← Back
One story - permanent living quarter
151-25 27 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4109261
💬 Discuss this project
1950Year Built
1Stories
A2Building Class
R2AZoning
1,144 sfGross Floor Area
1Units
One story - permanent living quarter · 3,800 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/11/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
03/16/2026
Permit issued — Solar
Q01366774-I1-SL
03/11/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01366774-I1
03/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/11/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/03/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/03/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/16/2026
2 projects · most recent 03/14/2026
General Wiring
FiledStatusContractorScope
03/14/2026CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
03/11/2026CompleteSUNRUN SOLAR ELECTL CORP—
1 project · most recent 03/11/2026
FiledStatusContractorScope
03/11/2026Signed-offSUNRUN INSTALLATION SVC36 panels, 16.2 kw, 252.28 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/11/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/11/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/03/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/03/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/03/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026Q01366774-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01366774-I1Open ↗
08/26/2026Q01366774-I1Open ↗
08/26/2026Q01366774-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01366774-I1Open ↗
08/26/2026Q01366774-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026Q01366774-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026Q01366774-I1Open ↗