← Back
Two stories - detached, small or mid-size
151-37 28 AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4109298
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2AZoning
2,156 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,000 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof1p · 1 filing · 19 docs
Cellar2p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SPLEN CONSTRUCTION1103/22/2026
SPEN CONSTRUCTION INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT408/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor207/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513308/31/2022
Building Lifecycle
All (34)Filed (4)Permit Issued (4)Signed Off (2)Violation (12)Inspection (5)Special Inspection (7)
08/08/2023
Signed off — Alteration
PLUMBING WORK OF ONE-FAMILY DETACHED RESIDENCE ENLARGEMENT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00388191-I1
08/02/2023
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH ALT1 JOB.
Q00388193-I1
09/12/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/12/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/12/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/07/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/02/2022
Permit issued — Construction Fence
Q00388193-I1-FN
09/01/2022
Violation issued (ECB, closed)
Construction
08/31/2022
Filed — Alteration
PLUMBING WORK OF ONE-FAMILY DETACHED RESIDENCE ENLARGEMENT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00388191-P2
08/31/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/31/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/19/2022
Permit issued — Plumbing
Q00388191-I1-PL
08/02/2022
Filed — Alteration
PLUMBING WORK OF ONE-FAMILY DETACHED RESIDENCE ENLARGEMENT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00388191-P1
08/02/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/02/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/02/2022
Special inspection requirement — HVAC and service water heating equipment
DEZHANG FANG
08/02/2022
Special inspection requirement — HVAC and service water heating system controls
DEZHANG FANG
08/02/2022
Special inspection requirement — HVAC insulation and sealing
DEZHANG FANG
07/01/2022
Violation issued (ECB, closed)
Construction
12/14/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
11/29/2021
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (ECB, closed)
Construction
10/25/2021
Violation issued (ECB, closed)
Construction
08/12/2021
Permit issued — Plumbing
Q00388191-I1-PL
07/21/2021
Permit issued — Construction Fence
Q00388193-I1-FN
05/05/2021
Filed — Alteration
PLUMBING WORK OF ONE-FAMILY DETACHED RESIDENCE ENLARGEMENT AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00388191-I1
05/04/2021
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH IN CONJUNCTION WITH ALT1 JOB.
Q00388193-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC09/02/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC08/19/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC08/12/2021
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC07/21/2021
BIS—ISSUEDL&L CONSTRUCTION DEVELOP12/16/2022
BIS—ISSUEDSPLEN CONSTRUCTION INC03/02/2022
BIS—ISSUEDSPLEN CONSTRUCTION INC08/04/2021
2 projects · most recent 10/28/2021
General Wiring
FiledStatusContractorScope
10/28/2021CompleteINTELOGIC ELECTRIC, INC.—
10/08/2021CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
09/12/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/12/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/12/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/07/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
08/31/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/31/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
08/02/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/02/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
08/02/2022HVAC and service water heating equipment DEZHANG FANGenergy_progress
08/02/2022HVAC and service water heating system controls DEZHANG FANGenergy_progress
08/02/2022HVAC insulation and sealing DEZHANG FANGenergy_progress
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026Q00388191-I1Request digital key ↗
08/26/2026Q00388191-P2Request digital key ↗
08/26/2026Q00388191-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00388193-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
06/09/2023440621301Open ↗
11/08/2021440621301Open ↗
09/11/2020440621301Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/04/2023440621301Open ↗
▸BISWORK PERMIT APPLICATION1
08/04/2021440621301Open ↗
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
07/23/2021440621301Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
08/04/2021440621301Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
08/10/2023440621301Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/10/2023440621301Open ↗
▸BISZONING DIAGRAM1
04/27/2021440621301Open ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/20/2026Q00388191-P1Open ↗
09/20/2026Q00388191-P1Open ↗
09/20/2026Q00388191-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00388193-I1Open ↗
08/13/2026Q00388191-P2Open ↗
08/13/2026Q00388191-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/20/2026Q00388191-P1Open ↗
08/26/2026Q00388191-P2Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
09/11/2020440621301Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/11/2020440621301Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/21/2023440621301Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/21/2023440621301Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/11/2023440621301Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
09/11/2020440621301Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026Q00388191-P1Open ↗
08/13/2026Q00388191-I1Open ↗
08/13/2026Q00388191-P2Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/11/2020440621301Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
08/10/2023440621301Open ↗
08/04/2021440621301Open ↗
03/23/2021440621301Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/11/2020440621301Open ↗
▸BISFENESTRATION AIR LEAKAGE1
08/21/2023440621301Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/21/2023440621301Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/21/2023440621301Open ↗
▸BISFENESTRATION AREAS1
08/21/2023440621301Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/21/2023440621301Open ↗
▸BISLIGHTING IN DWELLING UNITS1
08/21/2023440621301Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/21/2023440621301Open ↗
▸BISLIGHTING CONTROLS1
08/21/2023440621301Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/10/2023440621301Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00388191-I1Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY4
08/10/2023440621301Open ↗
08/04/2021440621301Open ↗
07/23/2021440621301Open ↗
Showing 3 of 4 on file for this type
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
08/21/2023440621301Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/21/2023440621301Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
08/21/2023440621301Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/21/2023440621301Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
08/21/2023440621301Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/21/2023440621301Open ↗
▸BISMASONRY1
08/21/2023440621301Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
08/21/2023440621301Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
08/21/2023440621301Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/21/2023440621301Open ↗
▸Approvals, Objections & Sign-offs2
▸BISSUPERSEDING LETTER1
02/01/2023440621301Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
09/11/2020440621301Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
04/27/2021440621301Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/10/2023440621301Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION6
06/21/2023440621301Open ↗
11/12/2021440621301Open ↗
08/04/2021440621301Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM1
02/01/2023440621301Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/11/2020440621301Open ↗
▸Other Documents11
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION4
04/26/2021440621301Open ↗
04/26/2021440621301Open ↗
04/16/2021440621301Open ↗
Showing 3 of 4 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
10/30/2020440621301Open ↗
▸BISMAINTENANCE INFORMATION1
08/21/2023440621301Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
08/21/2023440621301Open ↗
▸BISPERMANENT CERTIFICATE1
08/21/2023440621301Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
08/21/2023440621301Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
08/21/2023440621301Open ↗
▸BISPLOT DIAGRAM1
09/11/2020440621301Open ↗