← Back
Two family frame
151-39 21 AVENUE
QUEENS · Whitestone-Beechhurst · BIN 4106956
💬 Discuss this project
1970Year Built
2Stories
B2Building Class
R3AZoning
4,112 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 1.03 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR105/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281105/22/2026
Building Lifecycle
All (10)Filed (1)Permit Issued (1)Inspection (3)Special Inspection (5)
09/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2026
Permit issued — Solar
Q01406043-I1-SL
05/22/2026
Filed — Alteration
Installation of solar panels, rooftop, grid tied, railed, 20 panels, 8.2 KW
Q01406043-I1
05/22/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
05/22/2026
Special inspection requirement — Air barrier - visual inspection
Mina Makar
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
05/21/2026
Special inspection requirement — Final
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR05/28/2026
1 project · most recent 05/22/2026
FiledStatusContractorScope
05/22/2026Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 05/22/2026
FiledStatusContractorScope
05/22/2026Permit IssuedMOMENTUM SOLAR20 panels, 8.2 kw, 352 roof_area_sqft
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/22/2026Structural Stability – Alterations of existing buildingsMina Makarspecial
05/22/2026Air barrier - visual inspectionMina Makarenergy_progress
05/21/2026Fire-Resistant Penetrations and JointsMina Makarspecial
05/21/2026Energy Code Compliance InspectionsMina Makarprogress
05/21/2026FinalMina Makarprogress
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01406043-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026Q01406043-I1Open ↗
08/23/2026Q01406043-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01406043-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026Q01406043-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01406043-I1Open ↗