← Back
Five to six families
150 BAY 22 STREET
BROOKLYN · Bath Beach · BIN 3167814
💬 Discuss this project
1925Year Built
2Stories
C2Building Class
R5Zoning
3,600 sfGross Floor Area
6Units
Rent Stabilized184 Open Violations 179 unresolved · 5 paperwork only ▸FDNY Report ↗
Five to six families · Owner of record: BAY 22 STREET GROUP LLC · 4,830 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
Architecture
Floor 32p · 1 filing · 4 docs
Floor 2
Floor 1
Cellar2p · 2 filings · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HPD807/08/2026
BAY 22 STREET GROUP LLC703/22/2026
150 BAY 22ND503/22/2026
YACHT LLC503/22/2026
HKS CONSTRUCTION203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2023$1.1M—YACHT LLC → BAY 22 STREET GROUP LLC$319/sf building
03/03/2020$1.3M—— → —$361/sf building
12/22/2017$1.2M—150 BAY 22ND LLC → 971 REALTY , LLC$347/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CONSTRCTN. MGNT. & SFTY. CON., INC.106/23/2026
NY BUILDING ASSOCIATES INC205/22/2024
AGE ENGINEERING, LLC101/09/2024
SYED ENGINEERING, P.C.112/12/2023
BASIC GROUPS CORP111/16/2023
LIGHT HOUSE111/08/2022
ALBERTO ROMAN103/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SERVICE CORP203/21/2026
BASIC GROUPS403/21/2026
HIGHQUALITY CONSTRUCTION VNW403/21/2026
ABC PERMIT EXPEDITING203/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
SERVICE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.N. CONSTRUCTION INCGeneral Contractor403/21/2026
HONEY CONSTRUCTION NY INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AGE ENGINEERING, LLC6695101/09/2024
LIGHTHOUSE5538111/08/2022
AR-TECH ENGINEERING, P.C.6659103/14/2022
Building Lifecycle
All (114)Filed (9)Permit Issued (3)Signed Off (2)Violation (60)Objection (33)Special Inspection (7)
07/21/2026
Objection resolved — Open
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/16/2026
Objection resolved — Addressed
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/09/2026
Objection raised — Scope
07/09/2026
Objection raised — Admin
07/09/2026
Objection raised — Scope
07/08/2026
Objection raised — Cost
07/08/2026
Objection raised — Scope
07/08/2026
Objection raised — Inspections
07/08/2026
Objection raised — Fire_Protection
07/08/2026
Objection raised — Energy
06/23/2026
Filed — Alteration
INTERIOR RENOVATION AT 1ST, 2ND & 3RD FLOOR. NO CHANGE IN USE, EGRESS, OCCUPANCY & BULK.
B01421169-I1
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/06/2025
Violation issued (HPD, open)
A
06/03/2025
Violation issued (ECB, closed)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
06/03/2025
Violation issued (ECB, open)
Construction
02/11/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/11/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/26/2024
Violation issued (HPD, open)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/04/2024
Objection raised — Admin
05/22/2024
Filed — Full Demolition
HEREWITH FILING FOR FULL DEMOLITION OF EXISTING CELLAR AND THEER-STORY BUILDING.
B01054927-I1
05/21/2024
Special inspection requirement — Demolition
05/21/2024
Special inspection requirement — Structural Stability – Alterations of existing Buildings
04/24/2024
Signed off — Alteration
PROVIDE TEMPORARY SHORING TO STABILIZE BUILDING, COPLY WITH DOB VIOLATION # 111323IMEGNCY17952. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
B00972033-I1
04/09/2024
Permit issued — Structural
B00972033-I1-GC-CX
04/08/2024
Violation issued (HPD, open)
A
03/27/2024
Objection resolved — Addressed
03/27/2024
Objection resolved — Addressed
02/20/2024
Filed — Full Demolition
B00991807-I1
01/23/2024
Objection resolved — Addressed
01/23/2024
Objection resolved — Addressed
01/12/2024
Objection raised — Scope
01/12/2024
Objection raised — Structural
01/12/2024
Objection raised — Structural
01/12/2024
Objection raised — Admin
01/09/2024
Filed — Alteration
PROVIDE TEMPORARY SHORING TO STABILIZE BUILDING, COPLY WITH DOB VIOLATION # 111323IMEGNCY17952. NO CHANGES TO USES, EGRESS OR OCCUPANCY.
B00972033-I1
01/02/2024
Permit issued — Construction Fence
B00964947-I1-FN
12/28/2023
Objection raised — Admin
12/26/2023
Filed — Full Demolition
HAND DEMOLITION OF EXISTING 3 STORY RESIDENTIAL BUILDING.
B00980834-I1
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection resolved — Addressed
12/14/2023
Objection raised — Other
12/14/2023
Objection raised — Other
12/12/2023
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00964947-I1
12/05/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBESPIERRE ARISTILDE
12/05/2023
Special inspection requirement — Final
ROBESPIERRE ARISTILDE
11/29/2023
Objection raised — Structural
11/21/2023
Objection raised — Structural
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offHONEY CONSTRUCTION NY INC04/09/2024
DOB NOWConstruction FencePermit IssuedEMPIRE CONSTRUCTION ASSOC01/02/2024
DOB NOWGeneral ConstructionSigned-offEMPIRE CONSTRUCTION ASSOC01/16/2023
BISEQISSUEDHKS CONSTRUCTION CORP12/18/2017
BISEQISSUEDHKS CONSTRUCTION CORP12/19/2016
BISPLISSUEDKOMFORT PLUMB. AND HTG.03/17/1992
BISBLISSUEDKOMFORT PLUMB. AND HTG.03/17/1992
2 projects · most recent 12/12/2023
Fence
FiledStatusContractorScope
12/12/2023Permit IssuedG.N. CONSTRUCTION INCFence
11/16/2023——Fence
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/16/2026Fire-Resistant Penetrations and Joints—special
07/16/2026Fire-Resistance Rated Construction—progress
05/21/2024Demolition—special
05/21/2024Structural Stability – Alterations of existing Buildings—special
12/05/2023Structural Stability – Alterations of existing buildingsROBESPIERRE ARISTILDEspecial
12/05/2023FinalROBESPIERRE ARISTILDEprogress
03/04/2022Structural Stability – Alterations of existing buildingsALBERTO ROMANspecial
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/31/2026B00692182-I1Request digital key ↗
08/28/2026B00706178-I1Request digital key ↗
08/26/2026B00963274-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
09/20/2018321501200Open ↗
09/06/2017321501200Open ↗
12/15/2016340455117Open ↗
▸BISWORK PERMIT APPLICATION2
12/22/2017340455117Open ↗
12/15/2016340455117Open ↗
▸Seals & Professional Certifications14
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/28/2026B00706178-I1Open ↗
08/26/2026B00972033-I1Open ↗
08/25/2026B00991807-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/23/2026B00972033-I1Open ↗
08/23/2026B00692182-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
12/15/2016340455117Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/15/2016340455117Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
09/27/2018340455117Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
12/15/2016340455117Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/23/2026B00972033-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/26/2026B00972033-I1Open ↗
08/15/2026B01421169-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/28/2026B00706178-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/15/2016340455117Open ↗
▸Approvals, Objections & Sign-offs3
▸BISSHED LETTER2
09/27/2018340455117Open ↗
12/22/2017340455117Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
09/27/2018340455117Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM3
09/27/2018340455117Open ↗
09/20/2018321501200Open ↗
09/06/2017321501200Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/15/2016340455117Open ↗
▸BISEFILING COVER SHEET1
12/27/2016321501200Open ↗
▸Other Documents12
▸DOB NOWHPD4: CONH Pilot Program7
08/15/2026B01421169-I1Open ↗
08/13/2026B00980834-I1Open ↗
08/13/2026B00964947-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification2
08/25/2026B00991807-I1Open ↗
08/13/2026B00980834-I1Open ↗
▸DOB NOWStructure Photographs2
08/13/2026B00991807-I1Open ↗
08/13/2026B00980834-I1Open ↗
▸DOB NOWDHCR Document1
08/13/2026B00972033-I1Open ↗