← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Toren Condominium
150 MYRTLE AVENUE · BIN 3394020
💬 Discuss this project
2007Year Built
37Stories
RMBuilding Class
C6-4Zoning
245,678 sfGross Floor Area
243Units
LL97 CoveredRent Stabilized9 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: TOREN CONDOMINIUM · 21,371 sf lot · 11.5 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 5 docs
Floor 291p · 1 filing · 5 docs
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXO INDUSTRIES809/09/2026
AKAM ASSOCIATES1307/08/2026
TOREN CONDOMINIUM503/22/2026
TOZEN CONDOMINIUM103/22/2026
MYRTLE AVE BUILDERS4103/22/2026
MYRTLE OWNERS LLC1103/22/2026
U.S. CRANE RIGGING LLC203/22/2026
CARWIN CONSTRUCTION INC103/22/2026
MURTLE AVE BUILDERS LLC103/22/2026
MYRTIC AVE BUILDERS103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JS ARCHITECTURE DESIGN603/21/2026
LOMBARDO BUILDING CONSULTANTS303/21/2026
HOWARD L ZIMMERMAN ARCHITECTS203/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EXO INDUSTRIES CORPGeneral Contractor509/09/2026
OVERALL RENOVATION INCGeneral Contractor407/08/2026
RICHARD NEUElectrical103/21/2026
ANTHONY LUCIANOElectrical103/21/2026
PRIVILEGE CONSTRUCTION COGeneral Contractor107/08/2026
YOUNG CHOEElectrical103/21/2026
LUCIANO, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LOMBARDO PROF ENGINEERING8566405/27/2026
HOWARD L ZIMMERMAN ARCHIT1712111/27/2024
Building Lifecycle
All (114)Filed (10)Permit Issued (10)Signed Off (5)Facade (FISP) (6)Violation (60)Inspection (1)Objection (10)Special Inspection (12)
09/08/2026
Permit issued — Sidewalk Shed
B01227350-I1-SH
08/24/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01245094-I1
07/22/2026
Permit issued — Supported Scaffold
B01431865-I1-SF
07/21/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01431865-I1
07/21/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
07/15/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
07/13/2026
Objection resolved — Addressed
06/18/2026
Permit issued — Suspended Scaffold
B01245094-I1-SC
06/08/2026
Objection raised — Other
05/27/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01245094-P3
05/27/2026
Special inspection requirement — Post-installed Anchors
Michael Lombardo
05/27/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
05/14/2026
Signed off — Alteration
B01144299-I1
03/16/2026
Permit issued — Sidewalk Shed
B01227350-I1-SH
02/12/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01245094-P2
12/12/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01245094-P1
12/09/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Lombardo
12/09/2025
Special inspection requirement — Post-installed Anchors
Michael Lombardo
11/18/2025
Permit issued — General Construction
B01144299-I1-GC
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
C
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
A
10/04/2025
Violation issued (HPD, open)
A
06/26/2025
Permit issued — Suspended Scaffold
B01245094-I1-SC
06/25/2025
Objection raised — Admin
06/25/2025
Objection resolved — Addressed
06/24/2025
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
B01245094-I1
06/16/2025
Permit issued — Sidewalk Shed
B01227350-I1-SH
06/13/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01227350-I1
03/19/2025
Violation issued (HPD, closed)
B
03/19/2025
Violation issued (HPD, closed)
B
11/27/2024
Filed — Alteration
B01144299-I1
11/19/2024
Special inspection requirement — Final
Howard Zimmerman
11/19/2024
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Howard Zimmerman
11/19/2024
Special inspection requirement — Tenant Protection Plan Compliance
Howard Zimmerman
11/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
11/19/2024
Special inspection requirement — Post-installed Anchors
Howard Zimmerman
09/12/2023
Signed off — Alteration
ENLARGE EXISTING MASTER BEDROOM ON UPPER FLOOR OF EXISTING DUPLEX UNIT: PARTIAL REMOVAL OF PARTITION AND DOUBLE HIGH CEILING ABOVE LIVING ROOM (LOWER-LEVEL OF DUPLEX APARTMENT) TO ACCOMMODATE NEW FLOORING FOR ENLARGE MASTER BEDROOM.
B00848490-I1
06/07/2023
Permit issued — General Construction
B00848490-I1-GC
04/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/12/2023
Objection raised — Other
04/12/2023
Objection resolved — Addressed
04/04/2023
Objection raised — Zoning
04/04/2023
Objection resolved — Addressed
03/31/2023
Objection raised — Zoning
03/31/2023
Objection resolved — Addressed
03/29/2023
Filed — Alteration
ENLARGE EXISTING MASTER BEDROOM ON UPPER FLOOR OF EXISTING DUPLEX UNIT: PARTIAL REMOVAL OF PARTITION AND DOUBLE HIGH CEILING ABOVE LIVING ROOM (LOWER-LEVEL OF DUPLEX APARTMENT) TO ACCOMMODATE NEW FLOORING FOR ENLARGE MASTER BEDROOM.
B00848490-I1
03/22/2023
Special inspection requirement — Final
Hany Rizkalla
02/24/2023
Signed off — Alteration
B08008252-I1
02/21/2023
Cycle 9 facade report submitted
02/21/2023
Cycle 9 facade report signed — SWARMP
02/17/2023
Cycle 9 facade inspection completed
12/28/2022
Permit issued — General Construction
B08008252-I1-GC
10/05/2022
Filed — Alteration
B08008252-I1
08/05/2022
Signed off — Alteration
B00597314-I1
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedEXO INDUSTRIES CORP09/08/2026
DOB NOWSupported ScaffoldPermit IssuedEXO INDUSTRIES CORP07/22/2026
DOB NOWSuspended ScaffoldSigned-offEXO INDUSTRIES CORP06/18/2026
DOB NOWSidewalk ShedPermit IssuedEXO INDUSTRIES CORP03/16/2026
DOB NOWGeneral ConstructionSigned-offEXO INDUSTRIES CORP11/18/2025
DOB NOWSuspended ScaffoldSigned-offEXO INDUSTRIES CORP06/26/2025
DOB NOWSidewalk ShedPermit IssuedEXO INDUSTRIES CORP06/16/2025
DOB NOWGeneral ConstructionSigned-offOVERALL RENOVATION INC06/07/2023
DOB NOWGeneral ConstructionSigned-offOVERALL RENOVATION INC12/28/2022
DOB NOWGeneral ConstructionSigned-offPRIVILEGE CONSTRUCTION CO12/02/2021
BISOTISSUEDLAILE INC03/10/2022
BISOTISSUEDD. HUS HOME IMPROVEMENT *06/24/2020
BISOTISSUEDVBDB INC10/23/2018
BISOTISSUEDMJM CONTRACTING INC07/12/2018
BISOTISSUEDMJM CONTRACTING INC06/29/2018
BISEQISSUEDPILKU CONSTRUCTION SERVIC12/16/2016
BISEQISSUEDPILKU CONSTRUCTION SERVIC12/28/2015
BISEQISSUEDPILKU CONSTRUCTION SERVIC12/24/2014
BISEQISSUEDPILKU CONSTRUCTION SERVIC01/06/2014
BISEQISSUEDPILKU CONSTRUCTION SERVIC12/23/2013
BISMHISSUEDC.S.D. DESIGN LLC10/09/2013
BISMHISSUEDCITY CONSULTANT ENGINEERI06/27/2013
BISEQISSUEDPILKU CONSTRUCTION SERVIC12/26/2012
BISEQISSUEDPILKU CONSTRUCTION SERVIC11/29/2012
BISEQISSUEDARSENAL SCAFFOLD INC11/13/2012
BISFPISSUEDMASTER FIRE SYSTEMS, INC11/13/2012
BISEQISSUEDARSENAL SCAFFOLD INC06/18/2012
BISSPISSUEDPETER PLUMBING ASSOC. INC.03/05/2012
BISEQISSUEDARSENAL SCAFFOLD INC01/11/2012
BISPLISSUEDPETER PLUMBING ASSOC. INC.01/05/2012
BISOTISSUEDC.S.D. DESIGN LLC05/02/2011
BISOTISSUEDC.S.D. DESIGN LLC04/29/2011
BISPLISSUEDM. EARLY PLBG & HTG CORP02/02/2011
BISSDISSUEDM. EARLY PLBG & HTG CORP02/02/2011
BISOTISSUEDNOBLE CONSTRUCTION GR LLC12/06/2010
BIS—ISSUEDMYRTLE AVENUE BLDRS LLC02/16/2010
BISEQISSUEDMYRTLE AVENUE BLDRS LLC02/08/2010
BISPLISSUEDM. EARLY PLBG & HTG CORP02/05/2010
BISSPISSUEDM. EARLY PLBG & HTG CORP02/05/2010
BISPLISSUEDRO-SAL PLUMBING & HTG INC INC.07/27/2009
+ 20 more permits on file
2 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025Permit IssuedRICHARD NEU—
11/09/2023Permit IssuedTRI-POWER ELECTRICAL LLCGeneral Wiring
2 projects · most recent 07/21/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/21/2026Permit IssuedEXO INDUSTRIES CORPScaffold
06/13/2025Permit IssuedEXO INDUSTRIES CORPSidewalk Shed
1 project · most recent 05/27/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/27/2026Signed-offEXO INDUSTRIES CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
07/21/2026Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/15/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
07/15/2026Post-installed AnchorsMichael Lombardospecial
05/27/2026Post-installed AnchorsMichael Lombardospecial
05/27/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
12/09/2025Alternative Materials - OTCR Buildings Bulletin NumberMichael Lombardospecial
12/09/2025Post-installed AnchorsMichael Lombardospecial
11/19/2024FinalHoward Zimmermanprogress
11/19/2024Wall Panels, Curtain Walls, and VeneersHoward Zimmermanspecial
11/19/2024Tenant Protection Plan ComplianceHoward Zimmermanspecial
11/19/2024Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
11/19/2024Post-installed AnchorsHoward Zimmermanspecial
03/22/2023FinalHany Rizkallaprogress
▾Documents — 396 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/01/2026B00597314-I1Request digital key ↗
08/28/2026B08008252-I1Request digital key ↗
08/23/2026B01144299-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits77
▸BISPLAN / WORK APPROVAL APPLICATION41
02/08/2023340746802Open ↗
12/23/2021340746802Open ↗
09/30/2020340746802Open ↗
Showing 3 of 41 on file for this type
▸BISWORK PERMIT APPLICATION36
03/10/2022340746802Open ↗
06/24/2020322072083Open ↗
10/25/2018321759593Open ↗
Showing 3 of 36 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM2
10/06/2020340746802Open ↗
07/24/2018321759593Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B08008252-I1Open ↗
08/13/2026B00848490-I1Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
10/06/2020340746802Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
10/06/2020340746802Open ↗
▸Seals & Professional Certifications85
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION37
03/05/2020322072083Open ↗
07/15/2019321759593Open ↗
01/23/2019321553476Open ↗
Showing 3 of 37 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST13
12/13/2012320751959Open ↗
11/14/2012320537095Open ↗
01/12/2012320417768Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM12
12/13/2012320751959Open ↗
12/03/2012320537095Open ↗
Showing 2 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/28/2026B01144299-I1Open ↗
09/01/2026B01245094-I1Open ↗
09/01/2026B01245094-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/01/2026B00597314-I1Open ↗
08/28/2026B08008252-I1Open ↗
08/27/2026B00848490-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPC FULL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
09/28/2026B01144299-I1Open ↗
08/25/2026B00848490-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
06/27/2013340065930Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/14/2020340746802Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/27/2013340065930Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/27/2013340065930Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING6
10/15/2013320288452Open ↗
07/26/2012320288452Open ↗
06/14/2012320288452Open ↗
Showing 3 of 6 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
11/29/2013320288452Open ↗
11/21/2013320288452Open ↗
11/01/2013320288452Open ↗
Showing 3 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
08/27/2012320288452Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes6
10/06/2020340746802Open ↗
03/05/2020322072083Open ↗
06/20/2018321731220Open ↗
Showing 3 of 6 on file for this type
▸BISSTREET TREE CHECKLIST2
10/06/2020340746802Open ↗
10/22/2018321759593Open ↗
▸BISTENANT PROTECTION PLAN 2008 CODE1
06/27/2013340065930Open ↗
▸BISSTREET TREE SIGNOFF1
02/23/2023340746802Open ↗
▸Environmental & Asbestos15
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
03/05/2020322072083Open ↗
07/15/2019321759593Open ↗
01/23/2019321553476Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
07/15/2019321759593Open ↗
01/23/2019321553476Open ↗
01/23/2019321731220Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/14/2023340746802Open ↗
03/09/2023340746802Open ↗
08/24/2020340746802Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
02/23/2023340746802Open ↗
10/19/2020322072083Open ↗
▸BISTR8: Energy Code Progress Inspections2
10/10/2013320288452Open ↗
10/10/2013320288452Open ↗
▸BISLIGHTING IN DWELLING UNITS1
02/23/2023340746802Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
02/23/2023340746802Open ↗
▸BISLIGHTING CONTROLS1
03/14/2023340746802Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00597314-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/14/2023340746802Open ↗
10/19/2020322072083Open ↗
10/19/2020322072083Open ↗
Showing 3 of 6 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
03/07/2022340746802Open ↗
06/27/2013340065930Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
02/23/2023340746802Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/24/2023340746802Open ↗
▸BIS2008 CODE TR1 REQUIRED1
06/27/2013340065930Open ↗
▸BISMECHANICAL SYSTEMS1
06/27/2013340065930Open ↗
▸Approvals, Objections & Sign-offs54
▸BISADMINISTRATIVE OBJECTIONS20
12/13/2012320751959Open ↗
11/14/2012320537095Open ↗
11/09/2012320562342Open ↗
Showing 3 of 20 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
03/15/2023340746802Open ↗
11/05/2020322072083Open ↗
10/19/2020322072083Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
02/24/2015320751959Open ↗
01/08/2014320751959Open ↗
01/03/2014320751959Open ↗
Showing 3 of 9 on file for this type
▸BISFINAL3
02/24/2023340746802Open ↗
11/05/2020322072083Open ↗
06/27/2013340065930Open ↗
▸BISSHED LETTER2
01/12/2016320751959Open ↗
01/12/2016320751959Open ↗
▸BISSUPERSEDING LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership25
▸BISCOST AFFIDAVIT22
10/06/2020340746802Open ↗
07/18/2020322072083Open ↗
03/05/2020322072083Open ↗
Showing 3 of 22 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/07/2023340746802Open ↗
10/19/2020322072083Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/30/2012320476597Open ↗
▸Filing & Intake Forms45
▸BISEFILING COVER SHEET22
03/05/2020322072083Open ↗
05/17/2018321759593Open ↗
04/04/2018321731220Open ↗
Showing 3 of 22 on file for this type
▸BISADDITIONAL INFORMATION18
02/15/2023340746802Open ↗
11/04/2020340746802Open ↗
11/04/2020340746802Open ↗
Showing 3 of 18 on file for this type
▸BISBOROUGH INTAKE FORM3
07/15/2019321759593Open ↗
01/23/2019321553476Open ↗
01/23/2019321731220Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
08/14/2020340746802Open ↗
06/27/2013340065930Open ↗
▸Other Documents15
▸DOB NOWManufacturer's Specifications4
08/16/2026B01245094-P1Open ↗
08/16/2026B01245094-I1Open ↗
08/14/2026B01245094-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWCalculations4
08/16/2026B01245094-I1Open ↗
08/16/2026B01245094-P1Open ↗
08/14/2026B01245094-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram3
08/13/2026B00848490-I1Open ↗
08/13/2026B00597314-I1Open ↗
08/13/2026B08008252-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00848490-I1Open ↗
08/13/2026B08008252-I1Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
02/23/2023340746802Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026B00597314-I1Open ↗