Two stories - detached, small or mid-size
151-49 WILLETS POINT BLVD
QUEENS · BIN 4107031
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R2AZoning
2,134 sfGross Floor Area
1Units
0 Open Violations
Two stories - detached, small or mid-size · 4,165 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Floor 217p · 2 filings · 20 docs
Floor 118p · 1 filing · 20 docs
Cellar18p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARISTON CONSTRUCTION CO I303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JLS DESIGNS811/15/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTON CONSTRUCTION CO INCGeneral Contractor803/21/2026
WATER DYNAMIC P & H CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323211/15/2024
DOYUN KIM; RA7415503/15/2024
Building Lifecycle
All (76)Filed (8)Permit Issued (5)Signed Off (3)Violation (4)Inspection (8)Objection (18)Special Inspection (30)
12/31/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 2ND FLOOR ADDITION TO AN EXISTING ONE FAMILY ONE STROY DWELLING AND RENOVATE INTERIOR
Q00538156-I1
12/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
William Alicea
12/03/2024
Special inspection requirement — Mechanical Systems
William Alicea
12/03/2024
Special inspection requirement — Structural Steel - Welding
William Alicea
12/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
William Alicea
12/03/2024
Special inspection requirement — Chimneys and vents
William Alicea
12/03/2024
Special inspection requirement — Masonry
William Alicea
12/03/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
William Alicea
12/03/2024
Special inspection requirement — Footing and Foundation
DOYUN KIM
12/03/2024
Special inspection requirement — Energy Code Compliance Inspections
DOYUN KIM
12/03/2024
Special inspection requirement — Final
JEFFREY BELL
12/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
DOYUN KIM
12/03/2024
Special inspection requirement — Preliminary
DOYUN KIM
12/03/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
William Alicea
12/03/2024
Special inspection requirement — Permanent certificate
JEFFREY BELL
12/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
JEFFREY BELL
12/03/2024
Special inspection requirement — Fireplaces
JEFFREY BELL
12/03/2024
Special inspection requirement — Insulation placement and R values
JEFFREY BELL
12/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
JEFFREY BELL
12/03/2024
Special inspection requirement — Shutoff dampers
JEFFREY BELL
12/03/2024
Special inspection requirement — Ventilation and air distribution system
JEFFREY BELL
12/03/2024
Special inspection requirement — HVAC-R and service water heating equipment
JEFFREY BELL
12/03/2024
Special inspection requirement — Air barrier - visual inspection
JEFFREY BELL
12/03/2024
Special inspection requirement — Duct leakage testing, insulation and design
JEFFREY BELL
12/03/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
JEFFREY BELL
12/03/2024
Special inspection requirement — Maintenance information
JEFFREY BELL
12/03/2024
Special inspection requirement — Interior lighting power
DOYUN KIM
12/03/2024
Special inspection requirement — Fenestration areas
JEFFREY BELL
12/03/2024
Special inspection requirement — Fenestration air leakage
JEFFREY BELL
11/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 2ND FLOOR ADDITION TO AN EXISTING ONE FAMILY ONE STROY DWELLING AND RENOVATE INTERIOR
Q00538156-P5
10/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
William Alicea
03/15/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 2ND FLOOR ADDITION TO AN EXISTING ONE FAMILY ONE STROY DWELLING AND RENOVATE INTERIOR
Q00538156-P4
02/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2024
Signed off — Alteration
RELOCATION, REMOVAL AND INSTALLATION OF GAS AND PLUMBING FIXTURES
Q00538572-I1
12/19/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/05/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/29/2023
Signed off — Alteration
TEMP CONSTRUCTION FENCE
Q00538600-I1
09/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2023
Objection resolved — Addressed
07/31/2023
Objection raised — Scope
07/24/2023
Objection resolved — Addressed
07/24/2023
Objection resolved — Addressed
07/20/2023
Objection raised — Zoning
07/20/2023
Objection raised — Zoning
07/12/2023
Objection resolved — Addressed
06/24/2023
Objection raised — Zoning
06/20/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED 2ND FLOOR ADDITION TO AN EXISTING ONE FAMILY ONE STROY DWELLING AND RENOVATE INTERIOR
Q00538156-P2
05/02/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/28/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2023
Filed — Alteration
RELOCATION, REMOVAL AND INSTALLATION OF GAS AND PLUMBING FIXTURES
Q00538572-P1
03/21/2023
Permit issued — Foundation
Q00538156-I1-GC-CX
03/21/2023
Permit issued — Construction Fence
Q00538600-I1-FN
10/18/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/14/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/17/2022
Permit issued — Plumbing
Q00538572-I1-PL
06/23/2022
Violation issued (ECB, closed)
Construction
06/23/2022
Violation issued (ECB, closed)
Construction
06/23/2022
Violation issued (ECB, closed)
Construction
06/23/2022
Violation issued (ECB, closed)
Unknown
Latest 60 of 76 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedARISTON CONSTRUCTION CO I03/21/2023
DOB NOWConstruction FenceSigned-offARISTON CONSTRUCTION CO I03/21/2023
DOB NOWPlumbingSigned-offHYDRO PLBG & HTG CORP08/17/2022
DOB NOWGeneral ConstructionPermit IssuedARISTON CONSTRUCTION CO I04/19/2022
DOB NOWConstruction FenceSigned-offARISTON CONSTRUCTION CO I02/17/2022
1 project · most recent 11/15/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/15/2024Permit IssuedARISTON CONSTRUCTION CO IAir Conditioning Systems, Ventilation Systems
Cooling
Rheem RA1630AJ1NA 29,000 BTU · Split System ×2
CU1-RA1630AJ1NA 29,000 BTU · Split System ×2
CU2-RA1630AJ1NA 29,000 BTU · Split System ×2
Lg ARUN060GSS4 640,000 BTU · Vrf Outdoor ×6
Ventilation
Delta RG-R811A 50 CFM · Exhaust Fan ×12
SLM50 50 CFM · Exhaust Fan ×8
Air King cp57iqt369sb 270 CFM ×3
ESDQ 270 CFM · Exhaust Fan ×2
Lg ARVU063ZEA2 590 CFM · Vrf Outdoor ×5
1 project · most recent 01/05/2024
General Wiring
FiledStatusContractorScope
01/05/2024CompleteBIG CITY ELECL SOLUTIONSGeneral Wiring
1 project · most recent 11/15/2024
FiledStatusContractorScope
11/15/2024Permit IssuedARISTON CONSTRUCTION CO I5 scope_items
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
02/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/02/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/28/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
12/03/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
12/03/2024FinalJEFFREY BELLprogress
12/03/2024Concrete - Cast-In-PlaceWilliam Aliceaspecial
12/03/2024Energy Code Compliance InspectionsDOYUN KIMprogress
12/03/2024Footing and FoundationDOYUN KIMprogress
12/03/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWilliam Aliceaspecial
12/03/2024MasonryWilliam Aliceaspecial
12/03/2024Exterior Insulation and Finish Systems (EIFS)William Aliceaspecial
12/03/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
12/03/2024Structural Steel - WeldingWilliam Aliceaspecial
12/03/2024Mechanical SystemsWilliam Aliceaspecial
12/03/2024Chimneys and ventsWilliam Aliceaspecial
12/03/2024Fire-Resistance Rated ConstructionDOYUN KIMprogress
12/03/2024PreliminaryDOYUN KIMprogress
12/03/2024Fenestration air leakageJEFFREY BELLenergy_progress
12/03/2024Permanent certificateJEFFREY BELLenergy_progress
12/03/2024HVAC-R and service water piping design and insulationJEFFREY BELLenergy_progress
12/03/2024FireplacesJEFFREY BELLenergy_progress
12/03/2024Insulation placement and R valuesJEFFREY BELLenergy_progress
12/03/2024HVAC-R and service water heating system controlsJEFFREY BELLenergy_progress
12/03/2024Shutoff dampersJEFFREY BELLenergy_progress
12/03/2024Ventilation and air distribution systemJEFFREY BELLenergy_progress
12/03/2024HVAC-R and service water heating equipmentJEFFREY BELLenergy_progress
12/03/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
12/03/2024Duct leakage testing, insulation and designJEFFREY BELLenergy_progress
Latest 25 of 84.
▾Documents — 71 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00538600-I1Request digital key ↗
08/24/2026Q00538572-P1Request digital key ↗
08/24/2026Q00538572-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026Q00538156-P4Open ↗
08/13/2026Q00538156-P5Open ↗
08/13/2026Q00538156-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00538156-I1Open ↗
▸Seals & Professional Certifications30
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026Q00538156-P1Open ↗
08/30/2026Q00538156-I1Open ↗
08/30/2026Q00538156-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/23/2026Q00538156-P1Open ↗
09/23/2026Q00538156-P1Open ↗
09/19/2026Q00538572-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026Q00538572-P1Open ↗
08/24/2026Q00538572-I1Open ↗
08/13/2026Q00538600-I1Open ↗
Showing 3 of 8 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00538156-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00538156-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00538156-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026Q00538572-I1Open ↗
08/24/2026Q00538572-P1Open ↗
08/13/2026Q00538156-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWACP5/20/21 or V51
08/24/2026Q00538572-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00538156-I1Open ↗
▸Other Documents15
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/13/2026Q00538156-P1Open ↗
08/13/2026Q00538156-P4Open ↗
08/13/2026Q00538156-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSURVEY: INITIAL5
08/13/2026Q00538156-I1Open ↗
08/13/2026Q00538156-P4Open ↗
08/13/2026Q00538156-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00538156-I1Open ↗
08/13/2026Q00538156-P2Open ↗
08/13/2026Q00538156-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026Q00538156-I1Open ↗