← Back
Two stories - detached, small or mid-size
1501 PELHAM PARKWAY NORTH
BRONX · Pelham Gardens · BIN 2050762
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R4-1Zoning
1,800 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,039 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI106/24/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841106/24/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
07/27/2026
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
X01420525-I1
06/25/2026
Permit issued — Solar
X01420525-I1-SL
06/24/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
X01420525-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
06/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
06/22/2026
Special inspection requirement — Final
ROBERT MASONE
06/22/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC06/25/2026
BISOTISSUEDPETER-GEORGE DEVELOPMENT10/24/2001
BISCCISSUEDIMPERIAL REMODELERS INC09/16/1998
1 project · most recent 06/22/2026
FiledStatusContractorScope
06/22/2026CompleteNY SOLAR ELECTRICAL LLC—
1 project · most recent 06/24/2026
FiledStatusContractorScope
06/24/2026Signed-offNYSS LLC26 panels, 11.44 kw, 918 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/22/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
06/22/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
06/22/2026Energy Code Compliance InspectionsROBERT MASONEprogress
06/22/2026FinalROBERT MASONEprogress
06/22/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026X01420525-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026X01420525-I1Open ↗
08/27/2026X01420525-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026X01420525-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026X01420525-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026X01420525-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/16/2026X01420525-I1Open ↗