← Back
Miscellaneous religious facility
1502 GRAVESEND NECK ROAD
BROOKLYN · BIN 3201939
💬 Discuss this project
1930Year Built
2Stories
M9Building Class
R4Zoning
3,923 sfGross Floor Area
1Units
5 Open Violations 4 unresolved · 1 paperwork only ▸FDNY Report ↗
Miscellaneous religious facility · Owner of record: BROOKLYN C & C CHURCH · 2,112 sf lot · 1.86 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalCivilOther
Roof1p · 1 filing · 13 docs
Floor 21p · 1 filing · 12 docs
Floor 117p · 3 filings · 20 docs
Cellar15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BROOKLYN COMMUNITY CHRISTIAN CHURCH2007/08/2026
OWNER OF 1506 NECK RD (AK103/22/2026
OWNER OF 1502 NECK RD (AK103/22/2026
BROOKLYNCHINESE CHRISTIAN CHURCH103/21/2026
CHINESE CHRISTAIN CHURCH703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HTX BUILDING CONSULTING INC501/05/2026
INDETAIL ARCHITECTURAL AND ENGIN607/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX BUILDING CONSULTING1103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOHN EVAN CONTRACTING CORGeneral Contractor1207/08/2026
JABBIE INDUSTRIES INCORP*General Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NYX ENGINEERING, PLLC6118201/05/2026
NKM ENGINEERING PLLC6244707/22/2024
Building Lifecycle
All (115)Filed (11)Permit Issued (8)Signed Off (4)Violation (18)Inspection (8)Objection (36)Special Inspection (30)
04/08/2026
Signed off — Alteration
File opening between the two buildings for connivence access, no change in use egress or occupancy ( lot # 85 and 84)
B01175966-I1
03/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Xiao Huang
01/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Xiao Huang
01/21/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Xiao Huang
01/05/2026
Filed — Alteration
File opening between the two buildings for connivence access, no change in use egress or occupancy ( lot # 85 and 84)
B01175966-P3
12/16/2025
Permit issued — General Construction
B01175966-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2025
Objection resolved — Addressed
10/15/2025
Objection raised — Admin
10/03/2025
Filed — Alteration
File opening between the two buildings for connivence access, no change in use egress or occupancy ( lot # 85 and 84)
B01175966-P2
10/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/03/2025
Special inspection requirement — Energy Code Compliance Inspections
02/26/2025
Objection resolved — Addressed
02/19/2025
Objection raised — Zoning
02/07/2025
Filed — Alteration
File opening between the two buildings for connivence access, no change in use egress or occupancy ( lot # 85 and 84)
B01175966-I1
11/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/17/2024
Signed off — Alteration CO
file to change the egress of the building ,exisitng building use remain the same , obtain new c/o
B00929370-S1
10/17/2024
Signed off — Alteration CO
file to change the egress of the building ,exisitng building use remain the same , obtain new c/o
B00929370-S3
10/01/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/20/2024
Permit issued — Mechanical Systems
B00929370-S3-MS
09/16/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
08/21/2024
Objection resolved — Addressed
08/21/2024
Objection resolved — Addressed
08/21/2024
Special inspection requirement — Lighting controls
NARESH MAHANGU
08/21/2024
Special inspection requirement — Maintenance information
NARESH MAHANGU
08/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/21/2024
Special inspection requirement — Air barrier - visual inspection
NARESH MAHANGU
08/21/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
NARESH MAHANGU
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
08/21/2024
Special inspection requirement — Interior lighting power
NARESH MAHANGU
08/09/2024
Objection raised — Admin
08/05/2024
Objection resolved — Addressed
08/01/2024
Special inspection requirement — Final
YUNHO LEE
08/01/2024
Special inspection requirement — HVAC-R and service water heating equipment
NARESH MAHANGU
08/01/2024
Special inspection requirement — Mechanical Systems
NARESH MAHANGU
08/01/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NARESH MAHANGU
08/01/2024
Special inspection requirement — Energy Code Compliance Inspections
NARESH MAHANGU
08/01/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
08/01/2024
Special inspection requirement — HVAC-R and service water heating system controls
NARESH MAHANGU
08/01/2024
Special inspection requirement — Maintenance information
NARESH MAHANGU
07/30/2024
Objection raised — Other
07/30/2024
Objection raised — Zoning
07/30/2024
Objection resolved — Addressed
07/30/2024
Objection raised — Fire_Protection
07/24/2024
Filed — Alteration CO
file to change the egress of the building ,exisitng building use remain the same , obtain new c/o
B00929370-P4
07/24/2024
Special inspection requirement — HVAC-R and service water heating system controls
07/24/2024
Special inspection requirement — Final
07/24/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
07/24/2024
Special inspection requirement — Maintenance information
07/24/2024
Special inspection requirement — Mechanical Systems
07/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/24/2024
Special inspection requirement — Energy Code Compliance Inspections
07/24/2024
Special inspection requirement — HVAC-R and service water heating equipment
07/22/2024
Filed — Alteration CO
file to change the egress of the building ,exisitng building use remain the same , obtain new c/o
B00929370-P3
05/17/2024
Signed off — Alteration
File structural , foudation work in conjunction with Alt1 job# B00929370 as per plans submitted ,
B00889166-I1
Latest 60 of 115 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJABBIE INDUSTRIES INCORP*12/16/2025
DOB NOWMechanical SystemsSigned-offJOHN EVAN CONTRACTING COR09/20/2024
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR03/21/2024
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR03/21/2024
DOB NOWEarth WorkSigned-offJOHN EVAN CONTRACTING COR03/21/2024
DOB NOWGeneral ConstructionPermit IssuedJOHN EVAN CONTRACTING COR02/21/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/30/2024
DOB NOWFoundationSigned-offJOHN EVAN CONTRACTING COR01/05/2024
BIS—ISSUEDCHINESE CHRISTIAN CHURCH08/19/2020
BISOTISSUEDSING CONSTRUCTION, INC11/21/2019
BISEQISSUEDHONGTAI CONSTRUCTION INC08/14/2017
BISOTISSUEDHONGTAI CONSTRUCTION INC08/14/2017
BIS—ISSUEDFORTUNA DESIGN & CONSTRUCTION04/05/2012
BIS—ISSUEDCHINESE CHRISTIAN CHURCH03/03/2000
BIS—ISSUEDMAINLAND PLG HTNG INC02/01/2000
BISPLISSUEDMAINLAND PLG HTNG INC02/01/2000
BISPLISSUEDMAINLAND PLUMBING AND HEATING05/02/1995
1 project · most recent 07/24/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/24/2024Signed-offJOHN EVAN CONTRACTING CORHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM2 48,000 BTU · Heat Pump Outdoor ×12
1 project · most recent 07/24/2024
Gas Water/Sanitary
FiledStatusContractorScope
07/24/2024Signed-offCATMAN PLUMBING INCGas, Water/Sanitary
1 project · most recent 09/02/2024
General Wiring
FiledStatusContractorScope
09/02/2024CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
11/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2024Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2024Fail-Final CND-Occupancy InspectionFailView ↗
05/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
01/21/2026Energy Code Compliance InspectionsXiao Huangprogress
01/21/2026Fire-Resistant Penetrations and JointsXiao Huangspecial
01/21/2026Structural Stability – Alterations of existing buildingsXiao Huangspecial
10/03/2025Energy Code Compliance Inspections—progress
10/03/2025Structural Stability – Alterations of existing buildings—special
10/03/2025Fire-Resistant Penetrations and Joints—special
08/21/2024Lighting controlsNARESH MAHANGUenergy_progress
08/21/2024Air barrier - visual inspectionNARESH MAHANGUenergy_progress
08/21/2024Maintenance informationNARESH MAHANGUenergy_progress
08/21/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/21/2024Fire-Resistance Rated ConstructionNARESH MAHANGUprogress
08/21/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/21/2024Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
08/21/2024Interior lighting powerNARESH MAHANGUenergy_progress
08/01/2024Mechanical SystemsNARESH MAHANGUspecial
08/01/2024Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
08/01/2024FinalYUNHO LEEprogress
08/01/2024Energy Code Compliance InspectionsNARESH MAHANGUprogress
08/01/2024HVAC-R and service water piping design and insulationNARESH MAHANGUenergy_progress
08/01/2024HVAC-R and service water heating equipmentNARESH MAHANGUenergy_progress
08/01/2024Maintenance informationNARESH MAHANGUenergy_progress
08/01/2024HVAC-R and service water heating system controlsNARESH MAHANGUenergy_progress
07/24/2024Maintenance information—energy_progress
07/24/2024HVAC-R and service water piping design and insulation—energy_progress
07/24/2024HVAC-R and service water heating system controls—energy_progress
Latest 25 of 61.
▾Documents — 134 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/27/2026B00889166-P1Request digital key ↗
08/27/2026B00889166-I1Request digital key ↗
08/24/2026B00929370-S1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits14
▸BISPLAN / WORK APPROVAL APPLICATION10
10/26/2020300843942Open ↗
12/16/2019340541621Open ↗
11/19/2019340706819Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION3
01/22/2021300843942Open ↗
11/19/2019340706819Open ↗
08/15/2017321638938Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/15/2020340706819Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISVERIFY TAX LOT1
10/22/2020300843942Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00929370-I1Open ↗
▸Seals & Professional Certifications40
▸DOB NOWProgress Inspector Seal & Signature13
09/14/2026B00929370-S3Open ↗
09/14/2026B00929370-S3Open ↗
09/14/2026B00929370-S3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00889166-I1Open ↗
08/27/2026B00889166-P1Open ↗
08/24/2026B00929370-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/14/2026B00929370-S3Open ↗
09/12/2026B00929370-P1Open ↗
09/10/2026B00929370-P3Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
08/15/2017321638938Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/05/2017321638938Open ↗
08/15/2017321638938Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/15/2017321638938Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B00929370-P1Open ↗
08/13/2026B00929370-P3Open ↗
08/13/2026B00929370-I1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026B00889166-I1Open ↗
08/24/2026B00929370-S3Open ↗
08/24/2026B00929370-S1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
05/26/2011320302864Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/15/2020340706819Open ↗
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
10/05/2017321638938Open ↗
08/15/2017321638938Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
10/15/2020340706819Open ↗
10/05/2017321638938Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/15/2020340706819Open ↗
10/15/2020340706819Open ↗
11/19/2019340706819Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/13/2026B00929370-P4Open ↗
08/13/2026B00929370-S3Open ↗
08/13/2026B01175966-I1Open ↗
Showing 3 of 11 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE7
10/29/2020300843942Open ↗
10/26/2020300843942Open ↗
05/16/2019300843942Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
11/12/2020300843942Open ↗
10/15/2020340706819Open ↗
10/05/2017321638938Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
10/05/2017321638938Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/26/2011320302864Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
10/15/2020340706819Open ↗
11/19/2019340706819Open ↗
10/05/2017321638938Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms9
▸BISBOROUGH INTAKE FORM3
09/03/2020300843942Open ↗
12/16/2019340541621Open ↗
10/05/2017321638938Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
11/19/2019340706819Open ↗
09/12/2017340541621Open ↗
▸BISADDITIONAL INFORMATION2
01/22/2021300843942Open ↗
11/04/2019300843942Open ↗
▸BISEFILING COVER SHEET2
08/15/2017321638938Open ↗
05/26/2011320302864Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification3
08/24/2026B00929370-P3Open ↗
08/24/2026B00929370-I1Open ↗
08/15/2026B00929370-P1Open ↗
▸BISFEE EXEMPTION DOCUMENTATION1
11/19/2019340706819Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00889166-I1Open ↗