ECB06/27/2022FAILURE TO OBTAIN CONSTRUCTION FENCE PERMITOBTAIN CONSTRUCTION FENCE PERMIT$6K due
DOB02/16/2022FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/15/20213314.1 FAILURE TO MAINTAIN SUPPORTED SCAFFOLD IN SAFE MANNER.AT THE TIME OF INSPECTION OF A PROPOSED 3 STORY BUILDING OBSERVED SUPPORTED SCAFFOLD ERECTED AT FRONT EXP HAS DEBRIS NETTING DISCONNECTED,GUARDRAILS$12K due
ECB03/18/2020WORK WITHOUT A PERMIT.AT THE TIME OF INSPECTION AT A 3 STORY BUILDING OBSERVED CONSTRUCTION FENCE AT EXP#1.UPON REVIEW OF DEPARTMENT RECORDSIT WAS OBSERVED THAT NO PERMIT WAS ISSUED FOR INSTALLATION OF CONSTRUC$6K due
ECB11/28/2018BC3314.1/PARTIAL STOP WORK ORDER FOR SUPPORTED SCAFFOLD ISSUED PURSUANT TO 28-207.2 AND POSTED AT PREMISES.UNSAFE CONDITIONS.NOTE:OBSERVED SUPPORTED SCAFFOLD APPROX.38'IN HEIGHT IS ERECTED AT THE FRONT OF THE B$6K due
HPD08/02/2005SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING OUTLET COVER, THRU/OUT 3RD STY. APT.
HPD08/02/2005SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN & BATHROOM, 3RD STY. APT.
HPD08/02/2005SECTION 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING BATTERS & RAILS, 2ND STY. REAR BALCONY FIRE ESCAPE.
HPD08/02/2005SECTION 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES 3RD STY. APT.
HPD08/02/2005SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING BALUSTER PUBLIC HALL, ALL FLOORS.
DOB11/30/2001WORK WITHOUT A PERMIT WOK NOTED HAVING ERECTED A PIPE SCAFFOLD IN FRON T OF PREMISE REMEDY OBTAIN A PERMIT
DOB11/27/2000V-DOB VIOLATION - ACTIVE
DOB10/23/2000V-DOB VIOLATION - ACTIVE
DOB04/28/1998WORK WITHOUT A PERMIT. WORK NOTED: HAVING GUTTED ENTIRE SECOND FLOOR APARTMENT INCLUDING REMOVAL OF WALLS, PLUMBING AND ELECTRICAL REMEDY: S T O P A L L W O R K EXCEPT THE REMOVAL OF EXCESSIVE COMBUSTIBLE DEBRIS, FILE PLANS AND OBTAIN PERMITS
DOB04/21/1998WORK WITHOUT A PERMIT: WORK NOTED: TOTAL RENOVATION OF THIRD FLOOR COMPLETED AT TIME OF INSPECTION SECOND FLOOR GUTTED EXPOSING BEAMS AND INTERIOR WALL STUDS AND BRICK WORK. NO PERMITS AT SITE, NO PLANS AT SITE AT TIME OF INSPECTION. STOP ALL INTERIOR WORK! REMEDY: OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE PREMISES
ECB02/06/2002WORK WITHOUT A PERMIT. WORK NOTED. REMOVED PORTIONS OF MASONRY 2ND FL FACADE EXPOSING BRICK WORK WITHOUT A PERMIT NOTED: ALSO CREATED OVER HANG ABOVE DOORWAY AND WINDOWS WITH METAL CORRAGATED DECKING AND CONCRENothing owed — awaiting certificate of correction
ECB02/06/2002WORK W/O PERMIT. WORK NOTED:INSTALLED NEW LUMBER ENTRANCE DOOR AND LUMBER HEADER AND JAMB SURROUNDING W/OUT A PERMIT. NOTED LOCATION: MAIN ENTRY ADJACENT SACKETT ST ON GROUND LEVEL. NOTED EXPOSED RAW FRAMING ANNothing owed — awaiting certificate of correction
ECB11/30/2001WORK W/O A PERMIT. WORK NOTED HAVING ERECTED A PIPE SCAFFLOD IN FRONT OF PREMISE. REMEDY: OBTAIN A PERMITNothing owed — awaiting certificate of correction
ECB11/30/2001FAILURE TO MAINTAIN EXTERIOR BUILDING WALL-HAZARDOUS.DEFECT IS FRONT FACADE OF BUILDING IS BA;CONY FORM THE TOP OF THE FIRST STORY TO THE TOP OF THE 3RD STORY.REMEDY:MAINTAIN EXTERIOR BUILDING WALL.Nothing owed — awaiting certificate of correction
ECB10/23/2000FAILURE TO MAINTAIN EXTERIOR BUILDING WALL DEFECT IS:VERTICAL CRACKS IN EXTERIOR BUIDLING WALL MORTAR JOINTS CRACKS GO UP FACADE WALL FRONT 2ND TO PARAPET.REMEDY:SUBMIT ENGINEERS REPORT OF STUCTURAL STABILITY.Nothing owed — awaiting certificate of correction
ECB04/29/1998WORK WITHOUT A PERMIT. WORK NOTED: HAVING GUTTED ENTIRE SECOND FLLOR APARTMENT INCLUDING REMOVAL OF WALLS, PLUMBLING AND ELECTRICAL. 2) HAVING CONSTRUCTED A SHEET ROCK PARTITION AT FRONT OF SECOND STORY. 3)Nothing owed — awaiting certificate of correction
ECB04/27/1998FAILURE TO MAINTAIN, DEFECT IS: 1) APPROX 3000 CUBIC FEET OF COMBUSTIBLE WOOD DEBRIS IS STORED IN REAR YARD. 2) BRICK WALL AT FRONT OF BUILDING IS BULGING OUTWARD AT 2ND STORY. 3) REAR FIRE ESCAPE IS SEVERLYNothing owed — awaiting certificate of correction
ECB04/27/1998WORK WITHOUT A PERMIT. WORK NOTED: HAVING GUTTED ENTIRE SECOND FLOOR APARTMENT INCLUDING REMOVAL OF WALLS, PLUMBING AND ELECTRICAL. REMEDY:"STOP ALL WORK" EXCEPT THE REMOVAL OF EXCESSIVE COMBUSTIBLE DEBRIS,Nothing owed — awaiting certificate of correction