DOB07/15/2015FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB02/11/2015FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB12/17/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB04/13/2015WORK NO PERMIT-OBSERVED NEW PLUMBING WORK IN PROCESS PVC (DRAW) LINES INSTALLED OSP STORM PIPING-FOR STORM DRAINS 4 & 2" & 1 1/2 ¢VC DRAIN LINES FOR BSMT & 1ST FL PLUMBING FIXTURES-NEW & EXISTING-GAS,VENT PIPINNothing owed — awaiting certificate of correction
ECB10/31/2014WORK W/O A PERMIT.OBSERVED @ 2:02PM @ EXTERIOR SIDE OF BLDG NEWLY INSTALLED PVC DRAIN PIPING FOR RAIN LEADER LINE FOR BLDG TIED IN BELOW CONCRET.REM:OBTAIN A PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB09/15/2014UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. NOTED:A FULL STOP WORK ORDER ISSUED FOR CREATING ENTRANCE TO BASEMENT. AT THE TIME OF INSPECITON CREW OF WORKERS ARE WORKING. ALL MOST ENTRANCENothing owed — awaiting certificate of correction
ECB08/28/2014WORK W/O A PERMIT WORK NOTED IN THAT @ FRONT OF BLDG NEW ENTRANCE WAY & EXCAVATION IS BEING DONE TO CREATE A DOOR WAY INTO BASEMENT.ALL WORK IS BEING DONE W/O APPROVALS & PERMITS.REM:STOP ALL WORK OBTAIN APPROVNothing owed — awaiting certificate of correction
Two family frame · 3,500 sf lot · 0.51 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.