← Back
BuildNYC
Three families
150 BAY 38 STREET
BROOKLYN · BIN 3186110
💬 Discuss this project
1927Year Built
2Stories
C0Building Class
R5Zoning
2,400 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Three families · 2,320 sf lot · 1.03 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Plumbing work for 3-family building5p · 1 filing · 9 docs
Floor 1Plumbing work for 3-family building5p · 1 filing · 9 docs
CellarPlumbing work for 3-family building5p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2023$1.5M—— → —$608/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Madriaga Engineering208/22/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NY Building AssociatesGeneral Contractor107/08/2026
American Standard P&H CororpPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827208/22/2023
Building Lifecycle
All (27)Filed (2)Permit Issued (2)Signed Off (2)Violation (14)Inspection (4)Special Inspection (3)
06/06/2025
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
A
03/29/2024
Signed off — Alteration
FILE CONSTRUCTION WORK OF 3-FAMILY BUILDING TO REMOVE PARTITIONS,DOOR, NEW FLOORING TILES, DOORS, PARTITION, WINDOW, PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00918661-I1
03/29/2024
Signed off — Alteration
FILE CONSTRUCTION WORK OF 3-FAMILY BUILDING TO REMOVE PARTITIONS,DOOR, NEW FLOORING TILES, DOORS, PARTITION, WINDOW, PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00918661-S1
03/15/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/14/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/23/2023
Permit issued — Plumbing
B00918661-S1-PL
08/23/2023
Permit issued — General Construction
B00918661-I1-GC
08/22/2023
Filed — Alteration
FILE CONSTRUCTION WORK OF 3-FAMILY BUILDING TO REMOVE PARTITIONS,DOOR, NEW FLOORING TILES, DOORS, PARTITION, WINDOW, PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00918661-I1
08/22/2023
Filed — Alteration
FILE CONSTRUCTION WORK OF 3-FAMILY BUILDING TO REMOVE PARTITIONS,DOOR, NEW FLOORING TILES, DOORS, PARTITION, WINDOW, PAINTING WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00918661-S1
08/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jonar Madriaga
08/15/2023
Special inspection requirement — Energy Code Compliance Inspections
Jonar Madriaga
08/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Jonar Madriaga
03/21/2023
Violation issued (HPD, closed)
A
11/09/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
I
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
10/29/2019
Violation issued (HPD, closed)
I
10/16/2018
Violation issued (HPD, closed)
I
11/20/2017
Violation issued (HPD, closed)
I
11/03/2016
Violation issued (HPD, closed)
I
10/07/2015
Violation issued (HPD, closed)
I
02/17/2015
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAmerican Standard P&H Cororp08/23/2023
DOB NOWGeneral ConstructionSigned-offNY Building Associates08/23/2023
1 project · most recent 07/27/2023
General Wiring
FiledStatusContractorScope
07/27/2023CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/15/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
08/15/2023Fire-Resistant Penetrations and JointsJonar Madriagaspecial
08/15/2023Energy Code Compliance InspectionsJonar Madriagaprogress
08/15/2023HVAC-R and service water piping design and insulationJonar Madriagaenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026B00918661-S1Request digital key ↗
08/26/2026B00918661-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026B00918661-S1Open ↗
08/26/2026B00918661-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026B00918661-S1Open ↗
08/26/2026B00918661-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B00918661-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026B00918661-S1Open ↗
08/26/2026B00918661-I1Open ↗