2023Year Built
2Stories
A1Building Class
R2Zoning
2,776 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 5,400 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof4p · 1 filing · 20 docs
Attic2p · 1 filing · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 112p · 2 filings · 20 docs
Cellar10p · 2 filings · 20 docs
Basement15p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ronald D.victorio R.A1109/01/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Stout HomesGeneral Contractor1203/21/2026
Duo Plumbing & HeatingPlumbing207/08/2026
JM Mechanical HVACspecialty_contractor107/08/2026
Stout HomesScaffold107/03/2026
Quality PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P67381009/01/2026
Building Lifecycle
09/04/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
Removal of existing drain lines, water supply lines & fixtures. Installation of new drain lines, water supply lines & fixtures. Including the removal of existing gas piping & gas equipment and appliances. Existing gas, water meter & house trap to remain.
S08004461-I1
09/01/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Removal of existing drain lines, water supply lines & fixtures. Installation of new drain lines, water supply lines & fixtures. Including the removal of existing gas piping & gas equipment and appliances. Existing gas, water meter & house trap to remain.
S08004461-A1
08/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
anthony santoro
08/25/2026
Special inspection requirement — Subgrade Inspections
anthony santoro
08/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
68 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJM Mechanical HVAC09/15/2025
DOB NOWPlumbingSigned-offDuo Plumbing & Heating12/06/2023
DOB NOWPlumbingSigned-offQuality Plumbing09/06/2023
DOB NOWPlumbingSigned-offDuo Plumbing & Heating08/17/2023
DOB NOWFoundationSigned-offStout Homes07/05/2023
DOB NOWEarth WorkSigned-offStout Homes07/05/2023
DOB NOWFoundationSigned-offStout Homes07/05/2023
DOB NOWFoundationPermit IssuedStout Homes07/01/2023
DOB NOWConstruction FenceSigned-offStout Homes06/08/2023
1 project · most recent 09/01/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
09/01/2026Signed-offJM Mechanical HVACAir Conditioning Systems, Ventilation Systems
1 project · most recent 09/01/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/01/2026Signed-offDuo Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 07/23/2024
General Wiring
FiledStatusContractorScope
07/23/2024CompleteRidge ElectricGeneral Wiring
09/01/2023CompleteRidge ElectricGeneral Wiring
1 project · most recent 09/01/2026
Wood
FiledStatusContractorScope
09/01/2026Signed-offJM Mechanical HVACWood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2023Pass-Final PL - UndergroundPassView ↗
09/13/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
09/11/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 121
DateRequirementInspectorRole
08/25/2026Insulation placement and R valuesanthony santoroenergy_progress
08/25/2026Excavations - Sheeting, Shoring, and Bracinganthony santorospecial
08/25/2026Fire-Resistant Penetrations and Jointsanthony santorospecial
08/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
08/25/2026Structural Stability – Alterations of existing buildingsanthony santorospecial
08/25/2026Subgrade Inspectionsanthony santorospecial
08/25/2026Wood – Prefabricated I-Joistsanthony santorospecial
08/25/2026Energy Code Compliance Inspectionsanthony santoroprogress
08/25/2026Finalanthony santoroprogress
08/25/2026Fire-Resistance Rated Constructionanthony santoroprogress
08/25/2026Footing and Foundationanthony santoroprogress
08/25/2026Structural Wood Frameanthony santoroprogress
08/25/2026Air barrier - visual inspectionanthony santoroenergy_progress
08/25/2026Air barrier — testing anthony santoroenergy_progress
08/25/2026Fenestration air leakageanthony santoroenergy_progress
08/25/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
08/25/2026Protection of exposed foundation insulationanthony santoroenergy_progress
08/25/2026Interior lighting poweranthony santoroenergy_progress
08/25/2026Fenestration areasanthony santoroenergy_progress
08/25/2026Permanent certificateanthony santoroenergy_progress
08/25/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/25/2026Maintenance informationanthony santoroenergy_progress
08/25/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
08/25/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
08/25/2026Concrete - Cast-In-Placeanthony santorospecial