1506 SOUTHERN BOULEVARD
BRONX · BIN 2130705
💬 Discuss this project
0Year Built
—Stories
D7Building Class
R7-1Zoning
22,305 sfGross Floor Area
31Units
4 Open Violations 0 unresolved · 4 paperwork only ▸
Elevator apt, semi-fireproof with stores · Owner of record: 1506 SOUTHERN, LLC · 5,000 sf lot · 4.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeGeneral
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 13 docs
Floor 6Under Construction86p · 1 filing · 20 docs
Floor 5Under Construction86p · 1 filing · 20 docs
Floor 4Under Construction87p · 1 filing · 20 docs
Floor 3Under Construction86p · 1 filing · 20 docs
Floor 2Under Construction95p · 2 filings · 20 docs
Floor 1Under Construction96p · 1 filing · 20 docs
CellarUnder Construction94p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO, INC503/22/2026
1506 SOUTHERN, LLC103/22/2026
KODRA CONSTRUCTION703/22/2026
KIRI CONSTRUCTION103/22/2026
KODRA CONSTRUCTION CORP 1103/22/2026
J&H ELECTRICAL CONTRACTING INC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/09/2021$1.3M—TRID LLC → 1506 SOUTHERN, LLC$59/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS1608/19/2026
ASR ENGINEERING PC107/30/2023
BADALY ENGINEERING PLLC108/18/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KC EXPEDITING INC103/21/2026
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KIRI CONSTRUCTION CORPGeneral Contractor1008/25/2026
KODRA CONSTRUCTION CORPGeneral Contractor407/08/2026
JASCO, INCGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing307/08/2026
J&H ELECTRICAL CONT INCElectrical203/22/2026
GO PRO FIRE PROTECTION CFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC71371408/19/2026
Building Lifecycle
All (164)Filed (18)Permit Issued (14)Signed Off (4)Violation (9)Inspection (14)Objection (72)Special Inspection (30)Tax Incentive (3)
08/24/2026
Permit issued — Support of Excavation
X00668558-S1-SE
08/19/2026
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P9
08/19/2026
Special inspection requirement — Fenestration areas
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Electrical motors and elevators
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Exterior lighting power
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Chimneys and vents
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Concrete - Cast-In-Place
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Heating Systems
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Masonry
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Mechanical Systems
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Structural Cold-Formed Steel
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Structural Steel - Details
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Structural Steel - High Strength Bolting
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Structural Steel - Welding
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Subgrade Inspections
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SOORJBALLY HARILALL
08/19/2026
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Final
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Footing and Foundation
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Lighting in dwelling units
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Air barrier — testing
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Interior lighting power
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Shutoff dampers
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Insulation placement and R values
MOHAMMAD BADALY
08/19/2026
Special inspection requirement — Air barrier - visual inspection
MOHAMMAD BADALY
06/29/2026
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P8
06/09/2026
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P7
05/29/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2026
Signed off — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-S4
05/27/2026
Signed off — Alteration
Provide new boilers in conjunction with NB application #X00668558
X00795779-I1
05/27/2026
Signed off — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-S2
07/31/2025
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P6
07/10/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/18/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/08/2025
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P5
05/02/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/18/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/11/2025
Permit issued — Curb Cut
X00668558-S4-CC
04/08/2025
Filed — Alteration
Provide new boilers in conjunction with NB application #X00668558
X00795779-P2
03/19/2025
Permit issued — Boiler Equipment
X00795779-I1-BE
03/18/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/14/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/01/2025
485-x construction completed
12/13/2024
Violation issued (ECB, closed)
Construction
11/14/2024
Permit issued — Foundation
X00668558-I1-GC-CX
10/30/2024
Permit issued — Plumbing
X00668558-S2-PL
10/30/2024
485-x registration filed
05/28/2024
Permit issued — Construction Fence
X00679137-I1-FN
05/28/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/24/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
05/24/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/08/2024
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-S4
04/30/2024
Filed — New Building
Proposed New Building 8-Stories, Mix-use & 29 residential units
X00668558-P4
Latest 60 of 164 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedKIRI CONSTRUCTION CORP08/24/2026
DOB NOWCurb CutSigned-offKIRI CONSTRUCTION CORP04/11/2025
DOB NOWBoiler EquipmentSigned-offINFINITI ESC PLUMBING COR03/19/2025
DOB NOWFoundationPermit IssuedKODRA CONSTRUCTION CORP11/14/2024
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR10/30/2024
DOB NOWConstruction FencePermit IssuedKIRI CONSTRUCTION CORP05/28/2024
DOB NOWSprinklersSigned-offINFINITI ESC PLUMBING COR10/31/2023
DOB NOWSprinklersSigned-offGO PRO FIRE PROTECTION C10/31/2023
DOB NOWMechanical SystemsPermit IssuedKODRA CONSTRUCTION CORP10/19/2023
DOB NOWSidewalk ShedSigned-offJASCO, INC07/31/2023
DOB NOWConstruction FencePermit IssuedKIRI CONSTRUCTION CORP04/19/2023
DOB NOWConstruction FencePermit IssuedKIRI CONSTRUCTION CORP04/11/2023
DOB NOWFoundationPermit IssuedKODRA CONSTRUCTION CORP01/03/2023
DOB NOWConstruction FencePermit IssuedKIRI CONSTRUCTION CORP04/15/2022
BIS—ISSUEDKODRA CONSTRUCTION CORP11/16/2022
BIS—ISSUEDKODRA CONSTRUCTION CORP06/17/2022
1 project · most recent 08/19/2026
Air Conditioning Systems Associated Ducts and Piping Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026Permit IssuedKIRI CONSTRUCTION CORPAir Conditioning Systems, Associated Ducts and Piping, Heating Systems, Ventilation Systems
Cooling
International Comfort Products PHB436000K000B0 48,000 BTU · Rooftop Unit ×1
PHD448000 48,000 BTU · Rooftop Unit ×4
Trane 4YCC4048A1070A 46,500 BTU · Condensing Unit ×1
Heating
International Comfort Products PHB436000K000B0 46,000 BTU · Rooftop Unit ×1
PHD448000 46,000 BTU · Rooftop Unit ×4
Trane 4YCC4048A1070A 70,000 BTU · Condensing Unit ×1
Ventilation
Floaire DDAR10 1,385 CFM ×11
Ducts & Piping
International Comfort Products PHB436000K000B0 20,000 BTU · Ductwork ×8
1 project · most recent 08/19/2026
Sprinkler System
FiledStatusContractorScope
08/19/2026Signed-offGO PRO FIRE PROTECTION CSprinkler System
1 project · most recent 08/19/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/19/2026Signed-offINFINITI ESC PLUMBING CORGas, Storm, Water/Sanitary
2 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026CompleteJ&H ELECTRICAL CONT INCGeneral Wiring
08/01/2023CompleteRICHARD NEU—
1 project · most recent 08/19/2026
Steel Masonry
FiledStatusContractorScope
08/19/2026Permit IssuedKIRI CONSTRUCTION CORPSteel, Masonry
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/29/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/18/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/02/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
04/18/2025Pass-Final Boiler Equipment InspectionPassView ↗
03/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/24/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
05/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/09/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/09/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/13/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/13/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/19/2026Fenestration and door U-factor and product ratingsMOHAMMAD BADALYenergy_progress
08/19/2026MeteringMOHAMMAD BADALYenergy_progress
08/19/2026Lighting controlsMOHAMMAD BADALYenergy_progress
08/19/2026Fenestration air leakageMOHAMMAD BADALYenergy_progress
08/19/2026Air barrier - visual inspectionMOHAMMAD BADALYenergy_progress
08/19/2026Chimneys and ventsMOHAMMAD BADALYspecial
08/19/2026Concrete - Cast-In-PlaceMOHAMMAD BADALYspecial
08/19/2026Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
08/19/2026Heating SystemsMOHAMMAD BADALYspecial
08/19/2026MasonryMOHAMMAD BADALYspecial
08/19/2026Mechanical SystemsMOHAMMAD BADALYspecial
08/19/2026Structural Cold-Formed SteelMOHAMMAD BADALYspecial
08/19/2026Structural Steel - DetailsMOHAMMAD BADALYspecial
08/19/2026Structural Steel - High Strength BoltingMOHAMMAD BADALYspecial
08/19/2026Structural Steel - WeldingMOHAMMAD BADALYspecial
08/19/2026Subgrade InspectionsMOHAMMAD BADALYspecial
08/19/2026Subsurface Investigations (Borings/Test Pits)SOORJBALLY HARILALLspecial
08/19/2026Energy Code Compliance InspectionsMOHAMMAD BADALYprogress
08/19/2026FinalMOHAMMAD BADALYprogress
08/19/2026Fire-Resistance Rated ConstructionMOHAMMAD BADALYprogress
08/19/2026Footing and FoundationMOHAMMAD BADALYprogress
08/19/2026Duct leakage testing, insulation and designMOHAMMAD BADALYenergy_progress
08/19/2026HVAC-R and service water heating system controlsMOHAMMAD BADALYenergy_progress
08/19/2026Lighting in dwelling unitsMOHAMMAD BADALYenergy_progress
08/19/2026Air barrier — testing MOHAMMAD BADALYenergy_progress
Latest 25 of 150.
▾Documents — 190 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/24/2026X00679137-I1Request digital key ↗
08/23/2026X00795779-P2Request digital key ↗
08/23/2026X00795779-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits5
▸BISWORK PERMIT APPLICATION2
11/17/2022220741044Open ↗
06/17/2022220741044Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
06/21/2024240359857Open ↗
02/02/2022220741044Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/21/2024240359857Open ↗
▸Zoning, Tax Lot & Property Records15
▸DOB NOWZD1: DOB Zoning Diagram7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P8Open ↗
08/16/2026X00668558-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P7Open ↗
08/16/2026X00668558-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00668558-I1Open ↗
▸Seals & Professional Certifications61
▸DOB NOWProgress Inspector Seal & Signature20
09/28/2026X00668558-P6Open ↗
09/26/2026X00668558-I1Open ↗
09/26/2026X00668558-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/28/2026X00668558-P6Open ↗
09/26/2026X00668558-I1Open ↗
09/26/2026X00668558-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/24/2026X00679137-I1Open ↗
08/23/2026X00795779-P1Open ↗
08/23/2026X00795779-P2Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
06/21/2024240359857Open ↗
10/31/2022240336579Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
06/17/2022220741044Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/21/2024240359857Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00668558-P3Open ↗
08/13/2026X00668558-P2Open ↗
08/13/2026X00668558-I1Open ↗
Showing 3 of 4 on file for this type
▸BISWATER CUT-OFF1
06/17/2022220741044Open ↗
▸BISELECTRIC CUT-OFF1
06/17/2022220741044Open ↗
▸Safety & Tenant Protection17
▸DOB NOWStreet Tree Checklist7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P8Open ↗
08/16/2026X00668558-P7Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
06/21/2024240359857Open ↗
05/15/2024240336579Open ↗
▸BISSTREET TREE CHECKLIST2
06/21/2024240359857Open ↗
05/15/2024240336579Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/17/2022220741044Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
11/17/2022220741044Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/17/2022220741044Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00668558-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00668558-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00668558-I1Open ↗
▸Environmental & Asbestos3
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/17/2022220741044Open ↗
06/17/2022220741044Open ↗
▸BISRODENT CONTROL1
11/17/2022220741044Open ↗
▸Energy Compliance5
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026X00668558-I1Open ↗
08/13/2026X00668558-S2Open ↗
08/13/2026X00795779-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/23/2026X00795779-I1Open ↗
08/15/2026X00668558-I1Open ↗
▸Inspections & Test Reports10
▸DOB NOWSOIL REPORT8
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P7Open ↗
08/16/2026X00668558-P8Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00668558-S1Open ↗
08/13/2026X00668558-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION6
11/17/2022220741044Open ↗
06/17/2022220741044Open ↗
06/17/2022220741044Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE2
11/17/2022220741044Open ↗
06/17/2022220741044Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION7
07/24/2025240359857Open ↗
06/26/2024240359857Open ↗
06/26/2024240359857Open ↗
Showing 3 of 7 on file for this type
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
06/21/2024240359857Open ↗
05/15/2024240336579Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/21/2024240359857Open ↗
10/31/2022240336579Open ↗
▸BISBOROUGH INTAKE FORM1
11/17/2022220741044Open ↗
▸BISEFILING COVER SHEET1
02/02/2022220741044Open ↗
▸Other Documents30
▸DOB NOWSite Survey: Initial7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P7Open ↗
08/16/2026X00668558-P8Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P8Open ↗
08/16/2026X00668558-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProperty Ownership Certification7
08/20/2026X00668558-P9Open ↗
08/16/2026X00668558-P1Open ↗
08/16/2026X00668558-P7Open ↗
Showing 3 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION5
12/06/2024240359857Open ↗
06/26/2024240359857Open ↗
06/26/2024240359857Open ↗
Showing 3 of 5 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
11/17/2022220741044Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/26/2024240359857Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00668558-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00668558-I1Open ↗