Filing for minor interior work inside 1st Fl apartment (rear area), work include replace hardwood flooring at (2) bedrooms, painting, and interior finishes only. No change in use, egress or occupancy.
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
Replacement of plumbing/heating equipment in basement, replace existing boiler with Pennco low pressure boiler and install a tankless Navien hot water heater on the 2nd floor apartment. Install a navien combination boiler for 1st floor and basement.
On file for this project
15 documents
▾Design Consultants (Architect / Engineer of Record)