One family attached or semi-detached
1505 EMMONS AVENUE
💬 Discuss this project
1910Year Built
2Stories
A5Building Class
R6Zoning
1,460 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · Owner of record: GS1501 EMMONS, LLC · 2,020 sf lot · 0.72 FAR built
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof30p · 2 filings · 20 docs
Floor 828p · 1 filing · 20 docs
Floor 728p · 1 filing · 20 docs
Floor 628p · 1 filing · 20 docs
Floor 530p · 1 filing · 20 docs
Floor 429p · 1 filing · 20 docs
Floor 329p · 1 filing · 20 docs
Floor 228p · 2 filings · 20 docs
Floor 127p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GOLDEN PROPERTIES403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2019$1.1M—RGS-EMMONS AVE 1505 LLC → GS1501 EMMONS, LLC$753/sf building
12/06/2018$1.1M—— → —$733/sf building
04/02/2014$500K—— → —$342/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXSPEEDIUM1403/21/2026
AVALON DESIGNS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROYAL HOME IMPROVEMENTS INCGeneral Contractor1307/08/2026
SAFETY FIRE SPRINKLER CORPFire Protection309/07/2026
HARTZION ENTERPRISES CORPGeneral Contractor309/13/2026
SWIFT SERVICES CORPGeneral Contractor207/08/2026
DYNAMIC HOISTING SCAFF INGeneral Contractor108/30/2026
P.H. WORKS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616904/17/2026
ADROIT ENGINEERING PLLC8885111/27/2024
Building Lifecycle
All (74)Filed (16)Permit Issued (5)Signed Off (2)Violation (1)Objection (20)Special Inspection (30)
07/28/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-Z4
07/06/2026
Special inspection requirement — Final
FAHAD FATEH
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
06/26/2026
Objection resolved — Addressed
06/26/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
06/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
06/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
06/26/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
06/26/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
06/26/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
06/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/26/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
06/26/2026
Special inspection requirement — Air barrier — testing
FAHAD FATEH
06/26/2026
Special inspection requirement — Lowest Floor Elevation
FAHAD FATEH
06/26/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
06/26/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
06/26/2026
Special inspection requirement — Metering
FAHAD FATEH
06/26/2026
Special inspection requirement — Exterior lighting power
FAHAD FATEH
06/26/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
06/26/2026
Special inspection requirement — Lighting controls
FAHAD FATEH
06/26/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
06/26/2026
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
06/26/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
06/10/2026
Objection resolved — Addressed
06/09/2026
Objection raised — Other
06/05/2026
Signed off — Alteration
Installation of 8' Construction Fence.
B01076137-I1
06/03/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-S1
05/12/2026
Objection resolved — Addressed
05/12/2026
Objection resolved — Addressed
05/11/2026
Objection resolved — Addressed
04/30/2026
Objection raised — Other
04/17/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-P2
04/17/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-P3
04/12/2026
Objection raised — Energy
04/12/2026
Objection raised — Other
03/30/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-P4
03/30/2026
Objection raised — Other
03/30/2026
Special inspection requirement — Lowest Floor Elevation
FAHAD FATEH
03/30/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/30/2026
Special inspection requirement — Electrical motors and elevators
FAHAD FATEH
03/30/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
03/30/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/30/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
03/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/30/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
FAHAD FATEH
03/30/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
03/26/2026
Objection resolved — Addressed
03/19/2026
Objection raised — Other
03/18/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-S6
03/13/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-S9
03/12/2026
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-S3
11/25/2025
Objection raised — Other
11/25/2025
Objection resolved — Addressed
11/20/2025
Filed — New Building
FILING TEMPORARY STANDPIPE WITH AIR PRESSURIZED ALARM SYSTEM IN CONJUNCTION WITH NB B00969850-I1.
B00969850-P1
08/01/2025
Violation issued (ECB, closed)
Construction
07/30/2025
Signed off — Full Demolition
USE OF MECHANICAL EQUIPMENT ON GRADE FOR FULL DEMOLITION JOB# B01123344-I1
B01123344-I1
06/25/2025
Permit issued — Construction Fence
B01076137-I1-FN
03/26/2025
Permit issued — Protection and Mechanical Methods
B01123344-S1-PMM
03/20/2025
Permit issued — Full Demolition
B01123344-I1-FD
01/21/2025
Filed — Full Demolition
USE OF MECHANICAL EQUIPMENT ON GRADE FOR FULL DEMOLITION JOB# B01123344-I1
B01123344-S1
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offROYAL HOME IMPROVEMENTS I06/25/2025
DOB NOWProtection and Mechanical MethodsSigned-offSWIFT SERVICES CORP03/26/2025
DOB NOWFull DemolitionSigned-offSWIFT SERVICES CORP03/20/2025
DOB NOWGeneral ConstructionPermit IssuedROYAL HOME IMPROVEMENTS I12/10/2024
DOB NOWConstruction FenceSigned-offROYAL HOME IMPROVEMENTS I07/24/2024
BISOTISSUEDFELICIANO HOME IMPR INC01/05/2018
BISPLISSUEDZONE PLUMBING & HEATING C01/05/2018
1 project · most recent 07/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/28/2026Permit IssuedHARTZION ENTERPRISES CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAMHZ2 36,000 BTU · Condensing Unit ×23
PUZ-HA24NHA1 24,000 BTU · Condensing Unit ×14
MXZ-3C24NAHZ4 23,600 BTU · Condensing Unit ×10
MXZ-SM42NAMHZ2 42,000 BTU · Condensing Unit ×3
PUZ - A18NKA7 18,000 BTU · Condensing Unit ×2
MXZ-SM60NAM2-U1 60,000 BTU · Condensing Unit ×1
PUZ - A12NKA7 12,000 BTU · Condensing Unit ×1
SUZ-KA09NA2 9,000 BTU · Condensing Unit ×1
Ventilation
Lf Systems MES025/035 2,400 CFM · Kitchen Exhaust ×2
MES050 5,700 CFM · Kitchen Exhaust ×2
MES008 530 CFM · Exhaust Fan ×1
1 project · most recent 07/28/2026
Sprinkler System
FiledStatusContractorScope
07/28/2026Permit IssuedSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 07/28/2026
Concrete
FiledStatusContractorScope
07/28/2026Permit IssuedHARTZION ENTERPRISES CORPConcrete
2 projects · most recent 07/28/2026
Fence Scaffold Sidewalk Shed
FiledStatusContractorScope
07/28/2026Permit IssuedHARTZION ENTERPRISES CORPFence, Scaffold, Sidewalk Shed
07/16/2024Signed-offROYAL HOME IMPROVEMENTS IFence
▾Special Inspection Requirements (DOB NOW) — 83
DateRequirementInspectorRole
07/06/2026FinalFAHAD FATEHprogress
07/06/2026Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/26/2026Air barrier — testing FAHAD FATEHenergy_progress
06/26/2026Fenestration areasFAHAD FATEHenergy_progress
06/26/2026MeteringFAHAD FATEHenergy_progress
06/26/2026Maintenance informationFAHAD FATEHenergy_progress
06/26/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
06/26/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/26/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
06/26/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
06/26/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
06/26/2026Lowest Floor ElevationFAHAD FATEHprogress
06/26/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
06/26/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
06/26/2026Exterior lighting powerFAHAD FATEHenergy_progress
06/26/2026Fenestration air leakageFAHAD FATEHenergy_progress
06/26/2026Lighting controlsFAHAD FATEHenergy_progress
06/26/2026Interior lighting powerFAHAD FATEHenergy_progress
06/26/2026Electrical motors and elevatorsFAHAD FATEHenergy_progress
06/26/2026Lighting in dwelling unitsFAHAD FATEHenergy_progress
06/26/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
03/30/2026Maintenance informationFAHAD FATEHenergy_progress
03/30/2026Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
03/30/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/30/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)FAHAD FATEHspecial
Latest 25 of 83.
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/24/2026B01076137-I1Request digital key ↗
08/23/2026B01123344-S1Request digital key ↗
08/23/2026B01123344-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION3
01/05/2018321706828Open ↗
01/05/2018321706828Open ↗
01/05/2018321706828Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
03/06/2026340913097Open ↗
02/03/2026340913097Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/05/2018321706828Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
02/07/2018321706828Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/15/2026B00969850-P4Open ↗
08/15/2026B00969850-I1Open ↗
08/13/2026B00969850-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)3
08/15/2026B00969850-P4Open ↗
08/13/2026B00969850-I1Open ↗
08/13/2026B00969850-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/15/2026B00969850-P4Open ↗
08/13/2026B00969850-I1Open ↗
▸Seals & Professional Certifications55
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/24/2026B01076137-I1Open ↗
08/17/2026B00969850-I1Open ↗
08/17/2026B00969850-S1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/25/2026B00969850-P4Open ↗
09/25/2026B00969850-P4Open ↗
09/23/2026B00969850-Z9Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature15
09/25/2026B00969850-P4Open ↗
09/25/2026B00969850-P4Open ↗
09/25/2026B00969850-P4Open ↗
Showing 3 of 15 on file for this type
▸BISProfessional and Owner Certification (POC3)1
01/05/2018321706828Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/03/2026340913097Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
01/05/2018321706828Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
01/05/2018321706828Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00969850-I1Open ↗
08/13/2026B00969850-P1Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/05/2018321706828Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026B01123344-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01123344-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01123344-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01123344-I1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B00969850-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/16/2026B00969850-P1Open ↗
08/15/2026B00969850-P4Open ↗
08/15/2026B00969850-I1Open ↗
▸BISSTREET TREE CHECKLIST2
03/06/2026340913097Open ↗
02/03/2026340913097Open ↗
▸BISTenant Protection Plan and Notes1
01/05/2018321706828Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/03/2026340913097Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00969850-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/05/2018321706828Open ↗
▸DOB NOWRodent Control1
08/13/2026B01123344-I1Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01123344-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
01/05/2018321706828Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCONSTRUCTION CODE DETERMINATION1
01/05/2018321706828Open ↗
▸Filing & Intake Forms3
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
02/03/2026340913097Open ↗
▸BISEFILING COVER SHEET1
01/12/2018321706828Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/03/2026340913097Open ↗
▸Other Documents14
▸DOB NOWProperty Ownership Certification4
08/16/2026B00969850-P1Open ↗
08/15/2026B00969850-P4Open ↗
08/15/2026B00969850-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial3
08/15/2026B00969850-P4Open ↗
08/13/2026B00969850-P1Open ↗
08/13/2026B00969850-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/15/2026B00969850-P4Open ↗
08/13/2026B00969850-I1Open ↗
08/13/2026B00969850-P1Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/06/2026340913097Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01123344-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01123344-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01123344-I1Open ↗