Predominantly retail with other uses
1504 LELAND AVENUE
BRONX · BIN 2028683
💬 Discuss this project
1928Year Built
2Stories
K4Building Class
R6Zoning
16,500 sfGross Floor Area
7Units
Rent Stabilized44 Open Violations 43 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: AZRA, AARON AND AURORA REALTY LLC · 8,790 sf lot · 1.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof19p · 2 filings · 20 docs
Floor 226p · 2 filings · 20 docs
Floor 148p · 3 filings · 20 docs
Mezzanine8p · 1 filing · 9 docs
Cellar48p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HIRESPRINT1407/08/2026
AZRA, AARON AND AURORA REALTY LLC103/22/2026
MEDIJO REALTY LLC403/22/2026
MEDINA REALTY703/22/2026
MEDINA CORP103/22/2026
MEDINA REALTY COMP303/22/2026
3923-45 RALTY LLC103/22/2026
640 SUPER MARKET CORP103/22/2026
EL NUEVO COMIENZO FOOD CORP103/22/2026
NYC HOUSING PRESERVATION DEVEL203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2013$2.2M—MEDINA REALTY COMPANY LLC → MEDIJO REALTY LLC$133/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN LIGHT EXPEDITING LLC2203/21/2026
CSMR DESIGNS303/21/2026
CBA CONSULTANTS403/21/2026
Rigid Structural Design, LLC103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANTHONY FOWLERGeneral Contractor2007/08/2026
BUILDCOX CONSTRUCTION CORGeneral Contractor507/08/2026
INFINITI ESC PLUMBING CORPlumbing407/08/2026
A M A HOLDINGSScaffold207/08/2026
CORJI CONTRACTING LLCGeneral Contractor203/21/2026
L J ELEC'L SERV. INC.Electrical103/22/2026
IRVING BAPTISTEElectrical103/21/2026
CONSULTING REMODLING INCGeneral Contractor107/08/2026
ANTON NICAJElectrical103/21/2026
ENVIRONMENTAL ABATEMENTGeneral Contractor107/08/2026
APN ELECTRICAL CORPElectrical103/22/2026
SIGNORE & SONS PLBG CORPPlumbing107/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THEODORE G RIEPER ARCHITE4447209/30/2024
DEMERARA ENGINEERING, PLL4248408/12/2024
RYAN SPECIAL ENGINEERING2018406/21/2023
AM ENGINEERING SERVICES P7975111/08/2022
Building Lifecycle
All (224)Filed (18)Permit Issued (21)Signed Off (3)Violation (60)Inspection (13)Objection (79)Special Inspection (30)
04/30/2026
Violation issued (HPD, open)
A
06/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/05/2025
Violation issued (HPD, open)
A
04/18/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
03/21/2025
Signed off — Alteration
Filing construction fence for partial Demo caused by property fire. See plans uploaded for details. No change in use, egress, or occupancy under this application. Emergency work order #357354.
X00735291-I1
12/02/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/25/2024
Violation issued (HPD, closed)
I
11/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
THEODORE RIEPER
11/25/2024
Special inspection requirement — Lighting controls
THEODORE RIEPER
11/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
11/25/2024
Special inspection requirement — Interior lighting power
THEODORE RIEPER
11/25/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
THEODORE RIEPER
11/25/2024
Special inspection requirement — Vestibules
THEODORE RIEPER
11/25/2024
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
11/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
THEODORE RIEPER
11/25/2024
Special inspection requirement — Final
THEODORE RIEPER
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/18/2024
Objection resolved — Addressed
11/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/10/2024
Objection raised — Other
10/10/2024
Objection raised — Other
10/10/2024
Objection raised — Other
10/04/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/30/2024
Filed — Alteration
RE-BUILDING OF FIRE DAMAGED AREAS OF THE EXISTING BUILDING AND UPGRADE OF FIRST FLOOR FROM TIMBER TO CONCRETE ON METAL DECK.
X08039487-P1
08/29/2024
Special inspection requirement — Wood – Seismic Resistance
08/28/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
THEODORE RIEPER
08/28/2024
Special inspection requirement — Interior lighting power
THEODORE RIEPER
08/28/2024
Special inspection requirement — Lighting controls
THEODORE RIEPER
08/28/2024
Special inspection requirement — Vestibules
THEODORE RIEPER
08/28/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
THEODORE RIEPER
08/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
THEODORE RIEPER
08/28/2024
Special inspection requirement — Final
THEODORE RIEPER
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
THEODORE RIEPER
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
THEODORE RIEPER
08/16/2024
Objection resolved — Addressed
08/15/2024
Objection raised — Other
08/15/2024
Objection raised — Cost
08/12/2024
Filed — Alteration
Filing to repair/replace structural framing and components due to fire damage as per plans. No change in use, egress, or occupancy under this application.
X08020650-P1
08/12/2024
Permit issued — Structural
X08020650-I1-ST
08/09/2024
Special inspection requirement — Final
Oscar Walters Jr
08/09/2024
Special inspection requirement — Structural Steel - Welding
Oscar Walters Jr
08/09/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Oscar Walters Jr
08/09/2024
Special inspection requirement — Structural Steel - Details
Oscar Walters Jr
08/09/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Oscar Walters Jr
08/09/2024
Special inspection requirement — Structural Cold-Formed Steel
Oscar Walters Jr
08/09/2024
Special inspection requirement — Post-installed Anchors
Oscar Walters Jr
08/02/2024
Violation issued (ECB, open)
Construction
07/29/2024
Permit issued — Mechanical Systems
X00855344-I1-MS
06/13/2024
Permit issued — Structural
X08039487-S1-ST
06/12/2024
Permit issued — General Construction
X01033920-I1-GC
05/02/2024
Permit issued — Sign
X00995938-I1-SG
05/01/2024
Permit issued — Sign
X00997391-I1-SG
04/19/2024
Filed — Alteration
X01033920-I1
04/12/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/10/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/08/2024
Signed off — Alteration
X00788054-I1
04/02/2024
Violation issued (HPD, open)
A
Latest 60 of 224 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedANTHONY FOWLER08/12/2024
DOB NOWMechanical SystemsPermit IssuedANTHONY FOWLER07/29/2024
DOB NOWStructuralPermit IssuedANTHONY FOWLER06/13/2024
DOB NOWGeneral ConstructionPermit IssuedCORJI CONTRACTING06/12/2024
DOB NOWSignPermit IssuedA.M.A HOLDINGS INC05/02/2024
DOB NOWSignPermit IssuedA.M.A HOLDINGS INC05/01/2024
DOB NOWPlumbingPermit IssuedINFINITI ESC PLUMBING COR03/29/2024
DOB NOWMechanical SystemsSigned-offANTHONY FOWLER02/29/2024
DOB NOWSprinklersPermit IssuedCITYWIDE PLBG, HTG &SPRKL02/05/2024
DOB NOWGeneral ConstructionPermit IssuedANTHONY FOWLER11/08/2023
DOB NOWConstruction FenceSigned-offANTHONY FOWLER11/08/2023
DOB NOWGeneral ConstructionSigned-offANTHONY FOWLER11/08/2023
DOB NOWPlumbingPermit IssuedSIGNORE & SONS PLBG CORP10/26/2023
DOB NOWConstruction FenceSigned-offANTHONY FOWLER10/13/2023
DOB NOWGeneral ConstructionSigned-offANTHONY FOWLER08/15/2023
DOB NOWGeneral ConstructionPermit IssuedANTHONY FOWLER06/14/2023
DOB NOWSidewalk ShedSigned-offBUILDCOX CONSTRUCTION COR03/24/2023
DOB NOWSidewalk ShedSigned-offBUILDCOX CONSTRUCTION COR11/30/2022
DOB NOWConstruction FenceSigned-offCONSULTING REMODLING09/27/2022
DOB NOWSidewalk ShedSigned-offBUILDCOX CONSTRUCTION COR08/12/2022
DOB NOWGeneral ConstructionSigned-offENVIRONMENTAL ABATEMENT05/31/2022
BISMHISSUEDUNITED KITCHEN & VENTILAT07/02/2015
BISOTISSUEDCLASS ONE CONST LTD06/30/2011
BISEQISSUEDLAKHI GENERAL CONTRACTOR06/13/2011
BISBLISSUEDMAGIC MECHANICAL INC12/20/2006
BISBLISSUEDNATIONWIDE MECHANICAL INC10/28/1996
BISPLISSUEDNATIONWIDE MECHANICAL INC05/09/1996
BISOTISSUEDEAST SUN CORP.12/21/1993
BISEQISSUEDEAST SUN CORP04/06/1993
BISPLISSUEDNATIONWIDE MECHANICAL INC10/01/1992
BIS—ISSUEDEAST SUN CORP.07/06/1992
1 project · most recent 08/31/2023
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/31/2023Signed-offANTHONY FOWLERHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MSZ-Fs09NA-U1 9,000 BTU · Fan Coil Indoor ×7
MSZ-FS06NA-U1 6,000 BTU · Fan Coil Indoor ×4
MSZ-FS12NA-U1 12,000 BTU · Fan Coil Indoor ×3
MXZ-3C24NAHZ4-U1 28,400 BTU · Heat Pump Outdoor ×2
MXZ-SM36NAMHZ-U1 36,000 BTU · Heat Pump Outdoor ×2
MSZ-FS15NA-U1 15,000 BTU · Fan Coil Indoor ×1
MSZ-FS18NA-U1 17,200 BTU · Fan Coil Indoor ×1
MXZ-3C30NAHZ4-U1 28,400 BTU · Heat Pump Outdoor ×1
Ventilation
Greenheck FV-0511VQ1 50 CFM · Exhaust Fan ×5
2 projects · most recent 08/31/2023
FiledStatusContractorScope
08/31/2023Permit IssuedDYNAMIC PLBNG & SPRKR COR—
05/24/2023———
2 projects · most recent 08/31/2023
Gas Water/Sanitary
FiledStatusContractorScope
08/31/2023Permit IssuedINFINITI ESC PLUMBING CORGas, Water/Sanitary
05/24/2023Permit IssuedSIGNORE & SONS PLBG CORPGas, Water/Sanitary
5 projects · most recent 08/23/2024
General Wiring
FiledStatusContractorScope
08/23/2024Permit IssuedL J ELEC'L SERV. INC.General Wiring
08/22/2024CompleteL J ELEC'L SERV. INC.General Wiring
09/14/2023Permit IssuedL J ELEC'L SERV. INC.General Wiring
05/16/2023CancelledAPN ELECTRICAL CORP1 meters, 1 new_meters
08/05/2022CompleteRICHARD NEU—
2 projects · most recent 09/30/2024
Steel Masonry Wood
FiledStatusContractorScope
09/30/2024Permit IssuedANTHONY FOWLERSteel, Masonry
08/12/2024Permit IssuedANTHONY FOWLERSteel, Masonry, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/18/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/02/2024Fail-Final General Construction Non-Directive 14FailView ↗
11/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/04/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/12/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/08/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
11/25/2024Structural Stability – Alterations of existing buildingsTHEODORE RIEPERspecial
11/25/2024Lighting controlsTHEODORE RIEPERenergy_progress
11/25/2024Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
11/25/2024Interior lighting powerTHEODORE RIEPERenergy_progress
11/25/2024Fenestration and door U-factor and product ratingsTHEODORE RIEPERenergy_progress
11/25/2024VestibulesTHEODORE RIEPERenergy_progress
11/25/2024Energy Code Compliance InspectionsTHEODORE RIEPERprogress
11/25/2024Fire-Resistance Rated ConstructionTHEODORE RIEPERprogress
11/25/2024FinalTHEODORE RIEPERprogress
08/29/2024Wood – Seismic Resistance—special
08/28/2024Structural Stability – Alterations of existing buildingsTHEODORE RIEPERspecial
08/28/2024Interior lighting powerTHEODORE RIEPERenergy_progress
08/28/2024Lighting controlsTHEODORE RIEPERenergy_progress
08/28/2024VestibulesTHEODORE RIEPERenergy_progress
08/28/2024Fenestration and door U-factor and product ratingsTHEODORE RIEPERenergy_progress
08/28/2024Fire-Resistance Rated ConstructionTHEODORE RIEPERprogress
08/28/2024FinalTHEODORE RIEPERprogress
08/28/2024Energy Code Compliance InspectionsTHEODORE RIEPERprogress
08/28/2024Fire-Resistant Penetrations and JointsTHEODORE RIEPERspecial
08/09/2024FinalOscar Walters Jrprogress
08/09/2024Structural Steel - WeldingOscar Walters Jrspecial
08/09/2024Structural Steel - High Strength BoltingOscar Walters Jrspecial
08/09/2024Structural Steel - DetailsOscar Walters Jrspecial
08/09/2024Structural Stability – Alterations of existing buildingsOscar Walters Jrspecial
08/09/2024Structural Cold-Formed SteelOscar Walters Jrspecial
Latest 25 of 56.
▾Documents — 127 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/24/2026X00707920-I1Request digital key ↗
08/24/2026X00735291-I1Request digital key ↗
08/24/2026X00788054-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION5
06/02/2015220461060Open ↗
04/17/2012220127039Open ↗
04/17/2012220127039Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION3
07/02/2015220461060Open ↗
07/02/2015220461060Open ↗
07/02/2011220127039Open ↗
▸Seals & Professional Certifications72
▸DOB NOWProgress Inspector Seal & Signature24
09/30/2026X08039487-P1Open ↗
09/30/2026X08039487-P1Open ↗
09/30/2026X08039487-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/24/2026X00735291-I1Open ↗
08/24/2026X00788054-I1Open ↗
08/23/2026X00855344-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature16
09/30/2026X08039487-P1Open ↗
09/30/2026X08039487-P1Open ↗
09/25/2026X08039487-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
06/02/2015220461060Open ↗
07/05/2011220123284Open ↗
06/30/2011220127039Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
06/02/2015220461060Open ↗
06/30/2011220127039Open ↗
06/09/2011220123284Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/02/2015220461060Open ↗
06/02/2015220461060Open ↗
06/02/2015220461060Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/30/2011220127039Open ↗
06/09/2011220123284Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/23/2026X00855344-I1Open ↗
08/23/2026X00855366-P1Open ↗
08/23/2026X00855366-I1Open ↗
Showing 3 of 13 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/02/2015220461060Open ↗
06/02/2015220461060Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/30/2011220127039Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026X00707920-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
06/02/2015220461060Open ↗
▸Approvals, Objections & Sign-offs3
▸BISADMINISTRATIVE OBJECTIONS2
06/30/2011220127039Open ↗
06/09/2011220123284Open ↗
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST1
12/27/2011220127039Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT3
06/02/2015220461060Open ↗
12/27/2011220127039Open ↗
06/30/2011220127039Open ↗
▸BISLL58-88 CIVIL PENALTY AFFIDAVIT1
06/20/2011220123284Open ↗
▸BISLL58/88-CIVIL PENALTY AFFIDAVIT1
07/02/2011220127039Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
06/02/2015220461060Open ↗
06/09/2011220123284Open ↗