← Back
Banking facility, with or without parking
1501 KINGS HIGHWAY
BROOKLYN · Madison · BIN 3182430
💬 Discuss this project
1915Year Built
3Stories
K7Building Class
C4-4AZoning
9,881 sfGross Floor Area
1Units
1 Open Violation ▸FDNY Report ↗
Banking facility, with or without parking · Owner of record: CITY KINGS LLC · 3,805 sf lot · 2.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanical
Roof3p · 1 filing · 4 docs
Floor 31p · 1 filing · 8 docs
Floor 2
Floor 1
Basement2p · 2 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
COLIN DEVELOPMENT1307/08/2026
MIDWOOD MANAGEMENT1004/09/2026
CITY KINGS LLC103/22/2026
AEGON REALTY103/21/2026
CITY KINGS LLC BY SIMCO MANAG903/21/2026
CITY KINGS LLC BY SIMCO MGMT203/21/2026
CITY KINGS LLC BY SIMCO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STRATFORD ENGINEERING102/10/2025
THE MCINTOSH GROUP, PLLC211/14/2024
ASHRAF CORP110/23/2024
TMALIHAN-HAGGER ARCHITECT NYC, LLC.102/23/2024
VINCENT J. LIOTTA P.E.101/02/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO CONSULTING MANAGEMENT603/21/2026
VINCENT J. LIOTTA P.E.103/21/2026
KD DESIGNS103/21/2026
VINCENT J. LIOTTA P. E.103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME RETAIL SERVICES INCGeneral Contractor603/21/2026
PATRIOT ORGANIZATION INCGeneral Contractor607/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor403/21/2026
RELIABLE GENERAL CONTRACTGeneral Contractor204/09/2026
VIVIANO, PAULElectrical103/21/2026
KSW MECHANICAL,LLCGeneral Contractor107/08/2026
PERCIBALLI, ORLANDOElectrical103/21/2026
PAUL OLSENElectrical103/21/2026
FEDER, IRVINGElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MILROSE CONSULTANTS LLC2003102/10/2025
VINCENT J. LIOTTA P. E.1974101/02/2020
Building Lifecycle
All (47)Filed (6)Permit Issued (11)Signed Off (5)Violation (22)Special Inspection (3)
01/30/2026
Signed off — Alteration
Repair / Replace existing roofing per plans submitted herewith.
B00868522-I1
06/02/2025
Permit issued — General Construction
B00868522-I1-GC
04/02/2025
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01126714-I1
03/13/2025
Signed off — Alteration
B01145238-I1
03/05/2025
Permit issued — Structural
B01145238-I1-ST
02/18/2025
Signed off — Alteration
#8362 Minor Renovation of Existing Bank.
B00505256-I1
02/10/2025
Filed — Alteration
B01145238-I1
11/19/2024
Permit issued — General Construction
B00868522-I1-GC
11/15/2024
Special inspection requirement — Final
Christopher Drutjons
11/14/2024
Filed — Alteration
#8362 Minor Renovation of Existing Bank.
B00505256-P1
11/13/2024
Special inspection requirement — Final
Christopher O'Malley
10/24/2024
Permit issued — Supported Scaffold
B01126714-I1-SH
10/24/2024
Permit issued — Supported Scaffold
B01126714-I1-SF
10/23/2024
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AND HEAVY DUTY SIDEWALK SHED AS PER PLANS. TEMPORARY EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01126714-I1
04/16/2024
Permit issued — General Construction
B00505256-I1-GC
02/23/2024
Filed — Alteration
Repair / Replace existing roofing per plans submitted herewith.
B00868522-I1
02/08/2024
Violation issued (FDNY_NOV, closed)
06/29/2023
Permit issued — General Construction
B00505256-I1-GC
05/05/2023
Permit issued — General Construction
B00505256-I1-GC
05/02/2023
Special inspection requirement — Final
Teresa Malihan-Haggerty
12/20/2022
Permit issued — General Construction
B00505256-I1-GC
10/05/2022
Permit issued — General Construction
B00505256-I1-GC
07/01/2021
Filed — Alteration
#8362 Minor Renovation of Existing Bank.
B00505256-I1
01/03/2020
Signed off — Alteration
B00193350-I1
01/02/2020
Filed — Alteration
B00193350-I1
01/02/2020
Permit issued — Mechanical Systems
B00193350-I1-MS
12/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/27/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/05/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/17/2017
Violation issued (ECB, closed)
Elevators
06/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/10/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/27/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/22/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/08/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/15/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/27/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/21/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1992
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRELIABLE GENERAL CONTRACT06/02/2025
DOB NOWStructuralSigned-offPRIME RETAIL SERVICES INC03/05/2025
DOB NOWGeneral ConstructionSigned-offRELIABLE GENERAL CONTRACT11/19/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC10/24/2024
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC10/24/2024
DOB NOWGeneral ConstructionSigned-offPRIME RETAIL SERVICES INC04/16/2024
DOB NOWGeneral ConstructionSigned-offPATRIOT ORGANIZATION INC06/29/2023
DOB NOWGeneral ConstructionSigned-offPATRIOT ORGANIZATION INC05/05/2023
DOB NOWGeneral ConstructionSigned-offPATRIOT ORGANIZATION INC12/20/2022
DOB NOWGeneral ConstructionSigned-offPATRIOT ORGANIZATION INC10/05/2022
DOB NOWMechanical SystemsSigned-offKSW MECHANICAL,LLC01/02/2020
BISMHISSUEDMETROPOLITAN MECHANICAL C01/04/2018
BISMHISSUEDPERRY MECHANICAL CONTRACT06/24/2014
BISSPISSUEDPREFERRED SPKLR AND MECH01/18/2013
BISOTISSUEDSTRUCTURE TONE, LLC12/19/2012
BISMHISSUEDSTRUCTURE TONE, LLC12/19/2012
BISPLISSUEDPREFERRED MECHANICAL INC12/14/2012
BISOTISSUEDSTRUCTURE TONE, LLC09/10/2012
BISMHISSUEDSTRUCTURE TONE, LLC09/10/2012
BISEQISSUEDPERIMETER BRIDGE & SCAFFO06/30/2011
BIS—ISSUEDAMERICAN SIGN & ELECL CON01/28/2008
BIS—ISSUEDPARKER SERVICE INDUSTRIES11/07/2001
BISOTISSUEDPHILICHEL AIR CONDINTIONING11/04/1998
BISMHISSUEDH.M. HUGHES CO. INC10/06/1997
BIS—ISSUEDINTERBORO SIGN AND MAINTENANCE06/23/1997
BISOTISSUEDH.M.HUGHES CO.INC12/13/1996
BISMHISSUEDH.M.HUGHES CO.INC12/13/1996
BISOTISSUEDH.M.HUGHES CO.INC12/13/1996
BISEQISSUEDH.M.HUGHES CO.INC12/13/1996
BISPLISSUEDPAR PLUMBING CO., INC.08/01/1996
BISEQISSUEDYORK SCAFFOLDING07/23/1996
BISSPISSUEDNATIONAL SPRINKLER CORP.07/18/1996
BISEQISSUEDH.M.HUGHES CO.INC05/14/1996
BISOTISSUEDH.M.HUGHES CO.INC05/14/1996
BISOTISSUEDHUMIDITY CONTROL SERVICE CORP.10/26/1992
3 projects · most recent 10/28/2024
General Wiring Lighting
FiledStatusContractorScope
10/28/2024CompleteNASH ELECTRIC SERVICES IN—
04/01/2022Permit IssuedDANICK ELEC'L CONTR'G CORGeneral Wiring
02/01/2018CompleteNEW YORK EMPIRE ELECL CONLighting
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
11/15/2024FinalChristopher Drutjonsprogress
11/13/2024FinalChristopher O'Malleyprogress
05/02/2023FinalTeresa Malihan-Haggertyprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
CitibankOfficeSub-basement, Basement, Floors 1–3
Project B00505256 Alteration · LOC Issued · 07/01/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
09/01/2026B00505256-P1Request digital key ↗
09/01/2026B00505256-I1Request digital key ↗
08/25/2026B00868522-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00193350-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION11
01/04/2018321706418Open ↗
07/21/2014321028678Open ↗
05/21/2013320580750Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION5
01/04/2018321706418Open ↗
07/21/2014321028678Open ↗
12/17/2012320580769Open ↗
Showing 3 of 5 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/31/2018321706418Open ↗
▸Seals & Professional Certifications32
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION17
06/14/2018321706418Open ↗
01/04/2018321706418Open ↗
03/01/2013320580741Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/01/2026B00505256-I1Open ↗
09/01/2026B00505256-P1Open ↗
08/25/2026B00868522-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/25/2026B00505256-I1Open ↗
09/01/2026B00868522-I1Open ↗
08/27/2026B00505256-P1Open ↗
▸BISProfessional and Owner Certification (POC3)2
01/04/2018321706418Open ↗
07/21/2014321028678Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/04/2018321706418Open ↗
09/07/2012320580769Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/07/2012320580769Open ↗
09/07/2012320580769Open ↗
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING3
10/02/2012320580741Open ↗
09/10/2012320580741Open ↗
09/07/2012320580769Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
11/07/2013320580741Open ↗
02/12/2013320580769Open ↗
01/30/2013320580769Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
11/18/2014320580750Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
06/14/2018321706418Open ↗
▸BISSPRINKLER INSP REPORT : FP-851
11/07/2013320580741Open ↗
▸BISEQUIPMENT USE PERMITS1
06/14/2018321706418Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
01/04/2018321706418Open ↗
09/10/2012320580750Open ↗
09/10/2012320580741Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026B00505256-I1Open ↗
09/01/2026B00505256-P1Open ↗
08/22/2026B01145238-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/25/2026B00868522-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
06/14/2018321706418Open ↗
01/04/2018321706418Open ↗
09/07/2012320580769Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/14/2018321706418Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX4
01/06/2014320580769Open ↗
01/06/2014320580769Open ↗
01/06/2014320580769Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
06/14/2018321706418Open ↗
11/20/2013320580741Open ↗
08/02/2012320329952Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
07/21/2014321028678Open ↗
07/21/2014321028678Open ↗
01/22/2013320580741Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/21/2014321028678Open ↗
09/07/2012320580769Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT12
06/14/2018321706418Open ↗
01/04/2018321706418Open ↗
12/22/2014320580750Open ↗
Showing 3 of 12 on file for this type
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET6
01/12/2018321706418Open ↗
07/21/2014321028678Open ↗
09/10/2012320580769Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION2
06/07/2018321706418Open ↗
10/24/2013320580769Open ↗
▸BISBOROUGH INTAKE FORM1
06/14/2018321706418Open ↗