← Back
Miscellaneous religious facility
150 EAST 91 STREET
MANHATTAN · Upper East Side-Carnegie Hill · BIN 1091085
💬 Discuss this project
2023Year Built
12Stories
M9Building Class
C1-8XZoning
56,204 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized0 Open Violations
Miscellaneous religious facility · Owner of record: REDEEMER PRESBYTERIAN CHURCH EAST SIDE · 5,033 sf lot · 11.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Floor 101p · 1 filing · 20 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 329p · 1 filing · 20 docs
Floor 232p · 1 filing · 20 docs
Floor 128p · 2 filings · 20 docs
Cellar37p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REDEEMER PRESBYTERIAN CHURCH2404/09/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/14/2020$29.5M—SMG 91 LLC → REDEEMER PRESBYTERIAN CHURCH OF NEW YORK CITY— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIOS ARCHITECTURE1205/08/2026
COSENTINI ASSOCIATES911/20/2024
LANGAN ENGINEERING307/10/2024
WSP210/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES403/21/2026
DVA Advisors1703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PAVARINI MCGOVERN LLCGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPECIAL TESTING & CONSULT16881802/16/2026
LANGAN ENG, ENV, SURVEYIN1265307/10/2024
Building Lifecycle
All (148)Filed (26)Permit Issued (2)Signed Off (7)Violation (1)Inspection (2)Objection (80)Special Inspection (30)
06/04/2026
Special inspection requirement — Public Assembly Emergency Lighting
Joshua Rider
05/08/2026
Filed — No Work
M01044612-P5
04/20/2026
Special inspection requirement — Public Assembly Emergency Lighting
Joshua Rider
02/16/2026
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-A6
02/12/2026
Filed — No Work
M01044612-P4
02/12/2026
Filed — No Work
M01044783-P4
11/24/2025
Special inspection requirement — Public Assembly Emergency Lighting
Joshua Rider
11/24/2025
Special inspection requirement — Public Assembly Emergency Lighting
Joshua Rider
10/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Vestibules
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Protection of exposed foundation insulation
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Fenestration areas
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Air barrier continuity plan testing
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Luminous Exit Path Markings
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Fenestration air leakage
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
10/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SEBASTIAN SETTEDUCATE JR., P.E
09/12/2025
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S5
09/05/2025
Filed — No Work
M01044612-P3
09/05/2025
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-A3
07/02/2025
Special inspection requirement — Insulation placement and R values
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Vestibules
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Air barrier - visual inspection
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Protection of exposed foundation insulation
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Fenestration areas
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Masonry
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Air barrier continuity plan testing
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Energy Code Compliance Inspections
SEBASTIAN SETTEDUCATE JR., P.E
07/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
SEBASTIAN SETTEDUCATE JR., P.E
01/15/2025
Filed — No Work
M01044612-P1
12/05/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S7
12/05/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S1
12/05/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S2
11/25/2024
Objection resolved — Addressed
11/22/2024
Objection raised — Other
11/21/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S3
11/20/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-A2
11/18/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S8
11/12/2024
Signed off — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-S6
11/04/2024
Objection resolved — Addressed
11/01/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-A1
10/30/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-P8
10/29/2024
Objection raised — Other
10/25/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-P9
09/20/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/05/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-P6
07/10/2024
Filed — No Work
M01044612-I1
07/10/2024
Filed — No Work
M01044785-I1
07/10/2024
Filed — New Building
Install new sprinkler/standpipe system in conjunction with NB
M00553463-P1
07/01/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/02/2023
Permit issued — General Construction
M00553463-I1-GC
06/21/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 148 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedPAVARINI MCGOVERN LLC11/02/2023
DOB NOWGeneral ConstructionPermit IssuedPAVARINI MCGOVERN LLC11/02/2022
1 project · most recent 02/16/2026
Air Conditioning Systems Generators Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/16/2026Signed-offPAVARINI MCGOVERN LLCAir Conditioning Systems, Generators, Heating and Air Conditioning Systems
Cooling
Aaon CFA-040-D-0-8-EJ00J:0-00-J0-00-000-D-DE00-0000E00-000000B 381,700 BTU · Condensing Unit ×1
V3-ERB-8-0-142D-3MS:BCDE-UCK-000-E00-00A00R00-00-CA00B000 381,700 CFM · Heat Pump Outdoor ×1
Hitachi RAS-4.0PNNBDH1 36,000 BTU · Vrf Outdoor ×1
Heat / Cool
Hitachi HVAHR144B32S 135,000 BTU · Vrf Outdoor ×5
HVAHR120B32S 120,000 BTU · Vrf Outdoor ×2
HVAHP048B21S 48,000 BTU · Vrf Outdoor ×1
HVAHP096B32S 96,000 BTU · Vrf Outdoor ×1
HVAHR072B32S 72,000 BTU · Vrf Outdoor ×1
HVAHR168B32S 168,000 BTU · Vrf Outdoor ×1
HVAHR192B32S 192,000 BTU · Vrf Outdoor ×1
HVAHR216B32S 216,000 BTU · Vrf Outdoor ×1
Aaon RN-060-8-0-E609-000:VGMF-U08-DFM-AGA-0DEDLY1-00-DOC0000VB 14,500 CFM · Doas ×1
Generators
Preferred Utilities ATPSF-103-208-100 Pump ×2
1 project · most recent 02/16/2026
Sprinkler System
FiledStatusContractorScope
02/16/2026Signed-offKG SPRINKLER CORPSprinkler System
1 project · most recent 02/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/16/2026Signed-offDONATO, INCStorm, Water/Sanitary
3 projects · most recent 06/11/2026
General Wiring
FiledStatusContractorScope
06/11/2026CompleteM.C. ELECTRICAL NY INCGeneral Wiring
01/23/2020Permit IssuedRICHARD NEU—
09/19/2018Permit IssuedPAUL M. & SON'S ELECL CONGeneral Wiring
1 project · most recent 02/16/2026
Steel Concrete Masonry
FiledStatusContractorScope
02/16/2026Signed-offQUALITY HEATING DESIGN INSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/20/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
06/04/2026Public Assembly Emergency LightingJoshua Riderprogress
04/20/2026Public Assembly Emergency LightingJoshua Riderprogress
11/24/2025Public Assembly Emergency LightingJoshua Riderprogress
11/24/2025Public Assembly Emergency LightingJoshua Riderprogress
10/24/2025Luminous Exit Path MarkingsSEBASTIAN SETTEDUCATE JR., P.Especial
10/24/2025Air barrier - visual inspectionSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Air barrier continuity plan testingSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Fenestration air leakageSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Fenestration areasSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Protection of exposed foundation insulationSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Insulation placement and R valuesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025VestibulesSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Fenestration and door U-factor and product ratingsSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
10/24/2025Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
10/24/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
10/24/2025Wall Panels, Curtain Walls, and VeneersSEBASTIAN SETTEDUCATE JR., P.Especial
10/24/2025Mastic and Intumescent Fire-resistant CoatingsSEBASTIAN SETTEDUCATE JR., P.Especial
10/24/2025MasonrySEBASTIAN SETTEDUCATE JR., P.Especial
10/24/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/02/2025Fire-Resistant Penetrations and JointsSEBASTIAN SETTEDUCATE JR., P.Especial
07/02/2025Mastic and Intumescent Fire-resistant CoatingsSEBASTIAN SETTEDUCATE JR., P.Especial
07/02/2025Wall Panels, Curtain Walls, and VeneersSEBASTIAN SETTEDUCATE JR., P.Especial
07/02/2025Energy Code Compliance InspectionsSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/02/2025Fire-Resistance Rated ConstructionSEBASTIAN SETTEDUCATE JR., P.Eprogress
07/02/2025Air barrier continuity plan testingSEBASTIAN SETTEDUCATE JR., P.Eenergy_progress
Latest 25 of 121.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Place of Assembly6
08/26/2026M01044785-I1Request digital key ↗
08/17/2026M01044612-P1Request digital key ↗
08/17/2026M01044612-P3Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026M00553463-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00553463-P2Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature23
09/02/2026M01044783-I1Open ↗
09/02/2026M00553463-P9Open ↗
09/02/2026M00553463-P9Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/25/2026M00553463-P1Open ↗
09/25/2026M00553463-P1Open ↗
09/25/2026M00553463-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026M01044785-I1Open ↗
08/17/2026M01044612-P1Open ↗
08/17/2026M01044612-P3Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sanitary Sewer Certification (HCP/SC)2
08/13/2026M00553463-P2Open ↗
08/13/2026M00553463-P2Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M00553463-P2Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026M00553463-S1Open ↗
▸Inspections & Test Reports3
▸DOB NOWTR4 Plot Diagram1
08/13/2026M00553463-S7Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00553463-S7Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026M00553463-S7Open ↗
▸Approvals, Objections & Sign-offs6
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter6
08/26/2026M01044785-I1Open ↗
08/17/2026M01044612-I1Open ↗
08/17/2026M01044612-P5Open ↗
Showing 3 of 6 on file for this type
▸Other Documents19
▸DOB NOWAlternate Plan 14
08/17/2026M01044612-I1Open ↗
08/17/2026M01044612-P3Open ↗
08/17/2026M01044612-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDHCR Document3
08/13/2026M00553463-P2Open ↗
08/13/2026M00553463-P2Open ↗
08/13/2026M00553463-S9Open ↗
▸DOB NOWAlternate Plan 23
08/17/2026M01044612-I1Open ↗
08/17/2026M01044612-P4Open ↗
08/17/2026M01044612-P5Open ↗
▸DOB NOWAlternate Plan 32
08/17/2026M01044612-I1Open ↗
08/17/2026M01044612-P5Open ↗
▸DOB NOWAlternate Plan 42
08/17/2026M01044612-I1Open ↗
08/17/2026M01044612-P5Open ↗
▸DOB NOWSURVEY: INITIAL1
08/13/2026M00553463-P2Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll1
08/13/2026M01044612-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026M00553463-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00553463-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00553463-S8Open ↗