Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHAB Bank, Bank-a186p · 14 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 6 drawing sheets
Latest 3 of 14 filings on this floor.
BulkheadHAB Bank16p · 6 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 5 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 4 drawing sheets
In-fill of existing stair openings, installation of new stair openings, installation of new LULA elevator; In conjunction with Alt 1 M00548169.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 7HAB Bank, Bank-a181p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 5 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 6 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 6HAB Bank, Bank-a175p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 3 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 5HAB Bank, Bank-a179p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 4 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 4HAB Bank, Bank-a182p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 7 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 3HAB Bank, Bank-a178p · 12 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 3 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 4 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 2HAB Bank, Bank-a183p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 5 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 1HAB Bank, Bank-a185p · 14 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sidewalk Shed · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 4 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 3 drawing sheets
Latest 3 of 14 filings on this floor.
CellarHAB Bank150p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Foundation · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Sprinkler (SP): Modification to existing Sprinkler system as per plans filed herewith. Standpipe (SD): Modification to existing standpipe system as per plans filed herewith.
On file for this project
25 documents · 1 drawing sheet
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 3 drawing sheets
ALTERATION ANDRENOVATION OF THE DESIGNATED PREMISES, INCLUDING ALL LABOR, MATERIALS, EQUIPMENT, SCAFFOLDING AND OTHERFACILITIES AND SERVICES NECESSARY FOR THE PROPER AND COMPLETE EXECUTION OF THE WORK
On file for this project
27 documents · 6 drawing sheets
Latest 3 of 10 filings on this floor.
BasementBank-a2p · 2 filings · 9 docs
MechanicalPlumbing
Minor demolition to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
Minor demolition to Plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 1 drawing sheet
Sub-BasementBank-a1p · 2 filings · 9 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Minor demolition to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents
Minor demolition to Plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents
Site & exteriorHAB Bank72p · 6 filings · 20 docs
ArchitectureCivilElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed · Sign · Supported Scaffold
Erect non illuminated pin mounted letters on existing awning. No change of use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
12 documents · 12 drawing sheets
INSTALLATION OF CONSTRUCTION FENCE WITH BARRIERS AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014. NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
16 documents · 12 drawing sheets
Latest 3 of 6 filings on this floor.