← Back
Garden apartments
150 TRANTOR PLACE
STATEN ISLAND · Port Richmond · BIN 5109063
💬 Discuss this project
1966Year Built
2Stories
C9Building Class
R3-2Zoning
49,800 sfGross Floor Area
52Units
Rent Stabilized68 Open Violations 67 unresolved · 1 paperwork only ▸FDNY Report ↗
Garden apartments · Owner of record: UFARATZTA LLC · 64,625 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIGNATURE MANAGEMENT1507/08/2026
UFARATZTA LLC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.608/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
P.H. WORKS INCPlumbing807/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851608/27/2025
Building Lifecycle
All (73)Filed (6)Permit Issued (8)Violation (40)Inspection (1)Special Inspection (18)
11/14/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/13/2025
Permit issued — Boiler Equipment
S00654945-I1-BE
11/13/2025
Permit issued — Boiler Equipment
S00654923-I1-BE
08/28/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
08/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
08/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
08/28/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
08/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
08/28/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
08/27/2025
Filed — Alteration
REGISTER BOILER TO OBTAIN BOILER DIVISION INSPECTION AND SIGN-OFF.
S00654923-P3
08/27/2025
Filed — Alteration
REGISTER BOILER TO OBTAIN INSPECTION AND SIGN-OFF TO RESOLVE ECB VIOLATION 39046225H.
S00654945-P2
08/01/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
08/01/2025
Special inspection requirement — Heating Systems
LOUIS ARENA
08/01/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/01/2025
Special inspection requirement — HVAC-R and service water heating system controls
08/01/2025
Special inspection requirement — Maintenance information
LOUIS ARENA
08/01/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/30/2024
Filed — Alteration
REGISTER BOILER TO OBTAIN INSPECTION AND SIGN-OFF TO RESOLVE ECB VIOLATION 39046225H.
S00654945-P1
12/30/2024
Filed — Alteration
REGISTER BOILER TO OBTAIN BOILER DIVISION INSPECTION AND SIGN-OFF.
S00654923-P1
12/20/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
12/20/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/20/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/20/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/20/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/20/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
09/13/2024
Permit issued — Boiler Equipment
S00654945-I1-BE
09/13/2024
Permit issued — Boiler Equipment
S00654923-I1-BE
04/16/2024
Violation issued (HPD, closed)
A
03/27/2023
Permit issued — Boiler Equipment
S00654945-I1-BE
03/27/2023
Permit issued — Boiler Equipment
S00654923-I1-BE
03/29/2022
Permit issued — Boiler Equipment
S00654923-I1-BE
03/29/2022
Permit issued — Boiler Equipment
S00654945-I1-BE
03/08/2022
Violation issued (HPD, closed)
A
02/14/2022
Filed — Alteration
REGISTER BOILER TO OBTAIN BOILER DIVISION INSPECTION AND SIGN-OFF.
S00654923-I1
02/14/2022
Filed — Alteration
REGISTER BOILER TO OBTAIN INSPECTION AND SIGN-OFF TO RESOLVE ECB VIOLATION 39046225H.
S00654945-I1
08/18/2021
Violation issued (ECB, open)
Boilers
07/22/2021
Violation issued (HPD, closed)
A
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
A
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, closed)
B
07/22/2021
Violation issued (HPD, open)
B
07/22/2021
Violation issued (HPD, open)
B
04/16/2021
Violation issued (HPD, closed)
A
09/03/2020
Violation issued (HPD, closed)
B
01/21/2014
Violation issued (HPD, closed)
A
01/21/2014
Violation issued (HPD, closed)
B
01/21/2014
Violation issued (HPD, closed)
B
01/21/2014
Violation issued (HPD, closed)
B
02/19/2013
Violation issued (HPD, closed)
C
02/19/2013
Violation issued (HPD, closed)
B
02/19/2013
Violation issued (HPD, closed)
C
02/19/2013
Violation issued (HPD, closed)
B
02/19/2013
Violation issued (HPD, closed)
A
02/19/2013
Violation issued (HPD, closed)
B
09/21/2012
Violation issued (HPD, closed)
B
09/21/2012
Violation issued (HPD, closed)
C
09/21/2012
Violation issued (HPD, closed)
C
09/21/2012
Violation issued (HPD, closed)
A
02/11/2011
Violation issued (HPD, closed)
A
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC11/13/2025
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC11/13/2025
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC09/13/2024
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC09/13/2024
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC03/27/2023
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC03/27/2023
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC03/29/2022
DOB NOWBoiler EquipmentSigned-offP.H. WORKS INC03/29/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/14/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
08/28/2025Heating SystemsLOUIS ARENAspecial
08/28/2025HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
08/28/2025HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/28/2025Maintenance informationLOUIS ARENAenergy_progress
08/28/2025HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
08/28/2025Heating SystemsLOUIS ARENAspecial
08/01/2025Heating SystemsLOUIS ARENAspecial
08/01/2025Heating SystemsLOUIS ARENAspecial
08/01/2025HVAC-R and service water piping design and insulation—energy_progress
08/01/2025HVAC-R and service water heating system controls—energy_progress
08/01/2025Maintenance informationLOUIS ARENAenergy_progress
08/01/2025HVAC-R and service water heating equipment—energy_progress
12/20/2024Heating SystemsLOUIS ARENAspecial
12/20/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/20/2024Maintenance informationLOUIS ARENAenergy_progress
12/20/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/20/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/20/2024Heating SystemsLOUIS ARENAspecial
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/24/2026S00654945-P2Request digital key ↗
08/24/2026S00654945-P1Request digital key ↗
08/24/2026S00654945-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature7
09/25/2026S00654923-P3Open ↗
09/23/2026S00654923-I1Open ↗
09/23/2026S00654923-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026S00654945-I1Open ↗
08/24/2026S00654945-P2Open ↗
08/24/2026S00654945-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026S00654923-P3Open ↗
09/23/2026S00654923-I1Open ↗
09/23/2026S00654945-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/24/2026S00654945-P2Open ↗
08/24/2026S00654945-P1Open ↗
08/24/2026S00654945-I1Open ↗
Showing 3 of 6 on file for this type