← Back
Cape Cod
151-26 BAYSIDE AVENUE
QUEENS · BIN 4109370
💬 Discuss this project
1945Year Built
1.5Stories
A0Building Class
R2AZoning
1,225 sfGross Floor Area
1Units
Cape Cod · Owner of record: 15126 CORP. · 4,858 sf lot · 0.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction5p · 1 filing · 14 docs
CellarUnder Construction3p · 1 filing · 14 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/23/2026$950K—15126 CORP → Private party$776/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LONGVIEW ENGINEERING, PLLC305/30/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SHIN-YANG CONSTRUCTION INGeneral Contractor104/09/2026
L&M PLUMBING LLCPlumbing106/27/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778103/06/2026
Building Lifecycle
All (16)Filed (3)Permit Issued (2)Inspection (2)Objection (4)Special Inspection (5)
07/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
06/25/2026
Permit issued — Plumbing
Q01367406-S1-PL
05/30/2026
Filed — Alteration
THE ALTERATION OF ROOM LAYOUT AT 1ST FLOOR OF AN EXISTING 1.5-STORY SINGLE FAMILY HOUSE WITH CELLAR. NO NEW CERTIFICATE OF OCCUPANCY IS REQUIRED.
Q01367406-P1
03/25/2026
Objection resolved — Addressed
03/24/2026
Objection resolved — Addressed
03/20/2026
Permit issued — General Construction
Q01367406-I1-GC-CX
03/20/2026
Objection raised — Scope
03/20/2026
Objection raised — Cost
03/09/2026
Filed — Alteration
THE ALTERATION OF ROOM LAYOUT AT 1ST FLOOR OF AN EXISTING 1.5-STORY SINGLE FAMILY HOUSE WITH CELLAR. NO NEW CERTIFICATE OF OCCUPANCY IS REQUIRED.
Q01367406-S1
03/06/2026
Filed — Alteration
THE ALTERATION OF ROOM LAYOUT AT 1ST FLOOR OF AN EXISTING 1.5-STORY SINGLE FAMILY HOUSE WITH CELLAR. NO NEW CERTIFICATE OF OCCUPANCY IS REQUIRED.
Q01367406-I1
03/04/2026
Special inspection requirement — Structural Steel - Details
XIONGCAI GU
03/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
XIONGCAI GU
03/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIONGCAI GU
03/04/2026
Special inspection requirement — Structural Wood Frame
XIONGCAI GU
03/04/2026
Special inspection requirement — Final
DENIS PORTAEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedL&M PLUMBING LLC06/25/2026
DOB NOWGeneral ConstructionPermit IssuedSHIN-YANG CONSTRUCTION IN03/20/2026
1 project · most recent 05/30/2026
Water/Sanitary
FiledStatusContractorScope
05/30/2026Permit IssuedL&M PLUMBING LLCWater/Sanitary
1 project · most recent 04/17/2026
General Wiring
FiledStatusContractorScope
04/17/2026Permit IssuedALL AROUND ELECTRIC CORP.General Wiring
1 project · most recent 05/30/2026
Wood
FiledStatusContractorScope
05/30/2026Permit IssuedL&M PLUMBING LLCWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/07/2026Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/04/2026Structural Steel - DetailsXIONGCAI GUspecial
03/04/2026Structural Steel - High Strength BoltingXIONGCAI GUspecial
03/04/2026Structural Stability – Alterations of existing buildingsXIONGCAI GUspecial
03/04/2026Structural Wood FrameXIONGCAI GUprogress
03/04/2026FinalDENIS PORTAEVprogress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026Q01367406-S1Request digital key ↗
08/16/2026Q01367406-I1Request digital key ↗
08/16/2026Q01367406-P1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026Q01367406-I1Open ↗
08/16/2026Q01367406-P1Open ↗
08/16/2026Q01367406-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/25/2026Q01367406-I1Open ↗
08/25/2026Q01367406-I1Open ↗
08/25/2026Q01367406-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01367406-I1Open ↗
08/25/2026Q01367406-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026Q01367406-P1Open ↗
08/16/2026Q01367406-S1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/16/2026Q01367406-I1Open ↗