← Back
Two family frame
151-34 19 AVENUE
QUEENS · BIN 4623012
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
3,299 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 5,000 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 21p · 1 filing · 8 docs
Floor 1
Cellar2p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MR GAO PROPERTY2507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/18/2023$2.6M—162ND STREET LLC → Private party$796/sf building
01/03/2022$1.1M—MR GAO PROPERTY INC → 162ND STREET LLC$349/sf building
06/04/2018$1.2M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC505/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK E SMALL PLBG&HTG INCPlumbing807/08/2026
TT&T CONSTRUCTION INCGeneral Contractor307/08/2026
ROCK E SMALL PLBG HTGGeneral Contractor203/22/2026
XIAOHONG ZHAOElectrical103/21/2026
THC CONSTRUCTION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506305/09/2023
Building Lifecycle
All (44)Filed (5)Permit Issued (7)Signed Off (4)Inspection (7)Special Inspection (21)
07/26/2023
Signed off — Alteration
Q00643865-I1
07/21/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/19/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#421922021
Q00571610-I1
07/13/2023
Signed off — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB#421922021
Q00571623-I1
06/30/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — Metering
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
05/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
05/09/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#421922021
Q00571610-P2
03/27/2023
Permit issued — Mechanical Systems
Q00571623-I1-MS
03/27/2023
Permit issued — Curb Cut
Q00643865-I1-CC
03/25/2023
Signed off — Alteration
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRSS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00607794-I1
03/14/2023
Permit issued — Plumbing
Q00571610-I1-PL
03/14/2023
Permit issued — Plumbing
Q00571610-I1-PL
09/26/2022
Permit issued — Construction Fence
Q00607794-I1-FN
05/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/13/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/22/2022
Permit issued — Plumbing
Q00571610-I1-PL
12/10/2021
Filed — Alteration
Q00643865-I1
10/08/2021
Permit issued — Construction Fence
Q00607794-I1-FN
10/06/2021
Filed — Alteration
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRSS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00607794-I1
08/23/2021
Filed — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB#421922021
Q00571623-I1
08/23/2021
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — Metering
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/05/2021
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB#421922021
Q00571610-I1
08/05/2021
Special inspection requirement — Final
XIAOHONG ZHAO
08/05/2021
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC03/27/2023
DOB NOWCurb CutSigned-offTHC CONSTRUCTION INC03/27/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/14/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC03/14/2023
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC09/26/2022
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC02/22/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC10/08/2021
BIS—ISSUEDTT&T CONSTRUCTION INC05/20/2023
BIS—ISSUEDTT&T CONSTRUCTION INC09/27/2022
BIS—ISSUEDTT&T CONSTRUCTION INC10/14/2021
BIS—ISSUEDTT&T CONSTRUCTION INC10/14/2021
1 project · most recent 03/31/2022
General Wiring
FiledStatusContractorScope
03/31/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/21/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
06/30/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
05/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/13/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/13/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/13/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
05/10/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
05/10/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
05/10/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
05/10/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
05/10/2023Permanent certificateXIAOHONG ZHAOenergy_progress
05/10/2023Maintenance informationXIAOHONG ZHAOenergy_progress
05/10/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
05/10/2023MeteringXIAOHONG ZHAOenergy_progress
05/10/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
05/10/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
08/23/2021Permanent certificateXIAOHONG ZHAOenergy_progress
08/23/2021Chimneys and ventsXIAOHONG ZHAOspecial
08/23/2021Heating SystemsXIAOHONG ZHAOspecial
08/23/2021Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/23/2021HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
08/23/2021MeteringXIAOHONG ZHAOenergy_progress
08/23/2021HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
08/23/2021Maintenance informationXIAOHONG ZHAOenergy_progress
08/23/2021HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
08/05/2021FinalXIAOHONG ZHAOprogress
08/05/2021Mechanical SystemsXIAOHONG ZHAOspecial
▾Documents — 126 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/27/2026Q00571623-I1Request digital key ↗
08/27/2026Q00607794-I1Request digital key ↗
08/26/2026Q00643865-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION7
05/02/2023421922021Open ↗
01/14/2022421922021Open ↗
09/02/2021421922021Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
10/19/2021421922021Open ↗
10/19/2021421922021Open ↗
10/19/2021421922021Open ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
04/27/2022421922021Open ↗
09/03/2021421922021Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
10/20/2020421922021Open ↗
▸BISVERIFY TAX LOT1
03/25/2023421922021Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/25/2023421922021Open ↗
▸Seals & Professional Certifications17
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00571623-I1Open ↗
08/13/2026Q00571610-I1Open ↗
08/13/2026Q00643865-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/19/2021421922021Open ↗
10/19/2021421922021Open ↗
10/19/2021421922021Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/02/2026Q00571623-I1Open ↗
09/02/2026Q00571623-I1Open ↗
08/26/2026Q00571610-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/02/2026Q00571623-I1Open ↗
08/26/2026Q00571610-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
08/07/2021440684323Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/07/2021440684323Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/25/2023421922021Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/25/2023421922021Open ↗
▸BISSPRINKLER SYSTEMS1
03/25/2023421922021Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/07/2023421922021Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
08/07/2021440684323Open ↗
08/06/2021421922021Open ↗
11/01/2019421922021Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
03/25/2023421922021Open ↗
▸BISSTREET TREE SIGNOFF1
07/19/2023421922021Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/08/2021421922021Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/08/2021421922021Open ↗
08/06/2021421922021Open ↗
07/27/2021421922021Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/19/2021421922021Open ↗
10/19/2021421922021Open ↗
11/01/2019421922021Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00571610-I1Open ↗
08/13/2026Q00571623-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
03/25/2023421922021Open ↗
▸BISINTERIOR LIGHTING POWER1
03/25/2023421922021Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/25/2023421922021Open ↗
▸BISFENESTRATION AREAS1
03/25/2023421922021Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
03/25/2023421922021Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/25/2023421922021Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/25/2023421922021Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/25/2023421922021Open ↗
▸BISLIGHTING CONTROLS1
03/25/2023421922021Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
08/22/2023421922021Open ↗
10/19/2021421922021Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/25/2023421922021Open ↗
10/08/2021421922021Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/25/2023421922021Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
10/08/2021421922021Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/25/2023421922021Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/17/2023421922021Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
10/08/2021421922021Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/25/2023421922021Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/25/2023421922021Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/25/2023421922021Open ↗
▸BISMASONRY1
03/25/2023421922021Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/25/2023421922021Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/06/2021421922021Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/25/2023421922021Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/25/2023421922021Open ↗
▸BISSOIL REPORT1
08/06/2021421922021Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
03/25/2023421922021Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE4
05/02/2023421922021Open ↗
09/02/2021421922021Open ↗
08/09/2021421922021Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/06/2021421922021Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
10/19/2021421922021Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
06/28/2023421922021Open ↗
10/12/2021421922021Open ↗
08/06/2021421922021Open ↗
▸BISEFILING COVER SHEET2
01/07/2021421784420Open ↗
11/01/2019421922021Open ↗
▸BISBOROUGH INTAKE FORM2
10/19/2021421922021Open ↗
01/07/2021421784420Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/07/2021440684323Open ↗
▸Other Documents12
▸BISBPP - SUPPORTING DOCUMENTATION4
12/08/2021440684323Open ↗
12/08/2021440684323Open ↗
12/08/2021440684323Open ↗
Showing 3 of 4 on file for this type
▸BISPLOT DIAGRAM2
08/06/2021421922021Open ↗
10/20/2020421922021Open ↗
▸BISELECTRIC VEHICLE SERVICE EQUIPMENT REQUIREMENTS1
03/25/2023421922021Open ↗
▸BISMAINTENANCE INFORMATION1
03/25/2023421922021Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
03/25/2023421922021Open ↗
▸BISPERMANENT CERTIFICATE1
03/25/2023421922021Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/25/2023421922021Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
03/25/2023421922021Open ↗