← Back
BuildNYC
Elevator cooperative
We Care Media Arts
150 EAST 73RD STREET · BIN 1042858
💬 Discuss this project
1923Year Built
11Stories
D4Building Class
C1-8XZoning
97,328 sfGross Floor Area
45Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 150 E 73 St Corp- B.H.S. (15073) · 12,092 sf lot · 8.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof150 East 73rd Penthouse Framing and Demolition4p · 3 filings · 20 docs
PenthouseUnit PHA25p · 3 filings · 20 docs
Floor 12150 East 73rd Penthouse Framing and Demolition6p · 3 filings · 20 docs
Floor 11
Floor 10Unit 10A1 filing · 5 docs
Floor 9Unit 9A6p · 2 filings · 19 docs
Floor 8Unit 8B, Unit 8D36p · 6 filings · 20 docs
Floor 7
Floor 6Unit 6B2p · 1 filing · 5 docs
Floor 5Unit 5A, Unit 5BUnder Construction19p · 3 filings · 20 docs
Floor 4Unit 4B11p · 3 filings · 20 docs
Floor 3Demolition and concrete slab work for residence14p · 1 filing · 20 docs
Floor 2Unit 2B3p · 2 filings · 20 docs
Floor 1Installation of sidewalk shed2p · 2 filings · 10 docs
Site & exteriorCentral Const Management38p · 7 filings · 20 docs
Filed — no permit issuedFence installation1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
150 East 73rd Street2103/21/2026
150 E 73 St803/22/2026
York Towers503/22/2026
Unit Owners403/21/2026
150 East 7303/21/2026
Brown, Harris, Stevens203/21/2026
One Fifty East 73rd Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Idm Associates1203/21/2026
Quick Filing of NY103/21/2026
JM Zoning1403/21/2026
Green Light Expediting603/21/2026
HS Design Studio203/21/2026
Lewsan Consulting403/21/2026
HH Building Consulting & Architectu403/21/2026
Anthony Potestio503/21/2026
Resolution Expediting603/21/2026
C6203/21/2026
Agouti Construction Consulting203/21/2026
CH Building Consultants803/21/2026
Outsource Consultants803/21/2026
Patuxent Engineering203/21/2026
Big Orange Expediting203/21/2026
Quick Filing103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S. DonadicGeneral Contractor1407/08/2026
Central Construction ManagementScaffold1007/08/2026
Andamio ScaffoldingScaffold603/21/2026
Tauland Kitchen & BathGeneral Contractor507/08/2026
Pam Air Conditioningspecialty_contractor403/21/2026
Intersystem InstallationScaffold407/08/2026
Gallery Restorationspecialty_contractor408/16/2026
P K RemodelingGeneral Contractor303/21/2026
Everest ScaffoldingScaffold307/08/2026
Cortlandt ContractingGeneral Contractor307/08/2026
Donato PlumbingPlumbing207/08/2026
EH Plumbing & HeatingPlumbing207/08/2026
DMC Professional ContractorsGeneral Contractor203/21/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
BT's Plumbing and HeatingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Master Tech PlumbingPlumbing107/08/2026
Urban MechanicalPlumbing107/08/2026
Judd ElectricElectrical103/21/2026
Z.W. Plumbing & HeatingPlumbing107/08/2026
Conductor Electrical ServicesElectrical103/22/2026
Amko Electric Construction & Maintenance IElectrical103/21/2026
K & G Electric CoElectrical103/21/2026
Tuxedo Electrical ContractingElectrical103/21/2026
R.j.electrical ContractorElectrical103/21/2026
WMS Electrical ContngElectrical103/22/2026
HiicompanyGeneral Contractor107/08/2026
H.I.IGeneral Contractor107/08/2026
Jestcor ContractingGeneral Contractor107/08/2026
Wojtas' Contracting CompanyGeneral Contractor107/08/2026
A.M.NPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369307/27/2026
Ammor Architecture3054409/26/2024
RHL Engineering712105/31/2024
Michael Patino Architectu8170103/19/2024
CMSC6098212/11/2023
EC Special Inspections8355211/13/2023
O'Rourke Engineering5873307/21/2023
Rad Design & Architecture2082110/31/2022
Crosscheck Inspection Services544503/25/2022
Arct Architecture3329412/01/2021
Old Structures Engineering256108/02/2021
Geiger Engineering689103/02/2021
Outsource Special Inspection2827102/25/2021
Building Lifecycle
All (286)Filed (52)Permit Issued (50)Signed Off (29)Facade (FISP) (12)Violation (54)Inspection (29)Objection (30)Special Inspection (30)
09/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/14/2026
Permit issued — Mechanical Systems
M01372348-I1-MS
08/13/2026
Permit issued — Mechanical Systems
M01372348-I1-GC
07/27/2026
Filed — Alteration
INTERIOR RENOVATION, NEW THROUGH WALL AC UNIT OPENING IN APT. #5A. NO CHANGEOF USE, EGRESS OR OCCUPANCY.
M01372348-P1
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Luis Pichardo
07/13/2026
Permit issued — General Construction
M01372348-I1-GC
07/13/2026
Permit issued — Mechanical Systems
M01372348-I1-MS
06/12/2026
Permit issued — Plumbing
M01372348-S1-PL
04/25/2026
Objection raised — Cost
04/25/2026
Objection resolved — Resolved
04/25/2026
Objection raised — Scope
04/25/2026
Objection resolved — Resolved
04/14/2026
Filed — Alteration
INTERIOR RENOVATION, NEW THROUGH WALL AC UNIT OPENING IN APT. #5A. NO CHANGEOF USE, EGRESS OR OCCUPANCY.
M01372348-S1
04/14/2026
Objection raised — Scope
04/14/2026
Objection resolved — Resolved
04/06/2026
Filed — Alteration
INTERIOR RENOVATION, NEW THROUGH WALL AC UNIT OPENING IN APT. #5A. NO CHANGEOF USE, EGRESS OR OCCUPANCY.
M01372348-I1
03/19/2026
Special inspection requirement — Lighting in dwelling units
Luis Pichardo
03/16/2026
Special inspection requirement — Final
RONALD VILLANO
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Luis Pichardo
03/16/2026
Special inspection requirement — Mechanical Systems
Luis Pichardo
03/16/2026
Special inspection requirement — Post-installed Anchors
Luis Pichardo
12/17/2025
Signed off — Alteration
M01100146-I1
11/06/2025
Signed off — Alteration
Minor interior renovation of existing apartment 8D. Work is mainly replacing 2 bathrooms, 1 kitchen and the addition of a powder room.
M00754849-I1
11/06/2025
Signed off — Alteration
Minor mechanical venting. No change in use egress or occupancy.
M00754855-I1
11/06/2025
Signed off — Alteration
Minor relocation of non load bearing partitions. Replace two bathrooms and one kitchen. Minor mechanical venting. Add a power room. No change in use egress or occupancy.
M00753447-I1
09/15/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/14/2025
Signed off — Alteration
Plumbing work file in conjunction with apartment renovation.
M01006524-S1
03/14/2025
Signed off — Alteration
Plumbing work file in conjunction with apartment renovation.
M01006524-I1
03/11/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/26/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/12/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/31/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/21/2025
Filed — Alteration
Minor interior renovation of existing apartment 8D. Work is mainly replacing 2 bathrooms, 1 kitchen and the addition of a powder room.
M00754849-P2
12/13/2024
Signed off — Alteration
M00960613-I1
12/13/2024
Signed off — Alteration
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT 9A AS PER PLANS SUBMITTED HEREWITH.
M00960632-I1
10/15/2024
Permit issued — General Construction
M00753447-I1-GC
10/15/2024
Permit issued — Mechanical Systems
M00754855-I1-MS
10/11/2024
Permit issued — Plumbing
M00754849-I1-PL
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Morbitzer
10/10/2024
Special inspection requirement — Mechanical Systems
Thomas Morbitzer
10/10/2024
Special inspection requirement — Final
Thomas Morbitzer
09/26/2024
Filed — Alteration
Minor interior renovation of existing apartment 8D. Work is mainly replacing 2 bathrooms, 1 kitchen and the addition of a powder room.
M00754849-P1
09/26/2024
Filed — Alteration
Minor mechanical venting. No change in use egress or occupancy.
M00754855-P1
08/27/2024
Permit issued — Suspended Scaffold
M01100146-I1-SC
08/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/22/2024
Filed — Alteration
M01100146-I1
08/09/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/16/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/09/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/03/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
EDUARD GRINFELD
06/11/2024
Objection raised — Scope
06/11/2024
Objection resolved — Addressed
05/31/2024
Filed — Alteration
FILING FOR PLUMBING WORK ASSOCIATED WITH INTERIOR RENOVATION OF APT 9A AS PER PLANS SUBMITTED HEREWITH.
M00960632-P1
05/29/2024
Permit issued — General Construction
M01006524-I1-GC
05/20/2024
Permit issued — Plumbing
M01006524-S1-PL
Latest 60 of 286 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedGallery Restoration08/14/2026
DOB NOWMechanical SystemsPermit IssuedGallery Restoration08/13/2026
DOB NOWGeneral ConstructionPermit IssuedGallery Restoration07/13/2026
DOB NOWMechanical SystemsPermit IssuedGallery Restoration07/13/2026
DOB NOWPlumbingPermit IssuedHydrokinetic Plumbing & Heating I06/12/2026
DOB NOWGeneral ConstructionSigned-offCortlandt Contracting10/15/2024
DOB NOWMechanical SystemsSigned-offCortlandt Contracting10/15/2024
DOB NOWPlumbingSigned-offMaster Tech Plumbing10/11/2024
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management08/27/2024
DOB NOWGeneral ConstructionSigned-offHiicompany05/29/2024
DOB NOWPlumbingSigned-offZ.W. Plumbing & Heating05/20/2024
DOB NOWGeneral ConstructionSigned-offH.I.I05/15/2024
DOB NOWPlumbingSigned-offUrban Mechanical02/01/2024
DOB NOWGeneral ConstructionSigned-offWojtas' Contracting Company01/24/2024
DOB NOWGeneral ConstructionSigned-offPam Air Conditioning11/20/2023
DOB NOWMechanical SystemsSigned-offPam Air Conditioning11/17/2023
DOB NOWStructuralSigned-offSapol Construction08/03/2023
DOB NOWStructuralSigned-offSapol Construction08/01/2023
DOB NOWMechanical SystemsSigned-offSapol Construction08/01/2023
DOB NOWGeneral ConstructionSigned-offCortlandt Contracting05/26/2023
DOB NOWGeneral ConstructionSigned-offP K Remodeling05/10/2023
DOB NOWStructuralSigned-offSapol Construction01/05/2023
DOB NOWMechanical SystemsSigned-offSapol Construction01/04/2023
DOB NOWPlumbingSigned-offDonato Plumbing12/06/2022
DOB NOWMechanical SystemsSigned-offSapol Construction09/15/2022
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management08/29/2022
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding08/09/2022
DOB NOWSupported ScaffoldSigned-offCentral Construction Management03/22/2022
DOB NOWStructuralSigned-offSapol Construction12/16/2021
DOB NOWPlumbingSigned-offDonato Plumbing12/07/2021
DOB NOWStructuralSigned-offTauland Kitchen & Bath10/28/2021
DOB NOWGeneral ConstructionSigned-offTauland Kitchen & Bath10/22/2021
DOB NOWMechanical SystemsSigned-offSapol Construction09/28/2021
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding09/14/2021
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management08/25/2021
DOB NOWGeneral ConstructionSigned-offTauland Kitchen & Bath05/21/2021
DOB NOWPlumbingSigned-offAqua Plumbing & Heating05/21/2021
DOB NOWPlumbingSigned-offA.M.N05/19/2021
DOB NOWGeneral ConstructionSigned-offAnthony Difalco05/19/2021
DOB NOWSidewalk ShedSigned-offCentral Construction Management03/19/2021
+ 60 more permits on file
2 projects · most recent 07/27/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/27/2026Permit IssuedGallery RestorationAir Conditioning Systems
Cooling
Friedrich WCT08A10A 8,000 BTU · Condensing Unit ×1
09/18/2020——Air Conditioning Systems
Cooling
Friedrich WCT08A10A 8,000 BTU · Ptac ×2
WCT12A10A 12,000 BTU · Ptac ×2
WCT10A10A 10,000 BTU · Ptac ×1
1 project · most recent 07/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/27/2026Permit IssuedHydrokinetic Plumbing & Heating IGas, Water/Sanitary
21 projects · most recent 07/20/2026
General Wiring
FiledStatusContractorScope
07/20/2026Permit IssuedNion ElectricGeneral Wiring
02/26/2025CompleteApollo Electric USA—
10/15/2024CompleteConductor Electrical ServicesGeneral Wiring
03/26/2024CompleteNY City ElectricGeneral Wiring
09/20/2023Permit IssuedScientific Electric CoGeneral Wiring
06/28/2023CompleteK & G Electric Co—
05/04/2022CompleteVlashava Electric Contracting—
10/19/2021CompleteApollo ElectricGeneral Wiring
05/24/2021CompleteVlashava Electric Contracting—
05/20/2021CompleteVma ElectricalGeneral Wiring
03/22/2021CompleteBorowide Elect'l Contractors—
12/23/2020CompleteTop Shelf Electric—
11/17/2020CompleteRND ElectricGeneral Wiring
09/14/2020CompleteStellmann ElectricalGeneral Wiring
03/06/2020CompleteWMS Electrical ContngGeneral Wiring
▾Field Inspections (DOB CAP) — 29
DateTypeResultReport
09/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/26/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/12/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/31/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/09/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/03/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/04/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/31/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
03/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/20/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/20/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 29.
▾Special Inspection Requirements (DOB NOW) — 75
DateRequirementInspectorRole
07/24/2026Fire-Resistant Penetrations and JointsLuis Pichardospecial
03/19/2026Lighting in dwelling unitsLuis Pichardoenergy_progress
03/16/2026FinalRONALD VILLANOprogress
03/16/2026Mechanical SystemsLuis Pichardospecial
03/16/2026Energy Code Compliance InspectionsLuis Pichardoprogress
03/16/2026Post-installed AnchorsLuis Pichardospecial
10/10/2024Mechanical SystemsThomas Morbitzerspecial
10/10/2024Fire-Resistant Penetrations and JointsThomas Morbitzerspecial
10/10/2024FinalThomas Morbitzerprogress
06/21/2024Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
04/25/2024Fire-Resistant Penetrations and JointsVincent Gentilespecial
04/11/2024Lighting in dwelling unitsThomas Morbitzerenergy_progress
04/11/2024Lighting controlsThomas Morbitzerenergy_progress
04/11/2024Fire-Resistant Penetrations and JointsThomas Morbitzerspecial
04/11/2024FinalThomas Morbitzerprogress
11/12/2023Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
11/09/2023Fire-Resistant Penetrations and JointsEDUARD GRINFELDspecial
11/09/2023FinalPETER NILESprogress
08/09/2023HVAC-R and service water heating equipmentSteven Bendoraitisenergy_progress
08/09/2023Energy Code Compliance InspectionsSteven Bendoraitisprogress
08/09/2023Fire-Resistant Penetrations and JointsABDALLAH ELCHERBINIspecial
08/09/2023HVAC-R and service water heating system controlsSteven Bendoraitisenergy_progress
08/09/2023HVAC-R and service water piping design and insulationSteven Bendoraitisenergy_progress
08/09/2023Maintenance informationSteven Bendoraitisenergy_progress
08/09/2023Permanent certificateSteven Bendoraitisenergy_progress
Latest 25 of 75.
▾Documents — 779 on file (BIS + DOB NOW)
▸Plans & Drawings54
▸DOB NOWPlans/Sketch26
09/06/2026M00086821-I1Request digital key ↗
09/04/2026M00467467-I1Request digital key ↗
09/03/2026M00564625-I1Request digital key ↗
Showing 3 of 26 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/05/2026M00278825-I1Request digital key ↗
09/04/2026M00467914-P3Request digital key ↗
09/04/2026M00467914-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed5
09/05/2026M00323074-I1Request digital key ↗
09/04/2026M00444338-I1Request digital key ↗
09/04/2026M00425925-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00278835-I1Request digital key ↗
09/04/2026M00215700-I1Request digital key ↗
09/02/2026M00242890-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/05/2026M00167719-I1Request digital key ↗
09/04/2026M00444298-P1Request digital key ↗
09/04/2026M00444298-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00467467-I1Request digital key ↗
08/15/2026M00464933-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/05/2026M00326828-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/03/2026M00281272-I1Request digital key ↗
▸Applications & Permits137
▸BISPLAN / WORK APPROVAL APPLICATION56
07/30/2025123888631Open ↗
08/24/2023100851623Open ↗
02/09/2023123740513Open ↗
Showing 3 of 56 on file for this type
▸BISWORK PERMIT APPLICATION43
02/07/2023123740513Open ↗
08/26/2022123740513Open ↗
06/16/2022141019485Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWLPC Approval/Permit37
09/04/2026M00215700-I1Open ↗
09/04/2026M00467914-P1Open ↗
09/04/2026M00467914-P3Open ↗
Showing 3 of 37 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
02/15/2022123740513Open ↗
▸Seals & Professional Certifications183
▸DOB NOWDPL-1: Design Professional Seal & Signature51
09/06/2026M00086821-I1Open ↗
09/05/2026M00167719-I1Open ↗
09/05/2026M00319990-I1Open ↗
Showing 3 of 51 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION43
03/19/2020140677211Open ↗
01/30/2020123740513Open ↗
01/29/2020123846927Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature41
09/25/2026M00753447-I1Open ↗
09/25/2026M00753447-I1Open ↗
09/25/2026M00753447-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/25/2026M00753447-I1Open ↗
09/22/2026M00464829-P2Open ↗
09/16/2026M00464829-I1Open ↗
Showing 3 of 27 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/16/2022141019485Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
06/16/2022141019485Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
06/16/2022141019485Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/11/2020140897340Open ↗
▸Trade Schedules & Equipment27
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING5
03/22/2021140854074Open ↗
Showing 1 of 5 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/26/2024123740513Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/26/2024123740513Open ↗
▸BISPLUMBING (PL) SIGNOFF1
01/24/2024123740513Open ↗
▸Safety & Tenant Protection38
▸BISTenant Protection Plan and Notes17
07/18/2020123888631Open ↗
01/30/2020123740513Open ↗
01/29/2020123846927Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan17
09/04/2026M00215700-I1Open ↗
09/04/2026M00444298-I1Open ↗
09/04/2026M00444298-P1Open ↗
Showing 3 of 17 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
02/14/2020123740513Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
01/23/2020123731596Open ↗
Showing 1 of 2 on file for this type
▸Environmental & Asbestos60
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
09/05/2026M00167719-I1Open ↗
09/05/2026M00278825-I1Open ↗
09/05/2026M00278835-I1Open ↗
Showing 3 of 26 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)19
07/18/2020123888631Open ↗
05/11/2020140897340Open ↗
02/24/2020123731596Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
09/02/2026M00243059-I1Open ↗
09/02/2026M00242890-I1Open ↗
08/15/2026M00464933-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)4
02/15/2022123740513Open ↗
01/08/2020123745885Open ↗
01/08/2020123745885Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS25
03/19/2020140677211Open ↗
01/23/2020123731596Open ↗
09/24/2019123335140Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
09/16/2020123731596Open ↗
08/26/2020123819485Open ↗
08/24/2020123819476Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
02/08/2023141019485Open ↗
06/16/2022141019485Open ↗
09/16/2020123731596Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/02/2026M00242890-I1Open ↗
08/15/2026M00464933-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
06/16/2022141019485Open ↗
Showing 1 of 2 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
07/25/2025123888631Open ↗
02/08/2023141019485Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY15
02/08/2023141019485Open ↗
06/16/2022141019485Open ↗
11/18/2020123846927Open ↗
Showing 3 of 15 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
01/04/2024123745885Open ↗
01/04/2024123740513Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION2
01/04/2024123745885Open ↗
01/04/2024123740513Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/16/2022141019485Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
07/25/2025123888631Open ↗
▸Approvals, Objections & Sign-offs76
▸BISLANDMARKS APPROVAL29
06/16/2022141019485Open ↗
11/26/2021123740513Open ↗
09/25/2020123740513Open ↗
Showing 3 of 29 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
08/07/2025123888631Open ↗
01/26/2024123745885Open ↗
01/26/2024123740513Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
07/19/2019123819476Open ↗
Showing 1 of 7 on file for this type
▸BISLANDMARKS SIGNOFF7
07/28/2025123888631Open ↗
01/04/2024123740513Open ↗
01/04/2024123745885Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
09/25/2020123740513Open ↗
Showing 1 of 6 on file for this type
▸BISFINAL3
07/25/2025123888631Open ↗
01/04/2024123745885Open ↗
01/04/2024123740513Open ↗
▸BISSUPERSEDING LETTER2
11/02/2020123888631Open ↗
03/12/2020123745885Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
03/19/2020140677211Open ↗
▸Cost, Insurance & Ownership46
▸BISCOST AFFIDAVIT41
02/17/2023123888631Open ↗
06/16/2022141019485Open ↗
11/18/2020123846927Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
07/28/2025123888631Open ↗
01/26/2024123745885Open ↗
01/26/2024123740513Open ↗
Showing 3 of 4 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms59
▸BISEFILING COVER SHEET23
05/08/2020123888631Open ↗
01/30/2020123740513Open ↗
01/23/2020123731596Open ↗
Showing 3 of 23 on file for this type
▸BISADDITIONAL INFORMATION17
05/16/2023123888631Open ↗
03/26/2023123888631Open ↗
02/22/2023123740513Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM12
02/07/2023123740513Open ↗
01/30/2023123740513Open ↗
08/23/2022123740513Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET7
06/16/2022141019485Open ↗
05/11/2020140897340Open ↗
Showing 2 of 7 on file for this type
▸Other Documents18
▸DOB NOWProof of Historic Building8
08/13/2026M00837551-P2Open ↗
Showing 1 of 8 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
01/29/2020123846927Open ↗
Showing 1 of 2 on file for this type
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Deferment1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSupporting Document: Fee Exempt1
07/07/2020123888631Open ↗
▸DOB NOWStructural Peer Review Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type