← Back
BuildNYC
Two family frame
150 FOCH AVENUE
STATEN ISLAND · BIN 5047877
💬 Discuss this project
1970Year Built
1Stories
B2Building Class
R3XZoning
2,646 sfGross Floor Area
2Units
0 Active Violations
Two family frame · 6,000 sf lot · 0.44 FAR built · Flood zone X500
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSignage and attic vent2p · 1 filing · 4 docs
Floor 13p · 1 filing · 17 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Parker and West Engineering103/01/2024
Haym S. Gross, Architect207/18/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Britz Enterprises403/21/2026
Sunrun103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GroupGeneral Contractor203/21/2026
Sunrun Installation ServiceGeneral Contractor103/21/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Parker and West Engineering5272103/01/2024
Rike Tech Associates2965207/18/2023
Building Lifecycle
07/17/2024
Signed off — Alteration
S01010984-I1
03/08/2024
Permit issued — Solar
S01010984-I1-SL
03/01/2024
Filed — Alteration
S01010984-I1
02/26/2024
Closed: The rear deck has been increased in size and the patio area below the deck in being converted into finished living space with added electrical…
DOB violation · closed on the city's record
09/01/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
36 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunrun Installation Service03/08/2024
DOB NOWGeneral ConstructionSigned-offFRSS Group08/18/2023
BISOTISSUEDSunrun Installation Service03/01/2024
BISOTISSUEDSunrun Installation Service12/13/2022
BISOTISSUEDN/A07/21/2000
2 projects · most recent 03/01/2024
FiledStatusContractorScope
03/01/2024CompleteSunrun Solar Electl—
08/25/2023CompleteKings Electric—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/01/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
08/11/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
08/11/2023Fenestration areasSYED RIZVIenergy_progress
08/11/2023Insulation placement and R valuesSYED RIZVIenergy_progress
08/11/2023Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
08/11/2023Fenestration air leakageSYED RIZVIenergy_progress
08/11/2023Air barrier - visual inspectionSYED RIZVIenergy_progress
08/11/2023Fire-Resistance Rated ConstructionSYED RIZVIprogress
08/11/2023Energy Code Compliance InspectionsSYED RIZVIprogress
08/11/2023Subgrade InspectionsSYED RIZVIspecial
08/11/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
07/17/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
06/20/2023Concrete - Cast-In-PlaceSYED RIZVIspecial
06/20/2023Fenestration air leakageSYED RIZVIenergy_progress
06/20/2023Fenestration and door U-factor and product ratingsSYED RIZVIenergy_progress
06/20/2023Insulation placement and R valuesSYED RIZVIenergy_progress
06/20/2023Air barrier - visual inspectionSYED RIZVIenergy_progress
06/20/2023Fenestration areasSYED RIZVIenergy_progress
06/20/2023Fire-Resistance Rated ConstructionSYED RIZVIprogress
06/20/2023Energy Code Compliance InspectionsSYED RIZVIprogress
06/20/2023Subgrade InspectionsSYED RIZVIspecial
06/20/2023Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
06/20/2023Fire-Resistant Penetrations and JointsSYED RIZVIspecial
41 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account