← Back
Old law tenement
150 WEST 141 STREET
MANHATTAN · Harlem (North) · BIN 1060071
💬 Discuss this project
1910Year Built
5Stories
C4Building Class
R7-2Zoning
10,770 sfGross Floor Area
22Units
Rent Stabilized27 Open Violations 24 unresolved · 3 paperwork only ▸
Old law tenement · Owner of record: NYC HOUSING PRESERVATION AND DEVELOPMENT · 2,798 sf lot · 3.85 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction8p · 1 filing · 9 docs
Floor 5Under Construction41p · 2 filings · 20 docs
Floor 4Under Construction37p · 2 filings · 20 docs
Floor 3Under Construction37p · 2 filings · 20 docs
Floor 2Under Construction38p · 2 filings · 20 docs
Floor 1Under Construction40p · 2 filings · 20 docs
CellarUnder Construction48p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY404/09/2026
NYC HOUSING PRESERVATION AND DEVELOPMENT103/22/2026
HOUSING PRESERVATION & DE303/22/2026
NYC DEPT OF HOUSING PRESERVATION103/21/2026
CITY OF NEW YORK203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BANGASH ASSOCIATES INC.111/03/2025
BODY-LAWSON ASSOCIATES608/01/2025
ASR ENGINEERING PC112/03/2024
ASHRAF CORP110/17/2021
BRAD E. COHEN, PE101/07/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TAG TEAM GROUP LLC1203/21/2026
ABC PERMIT EXPEDITING403/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHAMAS CONTRACTING CO.INCGeneral Contractor307/08/2026
BARRY KAPLOWITZElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor104/09/2026
MARK CONTRACTING NY INCGeneral Contractor107/08/2026
BLAZE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054112/03/2024
METRIC CONSULTING AND INS1803308/07/2024
Building Lifecycle
All (92)Filed (10)Permit Issued (7)Violation (45)Inspection (2)Special Inspection (28)
04/14/2026
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
04/14/2026
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
03/13/2026
Permit issued — Plumbing
M01222557-I1-PL
02/06/2026
Permit issued — General Construction
M00534603-I1-GC
01/29/2026
Permit issued — Foundation
M00534603-S1-FO-EA
12/30/2025
Permit issued — Structural
M00534603-S2-ST
12/19/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/05/2025
Permit issued — Sidewalk Shed
M01312361-I1-SH
11/03/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01312361-I1
08/01/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER AS PER PLANS FIED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01222557-S2
06/09/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER AS PER PLANS FIED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01222557-S1
06/06/2025
Filed — Alteration
APPLICATION FILED FOR PLUMBING AND SPRINKLER AS PER PLANS FIED HEREWITH. NO CHANGE IN USE OCCUPANCY OR EGRESS.
M01222557-I1
05/07/2025
Special inspection requirement — Sprinkler Systems
03/18/2025
Violation issued (ECB, open)
Construction
01/10/2025
Special inspection requirement — Subgrade Inspections
SAMI HAJJAR P.E
01/10/2025
Special inspection requirement — Concrete - Cast-In-Place
SAMI HAJJAR P.E
01/10/2025
Special inspection requirement — Underpinning
SAMI HAJJAR P.E
12/06/2024
Permit issued — General Construction
M01146289-I1-GC
12/03/2024
Filed — Alteration
M01146289-I1
08/07/2024
Filed — Alteration CO
M00534603-S2
08/07/2024
Filed — Alteration CO
M00534603-S1
12/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Masonry
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Structural Steel - High Strength Bolting
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Structural Wood Frame
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Structural Steel - Details
SAMI HAJJAR P.E
10/30/2023
Special inspection requirement — Structural Steel - Welding
SAMI HAJJAR P.E
10/20/2023
Special inspection requirement — Footing and Foundation
SAMI HAJJAR P.E
10/20/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
10/20/2023
Special inspection requirement — Final
SAMI HAJJAR P.E
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/2023
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
A
02/11/2022
Violation issued (ECB, open)
Boilers
10/17/2021
Filed — Alteration
Replace deteriorated metal stairs from sidewalk to cellar in front airway. no changes to uses, egress or occupancy.
M00600603-I1
09/30/2021
Filed — Alteration CO
M00534603-I1
09/30/2021
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Fire-Resistance Rated Construction
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Interior lighting power
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Insulation placement and R values
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Lighting controls
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Lighting in dwelling units
SAMI HAJJAR P.E
09/30/2021
Special inspection requirement — Vestibules
SAMI HAJJAR P.E
09/26/2021
Special inspection requirement — Energy Code Compliance Inspections
Jay Kavi
09/26/2021
Special inspection requirement — Final
Jay Kavi
04/02/2021
Violation issued (HPD, closed)
I
04/02/2021
Violation issued (HPD, closed)
A
01/07/2020
Filed — Alteration
REPLACE EXISTING LOW PRESSURE BOILER & OIL BURNER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY INVOLVED UNDER THIS APPLICATION.
M00244946-I1
01/07/2020
Permit issued — Boiler Equipment
M00244946-I1-BE
11/08/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2019
Violation issued (HPD, closed)
I
10/11/2019
Special inspection requirement — Maintenance information
Brad Cohen
10/11/2019
Special inspection requirement — HVAC and service water heating system controls
Brad Cohen
10/11/2019
Special inspection requirement — HVAC and service water heating equipment
Brad Cohen
04/02/2019
Violation issued (ECB, open)
Boilers
10/27/2016
Violation issued (HPD, closed)
I
10/02/2015
Violation issued (HPD, closed)
I
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBLAZE PLUMBING & HEATING03/13/2026
DOB NOWGeneral ConstructionPermit IssuedSHAMAS CONTRACTING CO.INC02/06/2026
DOB NOWFoundationPermit IssuedSHAMAS CONTRACTING CO.INC01/29/2026
DOB NOWStructuralPermit IssuedSHAMAS CONTRACTING CO.INC12/30/2025
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP11/05/2025
DOB NOWGeneral ConstructionPermit IssuedMARK CONTRACTING NY INC12/06/2024
DOB NOWBoiler EquipmentPermit IssuedPACIFIC ENERGY CORP01/07/2020
BISEQISSUEDB & S RESTORATION INC04/08/2010
BISOTISSUEDPRECISION COMBUST. CONSUL. INC05/23/2005
BISOTISSUEDBLK IRON & CONST WORKS09/24/1999
1 project · most recent 08/01/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/01/2025——Heating and Air Conditioning Systems
Heat / Cool
Lg LG-ARUM072BTE5 6 tons · Vrf Outdoor ×2
LG-ARUM121BTE5 10 tons · Vrf Outdoor ×2
LG-ARUM144BTE5 12 tons · Vrf Outdoor ×1
LG-ARUN024GSS4 2 tons · Vrf Outdoor ×1
1 project · most recent 08/01/2025
FiledStatusContractorScope
08/01/2025———
1 project · most recent 08/01/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/01/2025Permit IssuedBLAZE PLUMBING & HEATINGGas, Storm, Water/Sanitary
4 projects · most recent 07/31/2026
General Wiring
FiledStatusContractorScope
07/31/2026Permit IssuedBASS ELECTRICAL CORP.General Wiring
07/24/2026Permit IssuedBASS ELECTRICAL CORP.—
04/17/2024CompleteGREEN POWER ELECTRIC CORP—
03/05/2024Permit IssuedDELTEX ELECTRICAL CONT. I23 meters
1 project · most recent 11/03/2025
Sidewalk Shed
FiledStatusContractorScope
11/03/2025Permit IssuedACE GROUP NY CORPSidewalk Shed
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/14/2026Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
04/14/2026Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
05/07/2025Sprinkler Systems—special
01/10/2025Subgrade InspectionsSAMI HAJJAR P.Especial
01/10/2025Concrete - Cast-In-PlaceSAMI HAJJAR P.Especial
01/10/2025UnderpinningSAMI HAJJAR P.Especial
12/14/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/30/2023Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
10/30/2023MasonrySAMI HAJJAR P.Especial
10/30/2023Structural Steel - High Strength BoltingSAMI HAJJAR P.Especial
10/30/2023Structural Wood FrameSAMI HAJJAR P.Eprogress
10/30/2023Structural Steel - DetailsSAMI HAJJAR P.Especial
10/30/2023Structural Steel - WeldingSAMI HAJJAR P.Especial
10/20/2023Footing and FoundationSAMI HAJJAR P.Eprogress
10/20/2023FinalSAMI HAJJAR P.Eprogress
10/20/2023FinalSAMI HAJJAR P.Eprogress
09/30/2021Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
09/30/2021Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
09/30/2021Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
09/30/2021Fire-Resistance Rated ConstructionSAMI HAJJAR P.Eprogress
09/30/2021Interior lighting powerSAMI HAJJAR P.Eenergy_progress
09/30/2021Insulation placement and R valuesSAMI HAJJAR P.Eenergy_progress
09/30/2021Lighting controlsSAMI HAJJAR P.Eenergy_progress
09/30/2021Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
09/30/2021VestibulesSAMI HAJJAR P.Eenergy_progress
09/26/2021Energy Code Compliance InspectionsJay Kaviprogress
09/26/2021FinalJay Kaviprogress
Latest 25 of 28.
▾Documents — 62 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026M00600603-I1Request digital key ↗
08/26/2026M00534603-S2Request digital key ↗
08/26/2026M00534603-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/05/2026M00244946-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/08/2010120313712Open ↗
▸BISWORK PERMIT APPLICATION1
04/08/2010120313712Open ↗
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/03/2026M00600603-I1Open ↗
08/26/2026M00534603-S2Open ↗
08/26/2026M00534603-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/23/2026M00244946-I1Open ↗
09/23/2026M00244946-I1Open ↗
09/23/2026M00244946-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026M00534603-S2Open ↗
09/01/2026M00534603-S1Open ↗
09/01/2026M00534603-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/19/2010120313712Open ↗
04/08/2010120313712Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/08/2010120313712Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
04/08/2010120313712Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan1
08/13/2026M00244946-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/26/2026M00534603-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
08/26/2026M00534603-S1Open ↗
08/26/2026M00534603-S2Open ↗
08/26/2026M00534603-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
04/08/2010120313712Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00244946-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
09/03/2026M00600603-I1Open ↗
08/26/2026M00534603-S2Open ↗
08/26/2026M00534603-S1Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/19/2010120313712Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/19/2010120313712Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
04/08/2010120313712Open ↗
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)1
09/03/2026M00600603-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/08/2010120313712Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00534603-S1Open ↗