148Open ↗
Showing 1 of 14 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSHED LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLANDMARKS SIGNOFF2
09/24/2021122993449Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership37
▸BISCOST AFFIDAVIT31
08/21/2023141024406Open ↗
12/01/2021123675148Open ↗
11/23/2021122993449Open ↗
Showing 3 of 31 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE4
04/14/2022121207737Open ↗
01/19/2022121207737Open ↗
05/19/2021121207728Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
04/14/2022121207737Open ↗
05/20/2021121207728Open ↗
▸Filing & Intake Forms102
▸BISADDITIONAL INFORMATION38
06/03/2025140937574Open ↗
07/15/2022121207737Open ↗
06/15/2022121207737Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISBOROUGH INTAKE FORM21
06/17/2024103546682Open ↗
04/14/2022121207737Open ↗
03/16/2022121207737Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
08/21/2023141024406Open ↗
01/26/2022141007112Open ↗
Showing 2 of 9 on file for this type
▸Other Documents71
▸DOB NOWFlood Plan Emergency Temporary Flood Shields33
09/04/2026M00343997-P2Open ↗
09/04/2026M00343997-I1Open ↗
09/04/2026M00343997-P1Open ↗
Showing 3 of 33 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
12/14/2023121253847Open ↗
01/12/2022121207737Open ↗
Showing 2 of 11 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)8
09/04/2026M00343997-I1Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWLowest Floor Elevation Plan7
09/04/2026M00343997-I1Open ↗
09/04/2026M00344012-I1Open ↗
09/02/2026M00344469-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPLOT DIAGRAM5
09/19/2023121207728Open ↗
Showing 1 of 5 on file for this type
▸BISBEST SQUAD - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLOWEST FLOOR ELEVATION2
03/19/2024121207728Open ↗
01/19/2022121207737Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/19/2024121207728Open ↗