Condo, residential unit in elevator building
150 WEST 82ND STREET
MANHATTAN · BIN 1032037
💬 Discuss this project
1926Year Built
10Stories
R4Building Class
R8BZoning
45,042 sfGross Floor Area
38Units
LL97 CoveredRent Stabilized11 Active Violations 10 unresolved · 1 paperwork only ▸FISP: UNSAFE
Condo, residential unit in elevator building · Owner of record: 150 West 82nd Street Owner · 7,662 sf lot · 5.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade repairs11p · 4 filings · 19 docs
PenthousePenthouse gas and plumbing work7p · 1 filing · 6 docs
Floor 10Temporary suspended scaffold installation1p · 1 filing · 4 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1Pipe scaffold1p · 1 filing · 4 docs
CellarStandpipe work with new control valve1 filing · 5 docs
Site & exteriorFacade repairs15p · 5 filings · 20 docs
Filed — no permit issuedIndependent protected bulkhead wraps5p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Thor-Go 150 West 82nd Street4603/21/2026
150 West 82nd Street Owner1903/22/2026
150 West 82nd St Realty1603/21/2026
Mann Realty Association803/21/2026
Slate PG303/22/2026
Slate Property Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service803/21/2026
Atlantic Building Supply403/21/2026
Lombardo Building Consultants403/21/2026
Skyline Access103/21/2026
JM Zoning103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRD GroupScaffold2807/08/2026
Gilston Brothers Elect'lElectrical903/21/2026
Dennison ElectricElectrical603/22/2026
Crown RestorationGeneral Contractor503/21/2026
Advanced Construction EquipmentScaffold507/08/2026
New York Pro InteriorsGeneral Contractor303/21/2026
Shalbro Construction GroupScaffold303/21/2026
Danube ElectricElectrical303/22/2026
Shallu ConstructionScaffold203/21/2026
Orbit Plumbing & HeatingPlumbing203/21/2026
DoriaScaffold203/21/2026
Eastbrook ContractingGeneral Contractor203/21/2026
Practical Plumbing & HeatingPlumbing107/08/2026
Star Electrical ContractorsElectrical103/22/2026
Billy ContractorsGeneral Contractor103/21/2026
Deskon ContractingGeneral Contractor103/21/2026
Lilly ConstructionGeneral Contractor103/21/2026
Royal Concrete and Masonspecialty_contractor106/27/2026
Sammys RestorationGeneral Contractor103/21/2026
Trident RestorationGeneral Contractor103/21/2026
Orbit SprinklerFire Protection107/08/2026
Adamjohn & SonsPlumbing107/19/2012
Airedale InteriorsGeneral Contractor207/13/2012
All Pro Plumbing and HeatingPlumbing106/12/2013
B H & B ConstructionGeneral Contractor306/18/2013
Full Scale ContractingGeneral Contractor206/26/2015
Ganic Plumbing & HeatingPlumbing310/17/2017
Mann Reality AssociationGeneral Contractor110/27/2004
Man Realty AssoclGeneral Contractor107/20/2004
Millenium Cent ContractingGeneral Contractor309/12/2024
NY Pro InteriorsGeneral Contractor611/08/2017
Pelham Plumbing & HeatingPlumbing112/13/2011
Peroleum Tank CleanersGeneral Contractor105/12/2005
PRD GroupGeneral Contractor112/08/2020
Sammy's RestorationGeneral Contractor102/04/1999
Shannon ContractingGeneral Contractor106/18/2015
Tri ContractingGeneral Contractor310/11/2022
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EC Special Inspections8355108/19/2026
Socotec Engineering4983103/26/2026
Skyline Engineering267105/18/2022
Clarke Engineering Services3795201/19/2022
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 10, sub-cycle C)
The filing window opened 02/21/2027. 3 Cycle 10 filings on record, latest 07/30/2026, status Unsafe
11/04/2026
Signed off — Alteration
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01359364-I1
08/19/2026
Filed — Alteration
REPLACE DOMESTIC WATER TANK WITH A SMALLER TANK ON THE ROOF.
M01437434-I1
07/30/2026
Cycle 10 facade report submitted
07/28/2026
Cycle 10 facade report signed — SWARMP
280 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRoyal Concrete and Mason06/25/2026
DOB NOWPlumbingSigned-offPractical Plumbing & Heating05/18/2023
DOB NOWSidewalk ShedSigned-offPRD Group10/14/2022
DOB NOWSupported ScaffoldSigned-offPRD Group10/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offDoria06/29/2022
DOB NOWStandpipeSigned-offOrbit Sprinkler06/01/2022
DOB NOWSidewalk ShedSigned-offPRD Group10/20/2021
DOB NOWSupported ScaffoldSigned-offPRD Group10/20/2021
DOB NOWSupported ScaffoldSigned-offPRD Group07/19/2021
DOB NOWSidewalk ShedSigned-offPRD Group07/19/2021
DOB NOWSupported ScaffoldSigned-offPRD Group05/28/2021
DOB NOWSidewalk ShedSigned-offPRD Group05/26/2021
DOB NOWSidewalk ShedSigned-offPRD Group11/06/2020
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment11/05/2020
DOB NOWSupported ScaffoldSigned-offPRD Group10/15/2020
DOB NOWSupported ScaffoldSigned-offPRD Group06/01/2020
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment03/27/2020
DOB NOWSupported ScaffoldSigned-offPRD Group12/12/2019
DOB NOWSidewalk ShedSigned-offAdvanced Construction Equipment12/06/2019
DOB NOWSupported ScaffoldSigned-offShalbro Construction Group08/28/2019
DOB NOWSidewalk ShedSigned-offCoastal Points Construction02/04/2019
BISOTISSUEDMillenium Cent Contracting09/12/2024
BISPLISSUEDOrbit Plumbing & Heating04/19/2023
BISOTISSUEDTri Contracting10/11/2022
BIS—ISSUEDTri Contracting08/17/2022
BISOTISSUEDTri Contracting08/15/2022
BISPLISSUEDOrbit Plumbing & Heating01/13/2022
BIS—ISSUEDCrown Restoration11/02/2021
BISOTISSUEDCrown Restoration08/05/2021
BISOTISSUEDCrown Restoration02/10/2021
BISEQISSUEDPRD Group12/08/2020
BIS—ISSUEDCrown Restoration11/12/2020
BISPLISSUEDOrbit Plumbing & Heating11/10/2020
BISPLISSUEDOrbit Plumbing & Heating11/09/2020
BIS—ISSUEDCrown Restoration08/18/2020
BISOTISSUEDMillenium Cent Contracting05/14/2020
BISOTISSUEDCrown Restoration02/27/2020
BISOTISSUEDCrown Restoration02/27/2020
BISOTISSUEDCrown Restoration02/27/2020
BISOTISSUEDCrown Restoration02/27/2020
+ 31 more permits on file
1 project · most recent 08/19/2026
Water/Sanitary
FiledStatusContractorScope
08/19/2026——Water/Sanitary
25 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026Permit IssuedVicman Electric SevGeneral Wiring
11/07/2025CompleteGilston Brothers Elect'lGeneral Wiring
07/17/2025CompleteDanube Electric—
03/31/2025CompleteDanube Electric—
03/31/2025CompleteDanube Electric—
08/19/2024CompleteDanube ElectricGeneral Wiring
08/14/2024CompleteDanube ElectricGeneral Wiring
08/12/2024CompleteDanube ElectricGeneral Wiring
08/12/2024CompleteDanube ElectricGeneral Wiring
08/12/2024CompleteDanube ElectricGeneral Wiring
08/08/2024CompleteDanube ElectricGeneral Wiring
08/08/2024CompleteDanube ElectricGeneral Wiring
08/08/2024CompleteDanube ElectricGeneral Wiring
08/08/2024CompleteDanube ElectricGeneral Wiring
05/24/2023CompleteDennison ElectricGeneral Wiring
1 project · most recent 04/13/2025
FiledStatusContractorScope
04/13/2025———
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/06/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/21/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/26/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/09/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2022Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/07/2022Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
07/28/2026Tenant Protection Plan ComplianceABDALLAH ELCHERBINIspecial
02/12/2026Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
02/12/2026FinalIvan Zurkiwskyjprogress
02/12/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
05/17/2022Standpipe SystemsMatthew Wavrospecial
05/17/2022Fire-Resistant Penetrations and JointsMatthew Wavrospecial
01/21/2022Post-installed AnchorsBrian Clarkespecial
12/21/2021Post-installed AnchorsBrian Clarkespecial
12/04/2019FinalJOEL PHAGOOprogress
08/27/2019FinalBRIAN T. O'CONNORprogress
827 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account