Elevator apt, semi-fireproof without stores
150 EAST 121ST STREET
MANHATTAN · BIN 1054378
💬 Discuss this project
1984Year Built
8Stories
D1Building Class
R7DZoning
117,118 sfGross Floor Area
125Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: Casabe II Housing Development Fund Comp Any · 29,265 sf lot · 4 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1 filing
RoofCasabe II HDFC INC2p · 2 filings · 14 docs
PenthouseVERIZON site installation on roof1 filing
Floor 1Heavy duty sidewalk shed installation1 filing
Sub-BasementVERIZON site installation on roof1 filing
Site & exteriorTemporary pipe scaffold installation1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Casabe II HDFC4110/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
French & Parrello Associates210/12/2026
Pacifico Engineering307/31/2026
Mje Professional Services211/04/2025
Danois Architects308/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR Expediting Design403/21/2026
BMB Building Consulting603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Conrock ConstructionGeneral Contractor906/27/2026
Norway ElectricElectrical203/21/2026
Reliable EnterprisesScaffold204/09/2026
Best Energy Power 2015General Contractor104/09/2026
Zerega ContractingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Pacifico Engineering3157307/31/2026
McHenery Testing Lab9181107/21/2025
American Construction Tes9731308/13/2024
Building Lifecycle
All (129)Filed (10)Permit Issued (11)Signed Off (4)Facade (FISP) (12)Violation (60)Inspection (2)Special Inspection (30)
10/12/2026
Filed — Alteration
Installation of new VERIZON site on the roof. Install 4 sectors (15 antennas) with associated parts, 8 RRH units, 4 GPS antennas and 3 equipment cabinets in penthouse. Related conduits on exterior and service connection in the basement.
M01362747-S1
10/12/2026
Filed — Alteration
Installation of new VERIZON site on the roof. Install 4 sectors (15 antennas) with associated parts, 8 RRH units, 4 GPS antennas and 3 equipment cabinets in penthouse. Related conduits on exterior and service connection in the basement.
M01362747-I1
09/30/2026
Special inspection requirement — Mechanical Systems
09/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/30/2026
Special inspection requirement — Final
Peter Tardy
09/18/2026
Signed off — Alteration
Installation of pv solar system on roof. No change of use, egress, or occupancy.
M01378390-I1
08/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
08/04/2026
Special inspection requirement — Post-installed Anchors
Ralph Pacifico
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
08/04/2026
Special inspection requirement — Final
Ralph Pacifico
08/04/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
07/31/2026
Filed — Alteration
Installation of pv solar system on roof. No change of use, egress, or occupancy.
M01378390-P1
07/24/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
07/24/2026
Special inspection requirement — Post-installed Anchors
Ralph Pacifico
07/24/2026
Special inspection requirement — Final
Ralph Pacifico
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
07/02/2026
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01038316-I1
06/05/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01245154-I1
06/05/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01308264-I1
04/15/2026
Permit issued — Mechanical Systems
M01038316-S4-MS
03/31/2026
Permit issued — Solar
M01378390-I1-SL
03/26/2026
Filed — Alteration
Installation of pv solar system on roof. No change of use, egress, or occupancy.
M01378390-I1
02/27/2026
Special inspection requirement — Air barrier - visual inspection
Ralph Pacifico
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Ralph Pacifico
01/21/2026
Special inspection requirement — Final
Ralph Pacifico
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ralph Pacifico
12/03/2025
Permit issued — Suspended Scaffold
M01258857-I1-SC
11/22/2025
Violation issued (ECB, closed)
Construction
11/22/2025
Violation issued (ECB, closed)
Construction
11/06/2025
Permit issued — Supported Scaffold
M01308264-I1-SF
11/04/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01308264-I1
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/19/2025
Permit issued — General Construction
M01038316-I1-GC
08/06/2025
Permit issued — Suspended Scaffold
M01258857-I1-SC
07/21/2025
Filed — Alteration
installation of outrigger for facade repair.
M01258857-I1
07/03/2025
Permit issued — Mechanical Systems
M01038316-S4-MS
06/24/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01245154-I1
06/24/2025
Permit issued — Sidewalk Shed
M01245154-I1-SH
06/04/2025
Violation issued (HPD, closed)
A
03/05/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2024
Permit issued — Plumbing
M01038316-S2-PL
09/18/2024
Permit issued — General Construction
M01038316-I1-GC
08/22/2024
Permit issued — General Construction
M01038316-I1-GC
08/13/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01038316-S4
08/13/2024
Special inspection requirement — HVAC-R and service water heating equipment
Kenneth Wille
08/13/2024
Special inspection requirement — HVAC-R and service water heating system controls
Kenneth Wille
08/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Kenneth Wille
08/08/2024
Special inspection requirement — Shutoff dampers
Kenneth Wille
08/08/2024
Special inspection requirement — Energy Code Compliance Inspections
Kenneth Wille
08/08/2024
Special inspection requirement — Mechanical Systems
EDWIN HOPKINS
08/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
EDWIN HOPKINS
08/08/2024
Special inspection requirement — Final
EDWIN HOPKINS
08/07/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01038316-S2
05/16/2024
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION TO GENERAL CONSTRUCTION WORKS. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
M01038316-I1
05/16/2024
Special inspection requirement — Air barrier - visual inspection
Kenneth Wille
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offConrock Construction04/15/2026
DOB NOWSolarSigned-offBest Energy Power 201503/31/2026
DOB NOWSuspended ScaffoldPermit IssuedVikram Construction12/03/2025
DOB NOWSupported ScaffoldSigned-offReliable Enterprises11/06/2025
DOB NOWGeneral ConstructionSigned-offConrock Construction09/19/2025
DOB NOWSuspended ScaffoldPermit IssuedVikram Construction08/06/2025
DOB NOWMechanical SystemsSigned-offConrock Construction07/03/2025
DOB NOWSidewalk ShedSigned-offReliable Enterprises06/24/2025
DOB NOWPlumbingSigned-offZerega Contracting10/17/2024
DOB NOWGeneral ConstructionSigned-offConrock Construction09/18/2024
DOB NOWGeneral ConstructionSigned-offConrock Construction08/22/2024
BISPLISSUEDEnterprise Plumbing & Heating06/19/2009
BISOTISSUEDBuild Tech Construction04/23/2009
BISSPISSUEDAmerican Standard Plumbing12/11/2008
BISSDISSUEDAmerican Standard P&H Cororp12/01/2008
BISPLISSUEDAmerican Standard P&H Cororp01/22/2008
BISMHISSUEDArtec Construction & Development01/10/2008
BISOTISSUEDArtec Construction & Development01/07/2008
BISBLISSUEDAmerican Standard P&H Cororp09/26/2007
BISSPISSUEDAmerican Standard Plumbing09/10/2007
BISEQISSUEDRockledge Scaffold04/18/2007
BISPLISSUEDPrime Piping & Heating05/15/1998
BISOTISSUEDYates Group03/03/1994
BISOTISSUEDYates Group12/10/1993
1 project · most recent 10/12/2026
Heating and Air Conditioning Systems
FiledStatusContractorScope
10/12/2026——Heating and Air Conditioning Systems
1 project · most recent 08/13/2024
Water/Sanitary
FiledStatusContractorScope
08/13/2024Signed-offZerega ContractingWater/Sanitary
4 projects · most recent 05/31/2026
General Wiring
FiledStatusContractorScope
05/31/2026CompleteBerger Quality Electrical Con—
06/25/2025Pending PaymentRichard Neu—
05/12/2023CompleteLaura Electrical LightingGeneral Wiring
05/19/2020CompleteLeone Electric CoGeneral Wiring
2 projects · most recent 07/31/2026
FiledStatusContractorScope
07/31/2026Signed-offBest Energy Power 2015696 panels, 302.72 kw, 12,994 roof_area_sqft
———352 panels, 151.36 kw, 12,994 roof_area_sqft
2 projects · most recent 11/04/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
11/04/2025Signed-offReliable EnterprisesScaffold
06/24/2025Signed-offReliable EnterprisesSidewalk Shed
1 project · most recent 07/21/2025
Suspended Scaffold
FiledStatusContractorScope
07/21/2025Permit IssuedVikram ConstructionSuspended Scaffold
1 project · most recent 07/21/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/21/2025Permit IssuedVikram ConstructionSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
09/30/2026Mechanical Systems—special
09/30/2026Tenant Protection Plan Compliance—special
09/30/2026FinalPeter Tardyprogress
08/04/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
08/04/2026Post-installed AnchorsRalph Pacificospecial
08/04/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
08/04/2026Energy Code Compliance InspectionsRalph Pacificoprogress
08/04/2026FinalRalph Pacificoprogress
08/04/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
07/24/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
07/24/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
07/24/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
07/24/2026Post-installed AnchorsRalph Pacificospecial
07/24/2026FinalRalph Pacificoprogress
07/24/2026Energy Code Compliance InspectionsRalph Pacificoprogress
02/27/2026Air barrier - visual inspectionRalph Pacificoenergy_progress
01/21/2026Energy Code Compliance InspectionsRalph Pacificoprogress
01/21/2026FinalRalph Pacificoprogress
01/21/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
01/21/2026Fire-Resistant Penetrations and JointsRalph Pacificospecial
08/13/2024HVAC-R and service water heating equipmentKenneth Willeenergy_progress
08/13/2024HVAC-R and service water heating system controlsKenneth Willeenergy_progress
08/13/2024HVAC-R and service water piping design and insulationKenneth Willeenergy_progress
08/08/2024Shutoff dampersKenneth Willeenergy_progress
08/08/2024Energy Code Compliance InspectionsKenneth Willeprogress
Latest 25 of 35.
▾Documents — 98 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
10/13/2026M01362747-I1Request digital key ↗
10/13/2026M01362747-S1Request digital key ↗
09/06/2026M01378390-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits12
▸BISWORK PERMIT APPLICATION5
06/22/2009120077237Open ↗
04/23/2009120077237Open ↗
12/11/2008110388429Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
04/13/2009120077237Open ↗
03/26/2009120077237Open ↗
11/13/2008110388429Open ↗
Showing 3 of 4 on file for this type
▸BISPLACE OF ASSEMBLY3
05/21/2010120240603Open ↗
05/20/2010120240603Open ↗
02/25/2010120240603Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature13
10/13/2026M01362747-S1Open ↗
09/02/2026M01378390-P1Open ↗
09/02/2026M01378390-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
10/13/2026M01362747-I1Open ↗
10/13/2026M01362747-S1Open ↗
09/06/2026M01378390-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026M01378390-P1Open ↗
09/02/2026M01378390-P1Open ↗
09/01/2026M01038316-S4Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
02/25/2010120240603Open ↗
11/13/2008110388429Open ↗
05/27/2008110177344Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/25/2010120240603Open ↗
03/26/2009120077237Open ↗
05/27/2008110177344Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
02/25/2010120240603Open ↗
03/26/2009120077237Open ↗
05/27/2008110177344Open ↗
▸BISPC FULL REPORT1
11/20/2007110022528Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
03/26/2009120077237Open ↗
11/13/2008110388429Open ↗
05/27/2008110177344Open ↗
▸BISSELF-CERT PLUMBING NOTICE2
08/24/2009120077237Open ↗
07/15/2009120077237Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
08/05/2009110022528Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
09/06/2026M01378390-I1Open ↗
09/06/2026M01378390-P1Open ↗
08/26/2026M01038316-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
02/25/2010120240603Open ↗
03/26/2009120077237Open ↗
11/13/2008110388429Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
11/20/2007110022528Open ↗
▸Approvals, Objections & Sign-offs12
▸BISADMINISTRATIVE OBJECTIONS5
02/25/2010120240603Open ↗
04/08/2009120077237Open ↗
11/13/2008110388429Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/26/2026M01038316-S4Open ↗
08/26/2026M01038316-S2Open ↗
08/26/2026M01038316-I1Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/05/2009110022528Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/05/2009110022528Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
08/05/2009110022528Open ↗
03/26/2009120077237Open ↗
11/13/2008110388429Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISeFiling Job Application Cover Sheet1
05/27/2008110177344Open ↗
▸BISEFILING COVER SHEET1
11/13/2008110388429Open ↗
▸Other Documents2
▸DOB NOWCalculations1
08/13/2026M01258857-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01258857-I1Open ↗