← Back
Office with commercial, 7-19 stories
150 WEST 22 STREET
MANHATTAN · BIN 1014781
💬 Discuss this project
1910Year Built
12Stories
O6Building Class
C6-3AZoning
73,611 sfGross Floor Area
12Units
LL97 Covered1 Open Violation ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: WIN PROPERTY MANAGEMENT LLC · 6,172 sf lot · 11.93 FAR built · Flood zone X
Locations of Work
Mechanical
Roof3p · 3 filings · 20 docs
Floor 71p · 1 filing · 9 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M RAPAPORT1109/13/2026
PHOENIX SUTTON STR INC503/22/2026
WIN PROPERTY MANAGEMENT3703/22/2026
CANIDO BASONAS CONST SVC103/22/2026
M. RAPAPORT CO. IWC103/22/2026
WIN REALTY CO & RAPPAPORT103/22/2026
WINN PROPERTIES MGMT LLC103/22/2026
DEBONO BUILDERS103/22/2026
WINREALTYCO.C/O M. RAPAPORT CO.303/21/2026
EMPIRE SCAFFOLDING SYSTEMS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN GROUP IN H&K LLC107/14/2026
AJ ALDUINO CONSULTING ENGINEER103/10/2025
GREEN DESIGN103/09/2021
CATALDO ENGINEERING, P.C.103/01/2021
VINCENT J. LIOTTA P.E.211/13/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RPO203/21/2026
MUNICIPAL BUILDING CONSULTANTS103/21/2026
VINCENT J. LIOTTA P.E.203/21/2026
VINCENT J. LIOTTA P. E.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RUN RITE MECHANICAL CORPGeneral Contractor507/08/2026
CANIDO BASONAS CONST SVCGeneral Contractor303/21/2026
PHOENIX SUTTON STR INCGeneral Contractor203/21/2026
JJD ELEC'L SERV. & INST CElectrical103/22/2026
ABRAHAM POLLElectrical103/21/2026
FRESH AIRE MECHANICAL INCGeneral Contractor107/25/2026
ECS ELEC'L CONTG SERV INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DESIGN GROUP IN H&K LLC1363107/14/2026
ROYAL CONSTRUCTION P.E. S462103/10/2025
VINCENT J. LIOTTA P. E.1974211/13/2020
Building Lifecycle
All (127)Filed (6)Permit Issued (6)Signed Off (6)Facade (FISP) (12)Violation (60)Objection (10)Special Inspection (27)
07/27/2026
Signed off — Alteration
Filing to replace roof conditioning units with associated ductwork on the 3rd floor. No change to egress, use, or occupancy
M01381506-I1
07/22/2026
Permit issued — Mechanical Systems
M01381506-I1-MS
07/14/2026
Filed — Alteration
Filing to replace roof conditioning units with associated ductwork on the 3rd floor. No change to egress, use, or occupancy
M01381506-I1
04/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
SUKHWAN KIM
04/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SUKHWAN KIM
04/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
SUKHWAN KIM
04/01/2026
Special inspection requirement — Energy Code Compliance Inspections
SUKHWAN KIM
04/01/2026
Special inspection requirement — Mechanical Systems
SUKHWAN KIM
04/01/2026
Special inspection requirement — Final
SUKHWAN KIM
08/07/2025
Signed off — Alteration
Filing to install indoor ceiling cassette air conditioning units with associated ductwork and refrigerant piping serving 9th floor and install condensing unit on roof as per plans submitted. No change to egress, use, or occupancy.
M01190872-I1
04/29/2025
Permit issued — Mechanical Systems
M01190872-I1-MS
04/04/2025
Objection resolved — Addressed
04/04/2025
Objection resolved — Addressed
04/01/2025
Objection raised — Fire_Protection
03/23/2025
Objection resolved — Addressed
03/23/2025
Objection resolved — Addressed
03/23/2025
Objection resolved — Addressed
03/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
EBRAHIM MIANDOABI
03/23/2025
Special inspection requirement — Electrical motors and elevators
EBRAHIM MIANDOABI
03/23/2025
Special inspection requirement — HVAC-R and service water heating system controls
EBRAHIM MIANDOABI
03/23/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
EBRAHIM MIANDOABI
03/23/2025
Special inspection requirement — Ventilation and air distribution system
EBRAHIM MIANDOABI
03/18/2025
Objection raised — Mechanical
03/18/2025
Objection raised — Energy
03/18/2025
Objection raised — Scope
03/18/2025
Objection raised — Scope
03/10/2025
Filed — Alteration
Filing to install indoor ceiling cassette air conditioning units with associated ductwork and refrigerant piping serving 9th floor and install condensing unit on roof as per plans submitted. No change to egress, use, or occupancy.
M01190872-I1
03/06/2025
Special inspection requirement — Final
EBRAHIM MIANDOABI
03/06/2025
Special inspection requirement — Mechanical Systems
EBRAHIM MIANDOABI
01/06/2022
Cycle 9 facade report submitted
01/06/2022
Cycle 9 facade report signed — SAFE
12/09/2021
Cycle 9 facade inspection completed
11/12/2021
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00477080-I1
10/13/2021
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00482764-I1
06/14/2021
Violation issued (ECB, closed)
Construction
04/09/2021
Permit issued — General Construction
M00477080-I1-GC
03/10/2021
Permit issued — Sidewalk Shed
M00482764-I1-SH
03/09/2021
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00482764-I1
03/09/2021
Special inspection requirement — Final
Sunil Saigal
03/01/2021
Filed — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M00477080-I1
02/26/2021
Special inspection requirement — Final
Thomas Cataldo
12/09/2020
Signed off — Alteration
LEGALIZATION OF 12 UNITS ON THE 2ND FLOOR SETBACK ROOF AND ROOF WITH A TOTAL CAPACITY OF 90.2 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00412677-I1
11/13/2020
Filed — Alteration
LEGALIZATION OF 12 UNITS ON THE 2ND FLOOR SETBACK ROOF AND ROOF WITH A TOTAL CAPACITY OF 90.2 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M00412677-I1
11/13/2020
Permit issued — Mechanical Systems
M00412677-I1-MS
10/13/2020
Special inspection requirement — Mechanical Systems
Vincent Liotta
10/13/2020
Special inspection requirement — Final
Vincent Liotta
10/13/2020
Special inspection requirement — HVAC and service water heating system controls
Vincent Liotta
10/13/2020
Special inspection requirement — HVAC insulation and sealing
Vincent Liotta
10/13/2020
Special inspection requirement — HVAC and service water heating equipment
Vincent Liotta
10/13/2020
Special inspection requirement — Maintenance information
Vincent Liotta
05/08/2020
Signed off — Alteration
INSTALLATION OF NEW AC UNITS ON STEEL LOCATED ON THE 4TH FLOOR AND TOP OF THE ROOF WITH A TOTAL COOLING CAPACITY OF 16 TONS.
M00303409-I1
02/21/2020
Filed — Alteration
INSTALLATION OF NEW AC UNITS ON STEEL LOCATED ON THE 4TH FLOOR AND TOP OF THE ROOF WITH A TOTAL COOLING CAPACITY OF 16 TONS.
M00303409-I1
02/21/2020
Permit issued — Mechanical Systems
M00303409-I1-MS
01/24/2020
Special inspection requirement — HVAC and service water heating equipment
Vincent Liotta
01/24/2020
Special inspection requirement — Maintenance information
Vincent Liotta
01/24/2020
Special inspection requirement — HVAC insulation and sealing
Vincent Liotta
01/24/2020
Special inspection requirement — HVAC and service water heating system controls
Vincent Liotta
01/24/2020
Special inspection requirement — Final
Vincent Liotta
01/24/2020
Special inspection requirement — Mechanical Systems
Vincent Liotta
11/15/2019
Violation issued (ECB, closed)
Construction
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offFRESH AIRE MECHANICAL INC07/22/2026
DOB NOWMechanical SystemsSigned-offRUN RITE MECHANICAL CORP04/29/2025
DOB NOWGeneral ConstructionSigned-offCANIDO BASONAS CONST SVC04/09/2021
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC03/10/2021
DOB NOWMechanical SystemsSigned-offRUN RITE MECHANICAL CORP11/13/2020
DOB NOWMechanical SystemsSigned-offRUN RITE MECHANICAL CORP02/21/2020
BISOTISSUEDROSMIL TILE & PAINTING CO09/13/2022
BISOTISSUEDNICK WHITE CONSTRUCTION11/25/2019
BISOTISSUEDDEBONO BROS. BUILDERS & D07/13/2018
BISOTISSUEDPENTINCO GROUP NYC INC06/05/2018
BIS—ISSUEDWIN PROPERTY MANAGEMENT LLC05/10/2018
BISSPISSUEDASCO SPRINKLER CO.,INC03/30/2018
BISOTISSUEDCANIDO BASONAS CONSTRUCTI03/30/2017
BISOTISSUEDCANIDO BASONAS CONSTRUCTI03/02/2017
BISEQISSUEDPHOENIX SUTTON STR INC02/17/2017
BISOTISSUEDREIDY CONTRACTING GROUP03/18/2016
BISEQISSUEDREIDY CONTRACTING GROUP03/18/2016
BISOTISSUEDREIDY CONTRACTING GROUP10/14/2014
BISSPISSUEDR.J.C. MECHANICAL CORP06/17/2014
BISPLISSUEDARIANA CONTRACTING INC05/29/2014
BISOTISSUEDPRO TECH RENOVATIONS INC05/22/2014
BISPLISSUEDSEAN COAKLEY P & H INC05/08/2014
BISMHISSUEDREIDY CONTRACTING GROUP05/07/2014
BISOTISSUEDREIDY CONTRACTING GROUP05/07/2014
BISEQISSUEDREIDY CONTRACTING GROUP05/07/2014
BISOTISSUEDSOUND MAINTENANCE INC01/29/2014
BISOTISSUEDSOUND MAINTENANCE INC07/26/2012
BISOTISSUEDSOUND MAINTENANCE INC07/26/2012
BISPLISSUEDMETROCITY GROUP,INC07/20/2012
BISOTISSUEDSOUND MAINTENANCE INC07/11/2012
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM07/06/2012
BISOTISSUEDSOUND MAINTENANCE INC05/26/2011
BISOTISSUEDSOUND MAINTENANCE INC05/26/2011
BISOTISSUEDLEGACY BUILDERS/DEVELOPERS CORP07/21/2009
BISOTISSUEDSOUND MAINTENANCE INC07/20/2006
BISEQISSUEDEMPIRE SCAFFOLDING SYSTEM05/05/2006
BISMHISSUEDGIANCOLA CONTRACTORS INC09/22/2004
BISOTISSUEDGIANCOLA CONTRACTORS INC09/22/2004
BISSPISSUEDPARKSET PLBG CO INC09/17/2004
BISFSISSUEDRICHARD MORTMAN09/26/2003
+ 6 more permits on file
1 project · most recent 07/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2026Signed-offFRESH AIRE MECHANICAL INCHeating and Air Conditioning Systems
Heat / Cool
Lg ZRNU483BBAA 51,200 BTU · Vrf Indoor ×2
ZRUM096BTE6 108,000 BTU · Vrf Outdoor ×2
ZRNU963B8AA 107,500 BTU · Vrf Outdoor ×1
6 projects · most recent 02/13/2026
General Wiring
FiledStatusContractorScope
02/13/2026CompleteALLIANCE ELEVATOR COMPANY—
07/14/2025Permit IssuedCURRENT POWER ELECTRICGeneral Wiring
02/28/2022CompleteJJD ELEC'L SERV. & INST CGeneral Wiring
03/02/2021CompleteELPO ELECTRICAL CONTG INC—
03/02/2021CompleteELPO ELECTRICAL CONTG INC—
08/03/2018CompleteECS ELEC'L CONTG SERV INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
04/01/2026HVAC-R and service water heating system controlsSUKHWAN KIMenergy_progress
04/01/2026HVAC-R and service water piping design and insulationSUKHWAN KIMenergy_progress
04/01/2026HVAC-R and service water heating equipmentSUKHWAN KIMenergy_progress
04/01/2026Energy Code Compliance InspectionsSUKHWAN KIMprogress
04/01/2026Mechanical SystemsSUKHWAN KIMspecial
04/01/2026FinalSUKHWAN KIMprogress
03/23/2025HVAC-R and service water heating equipmentEBRAHIM MIANDOABIenergy_progress
03/23/2025Electrical motors and elevatorsEBRAHIM MIANDOABIenergy_progress
03/23/2025HVAC-R and service water heating system controlsEBRAHIM MIANDOABIenergy_progress
03/23/2025HVAC-R and service water piping design and insulationEBRAHIM MIANDOABIenergy_progress
03/23/2025Ventilation and air distribution systemEBRAHIM MIANDOABIenergy_progress
03/06/2025FinalEBRAHIM MIANDOABIprogress
03/06/2025Mechanical SystemsEBRAHIM MIANDOABIspecial
03/09/2021FinalSunil Saigalprogress
02/26/2021FinalThomas Cataldoprogress
10/13/2020Mechanical SystemsVincent Liottaspecial
10/13/2020FinalVincent Liottaprogress
10/13/2020HVAC and service water heating system controls Vincent Liottaenergy_progress
10/13/2020HVAC insulation and sealing Vincent Liottaenergy_progress
10/13/2020HVAC and service water heating equipment Vincent Liottaenergy_progress
10/13/2020Maintenance informationVincent Liottaenergy_progress
01/24/2020HVAC and service water heating equipmentVincent Liottaenergy_progress
01/24/2020Maintenance informationVincent Liottaenergy_progress
01/24/2020HVAC insulation and sealingVincent Liottaenergy_progress
01/24/2020HVAC and service water heating system controlsVincent Liottaenergy_progress
Latest 25 of 27.
▾Documents — 356 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch4
09/04/2026M00477080-I1Request digital key ↗
09/04/2026M00482764-I1Request digital key ↗
08/16/2026M01381506-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00303409-I1Request digital key ↗
09/04/2026M00412677-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00477080-I1Request digital key ↗
▸Applications & Permits67
▸BISPLAN / WORK APPROVAL APPLICATION38
03/01/2024122763278Open ↗
02/15/2024122763278Open ↗
09/21/2023122763278Open ↗
Showing 3 of 38 on file for this type
▸BISWORK PERMIT APPLICATION29
09/14/2022123844625Open ↗
12/24/2019123865549Open ↗
11/26/2019123844625Open ↗
Showing 3 of 29 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISVERIFY TAX LOT3
11/18/2022122763278Open ↗
11/18/2022122763278Open ↗
11/18/2022122763278Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/18/2022122763278Open ↗
▸Seals & Professional Certifications88
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION32
12/24/2019123865549Open ↗
12/24/2019123865549Open ↗
12/17/2019123865549Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature21
09/01/2026M01190872-I1Open ↗
09/01/2026M01190872-I1Open ↗
09/01/2026M01190872-I1Open ↗
Showing 3 of 21 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST10
12/17/2019123865549Open ↗
11/26/2019123844625Open ↗
05/09/2018123433828Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
12/17/2019123865549Open ↗
07/11/2018140783427Open ↗
05/09/2018123433828Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/16/2026M01381506-I1Open ↗
08/13/2026M01190872-I1Open ↗
08/13/2026M00477080-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026M01190872-I1Open ↗
08/24/2026M01381506-I1Open ↗
08/24/2026M00412677-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
07/11/2018140783427Open ↗
02/16/2017140606538Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/11/2018140783427Open ↗
02/16/2017140606538Open ↗
▸Trade Schedules & Equipment13
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/11/2019123078203Open ↗
10/10/2018122880427Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
09/06/2017121993968Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
09/06/2017121993968Open ↗
▸Safety & Tenant Protection6
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
12/24/2019123865549Open ↗
12/19/2019123865549Open ↗
▸BISSTREET TREE CHECKLIST2
05/11/2018122763278Open ↗
Showing 1 of 2 on file for this type
▸BISSTREET TREE SIGNOFF1
09/08/2022122763278Open ↗
▸BISTenant Protection Plan and Notes1
11/26/2019123844625Open ↗
▸Environmental & Asbestos19
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
12/17/2019123865549Open ↗
11/26/2019123844625Open ↗
11/26/2019123844625Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/16/2026M01381506-I1Open ↗
08/13/2026M01190872-I1Open ↗
08/13/2026M00477080-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
12/24/2019123865549Open ↗
12/17/2019123865549Open ↗
11/26/2019123844625Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
10/02/2020123865549Open ↗
09/22/2020123865549Open ↗
12/13/2018140783427Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/02/2020123865549Open ↗
09/22/2020123865549Open ↗
07/11/2018140783427Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
11/15/2022123844625Open ↗
11/15/2022123844625Open ↗
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINTERIOR LIGHTING POWER1
11/15/2022123844625Open ↗
▸BISFENESTRATION AIR LEAKAGE1
11/15/2022123844625Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/11/2018140783427Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/15/2022123844625Open ↗
▸BISFENESTRATION AREAS1
11/15/2022123844625Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/15/2022123844625Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/16/2017140606538Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00412677-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/02/2020123865549Open ↗
10/02/2020123865549Open ↗
09/22/2020123865549Open ↗
Showing 3 of 6 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/15/2022123844625Open ↗
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
11/16/2022123844625Open ↗
10/02/2020123865549Open ↗
01/11/2019123078203Open ↗
Showing 3 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
09/13/2023122763278Open ↗
07/06/2023122763278Open ↗
04/19/2016122763278Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY2
10/30/2023122763278Open ↗
10/30/2023122763278Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER2
09/14/2022123844625Open ↗
05/22/2018121993968Open ↗
▸Cost, Insurance & Ownership33
▸BISCOST AFFIDAVIT30
11/03/2022123844625Open ↗
10/02/2020123865549Open ↗
09/22/2020123865549Open ↗
Showing 3 of 30 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/15/2022123844625Open ↗
11/15/2022123844625Open ↗
11/08/2022122763278Open ↗
▸Filing & Intake Forms43
▸BISEFILING COVER SHEET15
12/17/2019123865549Open ↗
11/26/2019123844625Open ↗
05/09/2018123433828Open ↗
Showing 3 of 15 on file for this type
▸BISBOROUGH INTAKE FORM14
09/14/2022123844625Open ↗
12/30/2019123865549Open ↗
01/11/2019123078203Open ↗
Showing 3 of 14 on file for this type
▸BISADDITIONAL INFORMATION11
09/21/2023122763278Open ↗
03/04/2023122763278Open ↗
11/08/2021122763278Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
07/11/2018140783427Open ↗
02/16/2017140606538Open ↗
Showing 2 of 3 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/19/2023122763278Open ↗
04/19/2016122763278Open ↗
▸BISPLOT DIAGRAM1
04/19/2016122763278Open ↗