← Back
BuildNYC
Two family frame
150 SWINNERTON STREET
STATEN ISLAND · BIN 5088222
💬 Discuss this project
1986Year Built
2Stories
B2Building Class
R3XZoning
3,360 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 6,500 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofPV System Installation2p · 1 filing · 15 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte203/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Patriot Energy Solutions403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Patriot Energy Solspecialty_contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116203/10/2026
Building Lifecycle
03/12/2026
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01198082-I1
03/10/2026
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01198082-P1
03/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
03/10/2026
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
03/10/2026
Special inspection requirement — Final
VYACHESLAV NECHAYEV
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPatriot Energy Sol05/20/2025
BISOTISSUEDN/A04/26/2001
2 projects · most recent 04/11/2025
FiledStatusContractorScope
04/11/2025CompleteMak Electrical Contracting—
01/08/2025Permit IssuedA. J. Caruso Electrical I—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/10/2026Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/10/2026Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
03/10/2026FinalVYACHESLAV NECHAYEVprogress
03/10/2026Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
03/04/2026Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
03/04/2026Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
03/04/2026FinalVYACHESLAV NECHAYEVprogress
03/04/2026Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account